The Aspect of the Human Bias in Decision Making within Quality Management Systems & LEAN Theory

This paper provides a literature review to document the state of the art with respect to handling “human bias” in decision making within the established quality management systems (QMS) and LEAN theory, in the context of shipbuilding. Previous research shows that in shipbuilding there is a huge deviation from the planned man-hours under the project management to the actual man-hours used because of errors in planning and reworks caused by human bias in the information flows, among others. This reduces the efficiency, and increases operational costs. Thus, the research question is how QMS and LEAN handle biases. The findings show the gap in studying the integration of methods to handle human bias in decision making into QMS and lean, not only within shipbuilding, but in general. Theoretical and practical implications are discussed for researchers and practitioners in the areas of decision making, QMS and LEAN, and future research is suggested.

A Search Algorithm for Solving the Economic Lot Scheduling Problem with Reworks under the Basic Period Approach

In this study, we are interested in the economic lot scheduling problem (ELSP) that considers manufacturing of the serviceable products and remanufacturing of the reworked products. In this paper, we formulate a mathematical model for the ELSP with reworks using the basic period approach. In order to solve this problem, we propose a search algorithm to find the cyclic multiplier ki of each product that can be cyclically produced for every ki basic periods. This research also uses two heuristics to search for the optimal production sequence of all lots and the optimal time length of the basic period so as to minimize the average total cost. This research uses a numerical example to show the effectiveness of our approach.