Abstract: An innovative concept called “Flexy-Energy” is developing at 2iE. This concept aims to produce electricity at lower cost by smartly mix different available energy sources in accordance to the load profile of the region. With a higher solar irradiation and due to the fact that Diesel generator are massively used in sub-Saharan rural areas, PV/Diesel hybrid systems could be a good application of this concept and a good solution to electrify this region, provided they are reliable, cost effective and economically attractive to investors. Presentation of the developed approach is the aims of this paper. The PV/Diesel hybrid system designed consists to produce electricity and/or heat from a coupling between Diesel Diesel generators and PV panels without batteries storage, while ensuring the substitution of gasoil by bio-fuels available in the area where the system will be installed. The optimal design of this system is based on his technical performances; the Life Cycle Cost (LCC) and Levelized Cost of Energy are developed and use as economic criteria. The Net Present Value (NPV), the internal rate of return (IRR) and the discounted payback (DPB) are also evaluated according to dual electricity pricing (in sunny and unsunny hours). The PV/Diesel hybrid system obtained is compared to the standalone Diesel Diesel generators. The approach carried out in this paper has been applied to Siby village in Mali (Latitude 12 ° 23'N 8 ° 20'W) with 295 kWh as daily demand.This approach provides optimal physical characteristics (size of the components, number of component) and dynamical characteristics in real time (number of Diesel generator on, their load rate, fuel specific consumptions, and PV penetration rate) of the system. The system obtained is slightly cost effective; but could be improved with optimized tariffing strategies.
Abstract: Life Cycle Cost (LCC) is one of the goals and key
pillars of the construction management science because it comprises
many of the functions and processes necessary, which assist
organisations and agencies to achieve their goals. It has therefore
become important to design and control assets during their whole life
cycle, from the design and planning phase through to disposal phase.
LCCA is aimed to improve the decision making system in the
ownership of assets by taking into account all the cost elements
including to the asset throughout its life.
Current application of LCC approach is impractical during
misunderstanding of the advantages of LCC. This main objective of
this research is to show a different relationship between capital cost
and long-term running costs. One hundred and thirty eight actual
building projects in United Kingdom (UK) were used in order to
achieve and measure the above-mentioned objective of the study. The
result shown that LCC is one of the most significant tools should be
considered on the decision making process.
Abstract: Design for cost (DFC) is a method that reduces life
cycle cost (LCC) from the angle of designers. Multiple domain
features mapping (MDFM) methodology was given in DFC. Using
MDFM, we can use design features to estimate the LCC. From the
angle of DFC, the design features of family cars were obtained, such
as all dimensions, engine power and emission volume. At the
conceptual design stage, cars- LCC were estimated using back
propagation (BP) artificial neural networks (ANN) method and
case-based reasoning (CBR). Hamming space was used to measure the
similarity among cases in CBR method. Levenberg-Marquardt (LM)
algorithm and genetic algorithm (GA) were used in ANN. The
differences of LCC estimation model between CBR and artificial
neural networks (ANN) were provided. ANN and CBR separately
each method has its shortcomings. By combining ANN and CBR
improved results accuracy was obtained. Firstly, using ANN selected
some design features that affect LCC. Then using LCC estimation
results of ANN could raise the accuracy of LCC estimation in CBR
method. Thirdly, using ANN estimate LCC errors and correct errors in
CBR-s estimation results if the accuracy is not enough accurate.
Finally, economically family cars and sport utility vehicle (SUV) was
given as LCC estimation cases using this hybrid approach combining
ANN and CBR.