Investigation of Split TCSC on Kanpur-Ballabhgarh Transmission System

This paper investigates the performance of the single TCSC and proposed split TCSC on transmission system where India’s first TCSC project is installed in Kanpur - Ballabhgarh (KB) line to ensure the fine tuning of line reactance by proposed split TCSC in place of existing KB TCSC. A three phase KB transmission system is developed in MATLAB/Simulink (SimPowerSystems) for without any compensation, with fixed capacitor (FC), with FC + existing KB TCSC and with FC + proposed split TCSC The KB system is analyzed for a step variation of load and performance of the system is investigated with a closed loop reactance control method.