Abstract: The method of modeling is the key technology for
digital mockup (DMU). Based upon the developing for mechanical
product DMU, the theory, method and approach for virtual
environment (VE) and virtual object (VO) were studied. This paper
has expounded the design goal and architecture of DMU system,
analyzed the method of DMU application, and researched the general
process of physics modeling and behavior modeling.
Abstract: In many cases, there are some time lag between the consumption of inputs and the production of outputs. This time lag effect should be considered in evaluating the performance of organizations. Recently, a couple of DEA models were developed for considering time lag effect in efficiency evaluation of research activities. Multi-periods input(MpI) and Multi-periods output(MpO) models are integrate models to calculate simple efficiency considering time lag effect. However, these models can’t discriminate efficient DMUs because of the nature of basic DEA model in which efficiency scores are limited to ‘1’. That is, efficient DMUs can’t be discriminated because their efficiency scores are same. Thus, this paper suggests a super-efficiency model for efficiency evaluation under the consideration of time lag effect based on the MpO model. A case example using a long term research project is given to compare the suggested model with the MpO model.
Abstract: Sub-prime mortgage crisis which began in the US is
regarded as the most economic crisis since the Great Depression in the
early 20th century. Especially, hidden problems on efficient operation
of a business were disclosed at a time and many financial institutions
went bankrupt and filed for court receivership. The collapses of
physical market lead to bankruptcy of manufacturing and construction
businesses. This study is to analyze dynamic efficiency of construction
businesses during the five years at the turn of the global financial
crisis. By discovering the trend and stability of efficiency of a
construction business, this study-s objective is to improve
management efficiency of a construction business in the
ever-changing construction market. Variables were selected by
analyzing corporate information on top 20 construction businesses in
Korea and analyzed for static efficiency in 2008 and dynamic
efficiency between 2006 and 2010. Unlike other studies, this study
succeeded in deducing efficiency trend and stability of a construction
business for five years by using the DEA/Window model. Using the
analysis result, efficient and inefficient companies could be figured
out. In addition, relative efficiency among DMU was measured by
comparing the relationship between input and output variables of
construction businesses. This study can be used as a literature to
improve management efficiency for companies with low efficiency
based on efficiency analysis of construction businesses.
Abstract: This paper considers a multi criteria cell formation
problem in Cellular Manufacturing System (CMS). Minimizing the
number of voids and exceptional elements in cells simultaneously are
two proposed objective functions. This problem is an Np-hard
problem according to the literature, and therefore, we can-t find the
optimal solution by an exact method. In this paper we developed two
ant algorithms, Ant Colony Optimization (ACO) and Max-Min Ant
System (MMAS), based on Data Envelopment Analysis (DEA). Both
of them try to find the efficient solutions based on efficiency concept
in DEA. Each artificial ant is considered as a Decision Making Unit
(DMU). For each DMU we considered two inputs, the values of
objective functions, and one output, the value of one for all of them.
In order to evaluate performance of proposed methods we provided
an experimental design with some empirical problem in three
different sizes, small, medium and large. We defined three different
criteria that show which algorithm has the best performance.
Abstract: Data Envelopment Analysis (DEA) is a methodology
that computes efficiency values for decision making units (DMU) in a
given period by comparing the outputs with the inputs. In many cases,
there are some time lag between the consumption of inputs and the
production of outputs. For a long-term research project, it is hard to
avoid the production lead time phenomenon. This time lag effect
should be considered in evaluating the performance of organizations.
This paper suggests a model to calculate efficiency values for the
performance evaluation problem with time lag. In the experimental
part, the proposed methods are compared with the CCR and an
existing time lag model using the data set of the 21st century frontier
R&D program which is a long-term national R&D program of Korea.
Abstract: In this paper we have proposed a methodology to
develop an amperometric biosensor for the analysis of glucose
concentration using a simple microcontroller based data acquisition
system. The work involves the development of Detachable
Membrane Unit (enzyme based biomembrane) with immobilized
glucose oxidase on the membrane and interfacing the same to the
signal conditioning system. The current generated by the biosensor
for different glucose concentrations was signal conditioned, then
acquired and computed by a simple AT89C51-microcontroller. The
optimum operating parameters for the better performance were found
and reported. The detailed performance evaluation of the biosensor
has been carried out. The proposed microcontroller based biosensor
system has the sensitivity of 0.04V/g/dl, with a resolution of
50mg/dl. It has exhibited very good inter day stability observed up to
30 days. Comparing to the reference method such as HPLC, the
accuracy of the proposed biosensor system is well within ± 1.5%.
The system can be used for real time analysis of glucose
concentration in the field such as, food and fermentation and clinical
(In-Vitro) applications.
Abstract: A DEA model can generally evaluate the performance
using multiple inputs and outputs for the same period. However, it is
hard to avoid the production lead time phenomenon some times, such
as long-term project or marketing activity. A couple of models have
been suggested to capture this time lag issue in the context of DEA.
This paper develops a dual-MPO model to deal with time lag effect in
evaluating efficiency. A numerical example is also given to show that
the proposed model can be used to get efficiency and reference set of
inefficient DMUs and to obtain projected target value of input
attributes for inefficient DMUs to be efficient.
Abstract: An original DEA model is to evaluate each DMU
optimistically, but the interval DEA Model proposed in this paper
has been formulated to obtain an efficiency interval consisting of
Evaluations from both the optimistic and the pessimistic view points.
DMUs are improved so that their lower bounds become so large as to
attain the maximum Value one. The points obtained by this method
are called ideal points. Ideal PPS is calculated by ideal of efficiency
DMUs. The purpose of this paper is to rank DMUs by this ideal PPS.
Finally we extend the efficiency interval of a DMU under variable
RTS technology.