Abstract: This paper presents an approach for the determination of the optimal cutting parameters (spindle speed, feed rate, depth of cut and engagement) leading to minimum surface roughness in face milling of high silicon stainless steel by coupling neural network (NN) and Electromagnetism-like Algorithm (EM). In this regard, the advantages of statistical experimental design technique, experimental measurements, artificial neural network, and Electromagnetism-like optimization method are exploited in an integrated manner. To this end, numerous experiments on this stainless steel were conducted to obtain surface roughness values. A predictive model for surface roughness is created by using a back propogation neural network, then the optimization problem was solved by using EM optimization. Additional experiments were performed to validate optimum surface roughness value predicted by EM algorithm. It is clearly seen that a good agreement is observed between the predicted values by EM coupled with feed forward neural network and experimental measurements. The obtained results show that the EM algorithm coupled with back propogation neural network is an efficient and accurate method in approaching the global minimum of surface roughness in face milling.
Abstract: Integration of process planning and scheduling
functions is necessary to achieve superior overall system
performance. This paper proposes a methodology for integration of
process planning and scheduling for prismatic component that can be
implemented in a company with existing departments. The developed
model considers technological constraints whereas available time for
machining in shop floor is the limiting factor to produce multiple
process plan (MPP). It takes advantage of MPP while guarantied the
fulfillment of the due dates via using overtime. This study has been
proposed to determinate machining parameters, tools, machine and
amount of over time within the minimum cost objective while
overtime is considered for this. At last the illustration shows that the
system performance is improved by as measured by cost and
compatible with due date.