Abstract: Fishery lights on the surface could be detected by the Day and Night Band (DNB) of the Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi National Polar-orbiting Partnership (Suomi-NPP). The DNB covers the spectral range of 500 to 900 nm and realized a higher sensitivity. The DNB has a difficulty of identification of fishing lights from lunar lights reflected by clouds, which affects observations for the half of the month. Fishery lights and lights of the surface are identified from lunar lights reflected by clouds by a method using the DNB and the infrared band, where the detection limits are defined as a function of the brightness temperature with a difference from the maximum temperature for each level of DNB radiance and with the contrast of DNB radiance against the background radiance. Fishery boats or structures on islands could be detected by the Synthetic Aperture Radar (SAR) on the polar orbit satellites using the reflected microwave by the surface reflecting targets. The SAR has a difficulty of tradeoff between spatial resolution and coverage while detecting the small targets like fishery boats. A distribution of fishery boats and island activities were detected by the scan-SAR narrow mode of Radarsat-2, which covers 300 km by 300 km with various combinations of polarizations. The fishing boats were detected as a single pixel of highly scattering targets with the scan-SAR narrow mode of which spatial resolution is 30 m. As the look angle dependent scattering signals exhibits the significant differences, the standard deviations of scattered signals for each look angles were taken into account as a threshold to identify the signal from fishing boats and structures on the island from background noise. It was difficult to validate the detected targets by DNB with SAR data because of time lag of observations for 6 hours between midnight by DNB and morning or evening by SAR. The temporal changes of island activities were detected as a change of mean intensity of DNB for circular area for a certain scale of activities. The increase of DNB mean intensity was corresponding to the beginning of dredging and the change of intensity indicated the ending of reclamation and following constructions of facilities.
Abstract: We formulate and analyze a mathematical model
describing dynamics of the hypothalamus-pituitary-thyroid
homoeostatic mechanism in endocrine system. We introduce
to this system two types of couplings and delay. In our model,
feedback controls the secretion of thyroid hormones and delay
reflects time lags required for transportation of the hormones. The
influence of delayed feedback on the stability behaviour of the
system is discussed. Analytical results are illustrated by numerical
examples of the model dynamics. This system of equations describes
normal activity of the thyroid and also a couple of types of
malfunctions (e.g. hyperthyroidism).
Abstract: There exists some time lag between the consumption of
inputs and the production of outputs. This time lag effect should be
considered in calculating efficiency of decision making units (DMU).
Recently, a couple of DEA models were developed for considering
time lag effect in efficiency evaluation of research activities. However,
these models can’t discriminate efficient DMUs because of the nature
of basic DEA model in which efficiency scores are limited to ‘1’. This
problem can be resolved a super-efficiency model. However, a super
efficiency model sometimes causes infeasibility problem. This paper
suggests an output oriented super-efficiency model for efficiency
evaluation under the consideration of time lag effect. A case example
using a long term research project is given to compare the suggested
model with the MpO model.
Abstract: Pore water pressure is normally because of
consolidation, compaction and water level fluctuation on reservoir.
Measuring, controlling and analyzing of pore water pressure have
significant importance in both of construction and operation period.
Since end of 2002, (dam start up) nature of KARKHEH dam has
been analyzed by using the gathered information from
instrumentation system of dam. In this lecture dam condition after
start up have been analyzed by using the gathered data from located
piezometers in core of dam. According to TERZAGHI equation and
records of piezometers, consolidation lasted around five years during
early years of construction stage, and current pore water pressure in
core of dam is caused by water level fluctuation in reservoir.
Although there is time lag between water level fluctuation and results
of piezometers. These time lags have been checked and the results
clearly show that one of the most important causes of it is distance
between piezometer and reservoir.
Abstract: In many cases, there are some time lag between the consumption of inputs and the production of outputs. This time lag effect should be considered in evaluating the performance of organizations. Recently, a couple of DEA models were developed for considering time lag effect in efficiency evaluation of research activities. Multi-periods input(MpI) and Multi-periods output(MpO) models are integrate models to calculate simple efficiency considering time lag effect. However, these models can’t discriminate efficient DMUs because of the nature of basic DEA model in which efficiency scores are limited to ‘1’. That is, efficient DMUs can’t be discriminated because their efficiency scores are same. Thus, this paper suggests a super-efficiency model for efficiency evaluation under the consideration of time lag effect based on the MpO model. A case example using a long term research project is given to compare the suggested model with the MpO model.
Abstract: Biochemical Oxygen Demand (BOD) is a measure of
the oxygen used in bacteria mediated oxidation of organic substances
in water and wastewater. Theoretically an infinite time is required for
complete biochemical oxidation of organic matter, but the
measurement is made over 5-days at 20 0C or 3-days at 27 0C test
period with or without dilution. Researchers have worked to further
reduce the time of measurement.
The objective of this paper is to review advancement made in
BOD measurement primarily to minimize the time and negate the
measurement difficulties. Survey of literature review in four such
techniques namely BOD-BARTTM, Biosensors, Ferricyanidemediated
approach, luminous bacterial immobilized chip method.
Basic principle, method of determination, data validation and their
advantage and disadvantages have been incorporated of each of the
methods.
In the BOD-BARTTM method the time lag is calculated for the
system to change from oxidative to reductive state. BIOSENSORS
are the biological sensing element with a transducer which produces
a signal proportional to the analyte concentration. Microbial species
has its metabolic deficiencies. Co-immobilization of bacteria using
sol-gel biosensor increases the range of substrate. In ferricyanidemediated
approach, ferricyanide has been used as e-acceptor instead
of oxygen. In Luminous bacterial cells-immobilized chip method,
bacterial bioluminescence which is caused by lux genes was
observed. Physiological responses is measured and correlated to
BOD due to reduction or emission.
There is a scope to further probe into the rapid estimation of BOD.
Abstract: In this paper the development of a heat exchanger as a
pilot plant for educational purpose is discussed and the use of neural
network for controlling the process is being presented. The aim of the
study is to highlight the need of a specific Pseudo Random Binary
Sequence (PRBS) to excite a process under control. As the neural
network is a data driven technique, the method for data generation
plays an important role. In light of this a careful experimentation
procedure for data generation was crucial task. Heat exchange is a
complex process, which has a capacity and a time lag as process
elements. The proposed system is a typical pipe-in- pipe type heat
exchanger. The complexity of the system demands careful selection,
proper installation and commissioning. The temperature, flow, and
pressure sensors play a vital role in the control performance. The
final control element used is a pneumatically operated control valve.
While carrying out the experimentation on heat exchanger a welldrafted
procedure is followed giving utmost attention towards safety
of the system. The results obtained are encouraging and revealing
the fact that if the process details are known completely as far as
process parameters are concerned and utilities are well stabilized then
feedback systems are suitable, whereas neural network control
paradigm is useful for the processes with nonlinearity and less
knowledge about process. The implementation of NN control
reinforces the concepts of process control and NN control paradigm.
The result also underlined the importance of excitation signal
typically for that process. Data acquisition, processing, and
presentation in a typical format are the most important parameters
while validating the results.
Abstract: Data Envelopment Analysis (DEA) is a methodology
that computes efficiency values for decision making units (DMU) in a
given period by comparing the outputs with the inputs. In many cases,
there are some time lag between the consumption of inputs and the
production of outputs. For a long-term research project, it is hard to
avoid the production lead time phenomenon. This time lag effect
should be considered in evaluating the performance of organizations.
This paper suggests a model to calculate efficiency values for the
performance evaluation problem with time lag. In the experimental
part, the proposed methods are compared with the CCR and an
existing time lag model using the data set of the 21st century frontier
R&D program which is a long-term national R&D program of Korea.
Abstract: A DEA model can generally evaluate the performance
using multiple inputs and outputs for the same period. However, it is
hard to avoid the production lead time phenomenon some times, such
as long-term project or marketing activity. A couple of models have
been suggested to capture this time lag issue in the context of DEA.
This paper develops a dual-MPO model to deal with time lag effect in
evaluating efficiency. A numerical example is also given to show that
the proposed model can be used to get efficiency and reference set of
inefficient DMUs and to obtain projected target value of input
attributes for inefficient DMUs to be efficient.