Abstract: In the paper we discuss the influence of the route
flexibility degree, the open rate of operations and the production type
coefficient on makespan. The flexible job-open shop scheduling
problem FJOSP (an extension of the classical job shop scheduling) is
analyzed. For the analysis of the production process we used a
hybrid heuristic of the GRASP (greedy randomized adaptive search
procedure) with simulated annealing algorithm. Experiments with
different levels of factors have been considered and compared. The
GRASP+SA algorithm has been tested and illustrated with results for
the serial route and the parallel one.
Abstract: The paper addresses a problem of optimal staffing in
open shop environment. The problem is to determine the optimal
number of operators serving a given number of machines to fulfill the
number of independent operations while minimizing staff idle. Using
a Gantt chart presentation of the problem it is modeled as twodimensional
cutting stock problem. A mixed-integer programming
model is used to get minimal job processing time (makespan) for
fixed number of machines' operators. An algorithm for optimal openshop
staffing is developed based on iterative solving of the
formulated optimization task. The execution of the developed
algorithm provides optimal number of machines' operators in the
sense of minimum staff idle and optimal makespan for that number of
operators. The proposed algorithm is tested numerically for a real life
staffing problem. The testing results show the practical applicability
for similar open shop staffing problems.