Abstract: Various infrastructures such as dams, flood control dams and reservoirs have been developed in the 19th century until the 20th century. These infrastructures are very effective in controlling the river flows and in preventing inundation in the urban area prone to flooding. Flooding in the urban area often brings large impact, affecting every aspect of life and also environment. Ciliwung is one of the rivers allegedly contributes to the flooding problems in Jakarta; various engineering work has been done in Ciliwung river to help controlling the flooding. One of the engineering work is to build Ciawi Dam and Sukamahi Dam. In this research, author is doing the flood calculation with Nakayasu Method, while the previous flooding in that case study is computed using Level Pool Routine. The effectiveness of these dams can be identified by using flood simulation of existing condition and compare it to the flood simulation after the dam construction. The final goal of this study is to determine the effectiveness of flood mitigation infrastructure located at upstream area in reducing the volume of flooding in Jakarta.
Abstract: Oases are complex and fragile agro-ecosystems. They
have always existed in environments characterized by an arid climate,
scarcity of rainfall, high temperatures and high evaporation. These
palms have grown up despite the severity of the physical
characteristics thanks to the water's existence and irrigation practice.
The oases are generally spread along non-perennial rivers (wadis),
shallow water table or deep artesian groundwater. However, the
sustainability of oasis system is threatened by water scarcity and
declining of water table levels particularly in arid areas. Located in
the southern east area of Morocco, Tafilalet plain encompasses one of
the largest palm groves in the kingdom. In recent years, this area has
become increasingly threatened by water shortage and has seen a
sharp deterioration under the effect of several combined
anthropogenic and climatic factors. The Bayoud disease, successive
years of drought, Hassan Addakhil dam construction etc are all
factors that have affected both water and phoenicicole heritage of the
area. The objective of this study is to understand the interaction
between qualitative and quantitative degradation of groundwater
resources, and the palm grove dynamics, while reviewing the
assumption that groundwater resources contribute in a direct way to
the conservation of this oasis agroecosystem. A historical analysis
tracing both the oasis dynamics and the groundwater evolution has
been established. Data were collected from satellite images, surveys
with different actors (farmers, Regional Office for Agricultural
Development, Basin agency...). They were complemented by a
synthesis of numerous technical reports in the area. The results
showed that within 40 years, the thickness of the groundwater table
has dropped in 50 %. Along with this, there has been a downsizing of
date palm by 50 %. Areas with higher groundwater level were the
least affected by the downsizing. So we can say that the shallow
groundwater contribute significantly and directly to the water supply
of date palm through its root system, and largely ensures the oasis
ecosystem sustainability.
Abstract: Optimizing equipment selection in heavy earthwork
operations is a critical key in the success of any construction project.
The objective of this research incentive was geared towards
developing a computer model to assist contractors and construction
managers in estimating the cost of heavy earthwork operations.
Economical operation analysis was conducted for an equipment fleet
taking into consideration the owning and operating costs involved in
earthwork operations. The model is being developed in a Microsoft
environment and is capable of being integrated with other estimating
and optimization models. In this study, CaterpillarĀ® Performance
Handbook [5] was the main resource used to obtain specifications of
selected equipment. The implementation of the model shall give
optimum selection of equipment fleet not only based on cost
effectiveness but also in terms of versatility. To validate the model, a
case study of an actual dam construction project was selected to
quantify its degree of accuracy.
Abstract: From the beginning of creation, human being has ever
fought against the ecosystem by changes has made in environment.
The most environmental changes on the nature have been done after
starting the concentrated life in the same region. Dams are one of the
most important buildings in water resources and transferring. These
buildings have been made from old times without access to
hydrological, hydraulically, hydro mechanical information. Dams
have positive and negative effects on environment. Constructing a
dam relatively causes equal ecological consequences. According to
different criteria, environmental effects of dams can lead short term
and long term damages. These effects may influence on the situation
and treatment of meteorology, biology, culture, ancient works, etc
and severely causes to change and complicate it. So considering
importance of positive effects of dam construction, it is necessary to
minimize negative environmental effects of dams to achieve a stable
development. In this article the considered effects and their solutions
in influencing on assessment of destructive environmental effects of
dams construction have been surveyed and presented.
Abstract: The main purpose of the dam is to control the surface
streams and rivers across the country. Dam construction and
formation of river and big water reservoirs and resources happen in
the glen is a big incident which would change its surrounding area
considerably. In fact, constructing a dam the glen width is close and
fishes don't migrate from upstream to downstream and ultimately it
would led to their death. To resolve this, it seems necessity to create a
passage for fishes during the construction of dam. It is provided
establishing a set of stepped pools overlooking each other as a fish
way or fish ladder a proper pathway for moving fishes. In this article
we first examine the surrounding environment and then Ghazal Ozon
River and preserving the aquatics.
Abstract: The usual method of river flow diversion involves construction of tunnels and cofferdams. Given the fact that the cost of diversion works could be as high as 10-20% of the total dam construction cost, due attention should be paid to optimum design of the diversion works. The cost of diversion works depends, on factors, such as: the tunnel dimensions and the intended tunneling support measures during and after excavation; quality and characterizes of the rock through which the tunnel should be excavated; the dimensions of the upstream (and downstream) cofferdams; and the magnitude of river flood the system is designed to divert. In this paper by use of the cost of unit prices for tunnel excavation, tunnel lining, tunnel support (rock bolt + shotcrete) and cofferdam fill the cost function was determined. The function is then minimized by the aid of PSO Algorithm (particle swarm optimization). It is found that the optimum diameter and the total diversion cost are directly related to the river flood discharge (Q). It has also shown that in addition to optimum diameter design discharge (Q), river length, tunnel length, is mainly a function of the ratios (not the absolute values) of the unit prices and does not depend on the overall price levels in the respective country. The results of optimization use in some of the case study lead us to significant changes in the cost.