Abstract: When faced with stochastic networks with an uncertain
duration for their activities, the securing of network completion time
becomes problematical, not only because of the non-identical pdf of
duration for each node, but also because of the interdependence of
network paths. As evidenced by Adlakha & Kulkarni [1], many
methods and algorithms have been put forward in attempt to resolve
this issue, but most have encountered this same large-size network
problem. Therefore, in this research, we focus on network reduction
through a Series/Parallel combined mechanism. Our suggested
algorithm, named the Activity Network Reduction Algorithm
(ANRA), can efficiently transfer a large-size network into an S/P
Irreducible Network (SPIN). SPIN can enhance stochastic network
analysis, as well as serve as the judgment of symmetry for the Graph
Theory.
Abstract: The new idea of analyze of power system failure with
use of artificial neural network is proposed. An analysis of the
possibility of simulating phenomena accompanying system faults and
restitution is described. It was indicated that the universal model for
the simulation of phenomena in whole analyzed range does not exist.
The main classic method of search of optimal structure and
parameter identification are described shortly. The example with
results of calculation is shown.