Integrating Process Planning and Scheduling for Prismatic Parts Regard to Due Date

Integration of process planning and scheduling functions is necessary to achieve superior overall system performance. This paper proposes a methodology for integration of process planning and scheduling for prismatic component that can be implemented in a company with existing departments. The developed model considers technological constraints whereas available time for machining in shop floor is the limiting factor to produce multiple process plan (MPP). It takes advantage of MPP while guarantied the fulfillment of the due dates via using overtime. This study has been proposed to determinate machining parameters, tools, machine and amount of over time within the minimum cost objective while overtime is considered for this. At last the illustration shows that the system performance is improved by as measured by cost and compatible with due date.




References:
[1] T.W. Liao, E.R. Coates, F. Aghazadeh, L. Mann, and N. Guha,
"Modification of CAPP systems for CAPP/scheduling integration", J
Comp. Ind. Eng. Vol. 25 No.1, pp. 203-206, 1993.
[2] N. Morad and A. Zalzala (1999) "Genetic algorithms in integrated
process planning and scheduling". J Intell Manuf vol. 10, pp.169-179.
[3] J. Detand and K. U. Leuben, "The generation of non-linear process
plans", The 22nd CIRP International Seminar on Manufacturing System,
Section 2, 1990.
[4] G. Chryssolouris and S. Chan, "An integrated approach to process
planning and scheduling", Ann. CIRP 34 (1) ,1985.
[5] W.H.M. Zijm, "The integration of process planning and shop floor
scheduling in small batch part manufacturing", Ann. CIRP 44 (1) (1995).
[6] M. Kumar and S. Rajotia, "Integration of scheduling with computer
aided process planning. J Mater Process Technol vol. 138, pp. 297-300,
2003.
[7] N.E. Larsen and L. Alting, "Dynamic planning enriches concurrent
process and production planning". Int J of Production Research, vol. 30,
No. 8. pp. 1861-1876, 1992.
[8] H.K. Tonshoff, U. Beckendorff and N. Andres. "FLEXPLAN: A
concept for intelligent process planning and scheduling". CIRP
International Workshop, Hannover, Germany, September, pp. 21-22,
1989.
[9] G. Chryssolouris, K. Dick, and M. Lee, "Short interval scheduling for
discrete parts manufacturing". Int J Comput Integr Manuf. vol. 4, pp.
157-168, 1991.
[10] A. Jain, P.K. Jain and I.P. Singh "An integrated scheme for process
planning and scheduling in FMS" Int J Adv Manuf Technol vol. 30, pp.
1111-1118, 2006.
[11] W. Tan, and B. Khoshnevis, "Integration of process planning and
scheduling- a review". J. of Intellt Manu vol. 11, pp. 51-63, 2000.
[12] B. Khoshnevis, and Q. Chen, "Integration of process planning and
scheduling functions". Journal of Intelligent Manufacturing, vol. 1, pp.
165-176, 1990.
[13] H.C. Zhang, "IPPMÔÇöa prototype to integrate process planning and job
shop scheduling functions". Annals of the CIRP, vol. 42(1), pp. 513-
518, 1993.
[14] S.H. Huang, H.C. Zhang and M.L. Smith, "A progressive approach for
the integration of process planning and scheduling. IIE Transactions,
vol. 27, pp. 456-464, 1995.
[15] E. Henriques, "Towards the integration of process and production
planning: an optimization model for cutting parameters". Int J Adv
Manuf Technol vol. 28, pp. 117-128, 2006.
[16] G. Halvei and R.D. Weil., "Principles of process planning". Chapman &
Hall, pp. 170-171, 1995.