Abstract: Construction and reconstruction of settlements and
individual municipalities, environmental management and the
creation, deployment of the forces of production and building
transport and technical equipment requires a large expenditure of
material and human resources. That is why the economic aspects of
the majority decision in these planes built in the foreground and are
often decisive. Thereby but more serious is that the economic aspects
of the settlement, the creation and function remain in their whole,
unprocessed, and cannot speak of a set of individual techniques and
methods traditional indicators and experiments with new approaches.
This is true both at the level of the national economy, and in their
own urban designs. Still a few remain identified specific economic
shaping patterns of settlement and the less it is possible to speak of
their control. Also practical assessing economics of specific solutions
are often used non-apt indicators in addition to economics usually
identifies with the lowest acquisition cost or high-intensity land use
with little regard for functional efficiency and little studied much
higher operating and maintenance costs".
Abstract: The building sector is responsible, in many
industrialized countries, for about 40% of the total energy
requirements, so it seems necessary to devote some efforts in this
area in order to achieve a significant reduction of energy
consumption and of greenhouse gases emissions.
The paper presents a study aiming at providing a design
methodology able to identify the best configuration of the system
building/plant, from a technical, economic and environmentally point
of view.
Normally, the classical approach involves a building's energy
loads analysis under steady state conditions, and subsequent selection
of measures aimed at improving the energy performance, based on
previous experience made by architects and engineers in the design
team. Instead, the proposed approach uses a sequence of two wellknown
scientifically validated calculation methods (TRNSYS and
RETScreen), that allow quite a detailed feasibility analysis.
To assess the validity of the calculation model, an existing,
historical building in Central Italy, that will be the object of
restoration and preservative redevelopment, was selected as a casestudy.
The building is made of a basement and three floors, with a
total floor area of about 3,000 square meters.
The first step has been the determination of the heating and
cooling energy loads of the building in a dynamic regime by means,
which allows simulating the real energy needs of the building in
function of its use. Traditional methodologies, based as they are on
steady-state conditions, cannot faithfully reproduce the effects of
varying climatic conditions and of inertial properties of the structure.
With this model is possible to obtain quite accurate and reliable
results that allow identifying effective combinations building-HVAC
system.
The second step has consisted of using output data obtained as
input to the calculation model, which enables to compare different
system configurations from the energy, environmental and financial
point of view, with an analysis of investment, and operation and
maintenance costs, so allowing determining the economic benefit of
possible interventions.
The classical methodology often leads to the choice of
conventional plant systems, while our calculation model provides a
financial-economic assessment for innovative energy systems and
low environmental impact.
Computational analysis can help in the design phase, particularly
in the case of complex structures with centralized plant systems, by
comparing the data returned by the calculation model for different
design options.
Abstract: Life Cycle Cost (LCC) is one of the goals and key
pillars of the construction management science because it comprises
many of the functions and processes necessary, which assist
organisations and agencies to achieve their goals. It has therefore
become important to design and control assets during their whole life
cycle, from the design and planning phase through to disposal phase.
LCCA is aimed to improve the decision making system in the
ownership of assets by taking into account all the cost elements
including to the asset throughout its life.
Current application of LCC approach is impractical during
misunderstanding of the advantages of LCC. This main objective of
this research is to show a different relationship between capital cost
and long-term running costs. One hundred and thirty eight actual
building projects in United Kingdom (UK) were used in order to
achieve and measure the above-mentioned objective of the study. The
result shown that LCC is one of the most significant tools should be
considered on the decision making process.
Abstract: In economical evaluation literature, although the combination of some variables such as repair and maintenance costs and accumulated use hours has been widely considered in determining of optimum life for tractor, no investigation has indicated the influence of failure rate on repair and maintenance costs. In this study, the owners of three hundred tractors, which include Massey Ferguson, John Deere and Universal, were interviewed, from five regions of Khouzestan Province. A regression model was used to predict the tractors annual repair and maintenance costs based on failure rate. Results showed that the maximum percentage of annual repair and maintenance costs occurred in engine parts for MF285, JD3140 and U650 tractors while these costs for tire, ring, ball bearing and operator seat were higher compared to other MF399 tractor systems. According to the results of the regression, the failure rate increase would lead to annual repair and maintenance costs increase for all tractors. But, of all the tractors, repair and maintenance costs of JD3140 tractors extremely affected by the failure rate increase.
Abstract: The simulated mass and spring method evaluation for subway or railways construction and installation systems have a wide application in rail industries. This kind of design should be optimizing all related parameters to reduce the amount of vibration in cities, homelands, historical zones and other critical locations. Finite element method could help us a lot to analysis such applications with an excellent accuracy but always developing some simple, fast and user friendly evaluation method required in subway industrial applications. In addition, process parameter optimization extremely required in railway industries to achieve some optimal design of railways with maximum safety, reliability and performance. Furthermore, it is important to reduce vibrations and further related maintenance costs as well as possible. In this paper a simple but useful simulated mass and spring evaluation system developed for Esfahan subway construction. Besides, some of related recent patent and innovations in rail world industries like Suspension mass tuned vibration reducer, short sleeper vibration attenuation fastener and Airtight track vibration-noise reducing fastener discussed in details.
Abstract: This study investigates the relationship between the reliability of critical medical equipment (CME) and the effectiveness of CME maintenance management strategies in relation to patient outcomes in 84 public hospitals of a top 20 OECD country. The work has examined the effectiveness of CME maintenance management strategies used by the public hospital system of a large state run health organization. The conceptual framework was designed to examine the significance of the relationship between six variables: (1) types of maintenance management strategies, (2) maintenance services, (3) maintenance practice, (4) medical equipment reliability, (5) maintenance costs and (6) patient outcomes. The results provide interesting insights into the effectiveness of the maintenance strategies used. For example, there appears to be about a 1 in 10 000 probability of failure of anesthesia equipment, but these seem to be confined to specific maintenance situations. There are also some findings in relation to outsourcing of maintenance. For each of the variables listed, results are reported in relation to the various types of maintenance strategies and services. Decision-makers may use these results to evaluate more effective maintenance strategies for their CME and generate more effective patient outcomes.
Abstract: Energy generated by the force of water in hydropower
can provide a more sustainable, non-polluting alternative to fossil
fuels, along with other renewable sources of energy, such as wind,
solar and tidal power, bio energy and geothermal energy. Small scale
hydroelectricity in Iran is well suited for “off-grid" rural electricity
applications, while other renewable energy sources, such as wind,
solar and biomass, can be beneficially used as fuel for pumping
groundwater for drinking and small scale irrigation in remote rural
areas or small villages. Small Hydro Power plants in Iran have very
low operating and maintenance costs because they consume no fossil
or nuclear fuel and do not involve high temperature processes. The
equipment is relatively simple to operate and maintain. Hydropower
equipment can adjust rapidly to load changes. The extended
equipment life provides significant economic advantages. Some
hydroelectric plants installed 100 years ago still operate reliably. The
Polkolo river is located on Karun basin at southwest of Iran. Situation
and conditions of Polkolo river are evaluated for construction of
small hydropower in this article. The topographical conditions and
the existence of permanent water from springs provide the suitability
to install hydroelectric power plants on the river Polkolo. The
cascade plant consists of 9 power plants connected with each other
and is having the total head as 1100m and discharge about 2.5cubic
meter per second. The annual production of energy is 105.5 million
kwh.
Abstract: In the present article, a new method has been developed to enhance the application of equipment monitoring, which in turn results in improving condition-based maintenance economic impact in an automobile parts manufacturing factory. This study also describes how an effective software with a simple database can be utilized to achieve cost-effective improvements in maintenance performance. The most important results of this project are indicated here: 1. 63% reduction in direct and indirect maintenance costs. 2. Creating a proper database to analyse failures. 3. Creating a method to control system performance and develop it to similar systems. 4. Designing a software to analyse database and consequently create technical knowledge to face unusual condition of the system. Moreover, the results of this study have shown that the concept and philosophy of maintenance has not been understood in most Iranian industries. Thus, more investment is strongly required to improve maintenance conditions.
Abstract: The problem of wastewater treatment in Egypt is a two-fold problem; the first part concerning the existing rural areas, the second one dealing with new industrial/domestic areas. In Egypt several agricultural projects have been initiated by the government and the private sector as well, in order to change its infrastructure. As a reliable energy source, photovoltaic pumping systems have contributed to supply water for local rural communities worldwide; they can also be implemented to solve the problem “wastewater environment pollution". The solution of this problem can be categorised as recycle process. In addition, because of regional conditions past technologies are being reexamined to select a smallscale treatment system requiring low construction and maintenance costs. This paper gives the design guidelines of a Photovoltaic Small- Scale Wastewater Treatment Plant (PVSSWTP) based on technologies that can be transferred.
Abstract: Photovoltaic (PV) systems provides a viable means of
power generation for applications like powering residential
appliances, electrification of villages in rural areas, refrigeration and
water pumping. Photovoltaic-power generation is reliable. The
operation and maintenance costs are very low. Since Myanmar is a
land of plentiful sunshine, especially in central and southern regions
of the country, the solar energy could hopefully become the final
solution to its energy supply problem in rural area.
Abstract: This paper provides a replacement policy for warranty products with different failure rate from the consumer-s viewpoint. Assume that the product is replaced once within a finite planning horizon, and the failure rate of the second product is lower than the failure rate of the first product. Within warranty period (WP), the failed product is corrected by minimal repair without any cost to the consumers. After WP, the failed product is repaired with a fixed repair cost to the consumers. However, each failure incurs a fixed downtime cost to the consumers over a finite planning horizon. In this paper, we derive the model of the expected total disbursement cost within a finite planning horizon and some properties of the optimal replacement policy under some reasonable conditions are obtained. Finally, numerical examples are given to illustrate the features of the optimal replacement policy under various maintenance costs.
Abstract: Maintenance costs incurred on building differs. The
difference can be as results of the types, functions, age, building
health index, size, form height, location and complexity of the
building. These are contributing to the difficulty in maintenance
development of deterministic maintenance cost model. This paper is
concerns with reporting the preliminary findings on the creation of
building maintenance cost distributions for universities in Malaysia.
This study is triggered by the need to provide guides on maintenance
costs distributions for decision making. For this purpose, a survey
questionnaire was conducted to investigate the distribution of
maintenance costs in the universities. Altogether, responses were
received from twenty universities comprising both private and
publicly owned. The research found that engineering services,
roofing and finishes were the elements contributing the larger
segment of the maintenance costs. Furthermore, the study indicates
the significance of maintenance cost distribution as decision making
tool towards maintenance management.
Abstract: Recently, the issue of machine condition monitoring
and fault diagnosis as a part of maintenance system became global
due to the potential advantages to be gained from reduced
maintenance costs, improved productivity and increased machine
availability. The aim of this work is to investigate the effectiveness
of a new fault diagnosis method based on power spectral density
(PSD) of vibration signals in combination with decision trees and
fuzzy inference system (FIS). To this end, a series of studies was
conducted on an external gear hydraulic pump. After a test under
normal condition, a number of different machine defect conditions
were introduced for three working levels of pump speed (1000, 1500,
and 2000 rpm), corresponding to (i) Journal-bearing with inner face
wear (BIFW), (ii) Gear with tooth face wear (GTFW), and (iii)
Journal-bearing with inner face wear plus Gear with tooth face wear
(B&GW). The features of PSD values of vibration signal were
extracted using descriptive statistical parameters. J48 algorithm is
used as a feature selection procedure to select pertinent features from
data set. The output of J48 algorithm was employed to produce the
crisp if-then rule and membership function sets. The structure of FIS
classifier was then defined based on the crisp sets. In order to
evaluate the proposed PSD-J48-FIS model, the data sets obtained
from vibration signals of the pump were used. Results showed that
the total classification accuracy for 1000, 1500, and 2000 rpm
conditions were 96.42%, 100%, and 96.42% respectively. The results
indicate that the combined PSD-J48-FIS model has the potential for
fault diagnosis of hydraulic pumps.