Abstract: With the strengthened regulation on the mandatory use
of recycled aggregate, development of construction materials using
recycled aggregate has recently increased. This study aimed to secure
the performance of asphalt concrete mixture by developing
recycled-modified asphalt using recycled basalt aggregate from the
Jeju area. The strength of the basalt aggregate from the Jeju area used
in this study was similar to that of general aggregate, while the specific
surface area was larger due to the development of pores. Modified
asphalt was developed using a general aggregate-recycled aggregate
ratio of 7:3, and the results indicated that the Marshall stability
increased by 27% compared to that of asphalt concrete mixture using
only general aggregate, and the flow values showed similar levels.
Also, the indirect tensile strength increased by 79%, and the toughness
increased by more than 100%. In addition, the TSR for examining
moisture resistance was 0.95 indicating that the reduction in the
indirect tensile strength due to moisture was very low (5% level), and
the developed recycled-modified asphalt could satisfy all the quality
standards of asphalt concrete mixture.
Abstract: This study aims at developing a novel cold asphalt
concrete binder course mixture by using Ordinary Portland Cement
(OPC) as a replacement for conventional mineral filler (0%-100%)
with new by-product material (LJMU-A2) used as a supplementary
cementitious material. With this purpose, cold asphalt concrete binder
course mixtures with cationic emulsions were studied by means of
stiffness modulus whereas water sensitivity was assessed by
measuring the stiffness modulus ratio before and after sample
conditioning.
The results indicate that a substantial enhancement in the stiffness
modulus and a considerable improvement of water sensitivity
resistance is achieved by adding LJMU-A2 to the cold asphalt
mixtures as a supplementary cementitious material. Moreover, the
addition of LJMU-A2 to those mixtures leads to a stiffness modulus
after 2-day curing compared to that obtained with Portland cement,
which occurs after 7-day curing.