Abstract: River is one of important water sources for many activities including industrial and domestic usage such as daily usage, transportation, power supply and recreational activities. However, increasing activities in a river has grown the sources of pollutant enters the water bodies, and degraded the water quality of the river. It becomes a challenge to develop an effective river management to ensure the water sources of the river are well managed and regulated. In Malaysia, several approaches for river management have been implemented such as Integrated River Basin Management (IRBM) program for coordinating the management of resources in a natural environment based on river basin to ensure their sustainability lead by Department of Drainage and Irrigation (DID), Malaysia. Nowadays, Total Maximum Daily Load (TMDL) is one of the best approaches for river management in Malaysia. TMDL implementation is regulated and implemented in the United States. A study on the development of TMDL in Malacca River has been carried out by doing water quality monitoring, the development of water quality model by using Environmental Fluid Dynamic Codes (EFDC), and TMDL implementation plan. The implementation of TMDL will help the stakeholders and regulators to control and improve the water quality of the river. It is one of the good approaches for river management in Malaysia.
Abstract: The study assessed the potential and economic viability of stand-alone wind systems for embedded generation, taking into account its benefits to small off-grid rural communities at 40 meteorological sites in Nigeria. A specific electric load profile was developed to accommodate communities consisting of 200 homes, a school and a community health centre. This load profile was incorporated within the distributed generation analysis producing energy in the MW range, while optimally meeting daily load demand for the rural communities. Twenty-four years (1987 to 2010) of wind speed data at a height of 10m utilized for the study were sourced from the Nigeria Meteorological Department, Oshodi. The HOMER® software optimizing tool was engaged for the feasibility study and design. Each site was suited to 3MW wind turbines in sets of five, thus 15MW was designed for each site. This design configuration was adopted in order to easily compare the distributed generation system amongst the sites to determine their relative economic viability in terms of life cycle cost, as well as levelised cost of producing energy. A net present value was estimated in terms of life cycle cost for 25 of the 40 meteorological sites. On the other hand, the remaining sites yielded a net present cost; meaning the installations at these locations were not economically viable when utilizing the present tariff regime for embedded generation in Nigeria.
Abstract: Waste Load Allocation (WLA) strategies usually
intend to find economic policies for water resource management.
Water quality trading (WQT) is an approach that uses discharge
permit market to reduce total environmental protection costs. This
primarily requires assigning discharge limits known as total
maximum daily loads (TMDLs). These are determined by monitoring
organizations with respect to the receiving water quality and
remediation capabilities. The purpose of this study is to compare two
approaches of TMDL assignment for WQT policy in small catchment
area of Haraz River, in north of Iran. At first, TMDLs are assigned
uniformly for the whole point sources to keep the concentrations of
BOD and dissolved oxygen (DO) at the standard level at checkpoint
(terminus point). This was simply simulated and controlled by
Qual2kw software. In the second scenario, TMDLs are assigned
using multi objective particle swarm optimization (MOPSO) method
in which the environmental violation at river basin and total treatment
costs are minimized simultaneously. In both scenarios, the equity
index and the WLA based on trading discharge permits (TDP) are
calculated. The comparative results showed that using economically
optimized TMDLs (2nd scenario) has slightly more cost savings rather
than uniform TMDL approach (1st scenario). The former annually
costs about 1 M$ while the latter is 1.15 M$. WQT can decrease
these annual costs to 0.9 and 1.1 M$, respectively. In other word,
these approaches may save 35 and 45% economically in comparison
with command and control policy. It means that using multi objective
decision support systems (DSS) may find more economical WLA,
however its outcome is not necessarily significant in comparison with
uniform TMDLs. This may be due to the similar impact factors of
dischargers in small catchments. Conversely, using uniform TMDLs
for WQT brings more equity that makes stakeholders not feel that
much envious of difference between TMDL and WQT allocation. In
addition, for this case, determination of TMDLs uniformly would be
much easier for monitoring. Consequently, uniform TMDL for TDP
market is recommended as a sustainable approach. However,
economical TMDLs can be used for larger watersheds.
Abstract: Wind energy offers a significant advantage such as no
fuel costs and no emissions from generation. However, wind energy
sources are variable and non-dispatchable. The utility grid is able to
accommodate the variability of wind in smaller proportion along with
the daily load. However, at high penetration levels, the variability can
severely impact the utility reserve requirements and the cost
associated with it. In this paper the impact of wind energy is
evaluated in detail in formulating the total utility cost. The objective
is to minimize the overall cost of generation while ensuring the
proper management of the load. Overall cost includes the curtailment
cost, reserve cost and the reliability cost, as well as any other penalty
imposed by the regulatory authority. Different levels of wind
penetrations are explored and the cost impacts are evaluated. As the
penetration level increases significantly, the reliability becomes a
critical question to be answered. Here we increase the penetration
from the wind yet keep the reliability factor within the acceptable
limit provided by NERC. This paper uses an economic dispatch (ED)
model to incorporate wind generation into the power grid. Power
system costs are analyzed at various wind penetration levels using
Linear Programming. The goal of this study is show how the
increases in wind generation will affect power system economics.
Abstract: This paper presents an Artificial Neural Network based approach for short-term load forecasting and exactly for two days ahead. Two seasons have been discussed for Iraqi power system, namely summer and winter; the hourly load demand is the most important input variables for ANN based load forecasting. The recorded daily load profile with a lead time of 1-48 hours for July and December of the year 2012 was obtained from the operation and control center that belongs to the Ministry of Iraqi electricity.
The results of the comparison show that the neural network gives a good prediction for the load forecasting and for two days ahead.
Abstract: The power system utility has started to think about the green power technology in order to have an eco-friendly environment. The green power technology utilizes renewable energy sources for reduction of GHG emissions. Odisha state (India) is very rich in potential of renewable energy sources especially in solar energy (about 300 solar days), for installation of grid connected photovoltaic system. This paper focuses on the utilization of photovoltaic systems in an Institute building of Bhubaneswar city, Odisha. Different data like solar insolation (kW/m2/day), sunshine duration has been collected from metrological stations for Bhubaneswar city. The required electrical power and cost are calculated for daily load of 1.0 kW. The HOMER (Hybrid Optimization Model of Electric Renewable) software is used to estimate system size and its performance analysis. The simulation result shows that the cost of energy (COE) is $ 0.194/kWh, the Operating cost is $63/yr and the net present cost (NPC) is $3,917. The energy produced from PV array is 1,756kWh/yr and energy purchased from grid is 410kWh/yr. The AC primary load consumption is 1314 kWh/yr and the Grid sales are 746 kWh/yr. One battery is connected in parallel with 12V DC Bus and the usable nominal capacity 2.4 kWh with 9.6 h autonomy capacity.
Abstract: Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This paper represents a method for reliability assessment of interconnected power systems based. The multi-agent system consists of four agents. The first agent was the generator agent to using as connected the generator to the grid depending on the state of the reserve margin and the load demand. The second was a load agent is that located at the load. Meanwhile, the third is so-called "the reverse margin agent" that to limit the reserve margin between 0 - 25% depend on the load and the unit size generator. In the end, calculation reliability Agent can be calculate expected energy not supplied (EENS), loss of load expectation (LOLE) and the effecting of tie line capacity to determine the risk levels Roy Billinton Test System (RBTS) can use to evaluated the reliability indices by using the developed JADE package. The results estimated of the reliability interconnection power systems presented in this paper. The overall reliability of power system can be improved. Thus, the market becomes more concentrated against demand increasing and the generation units were operating in relation to reliability indices.
Abstract: This paper proposes a particle swarm optimization (PSO) technique to solve the economic load dispatch (ELD) problems. For the ELD problem in this work, the objective function is to minimize the total fuel cost of all generator units for a given daily load pattern while the main constraints are power balance and generation output of each units. Case study in the test system of 40-generation units with 6 load patterns is presented to demonstrate the performance of PSO in solving the ELD problem. It can be seen that the optimal solution given by PSO provides the minimum total cost of generation while satisfying all the constraints and benefiting greatly from saving in power loss reduction.
Abstract: One of the most important requirements for the
operation and planning activities of an electrical utility is the
prediction of load for the next hour to several days out, known as
short term load forecasting. This paper presents the development of
an artificial neural network based short-term load forecasting model.
The model can forecast daily load profiles with a load time of one
day for next 24 hours. In this method can divide days of year with
using average temperature. Groups make according linearity rate of
curve. Ultimate forecast for each group obtain with considering
weekday and weekend. This paper investigates effects of temperature
and humidity on consuming curve. For forecasting load curve of
holidays at first forecast pick and valley and then the neural network
forecast is re-shaped with the new data. The ANN-based load models
are trained using hourly historical. Load data and daily historical
max/min temperature and humidity data. The results of testing the
system on data from Yazd utility are reported.
Abstract: In Korea, the technology of a load fo nuclear power plant has been being developed.
automatic controller which is able to control temperature and axial power distribution was developed. identification algorithm and a model predictive contact former transforms the nuclear reactor status into
numerically. And the latter uses them and ge
manipulated values such as two kinds of control ro
this automatic controller, the performance of a coperation was evaluated. As a result, the automatic generated model parameters of a nuclear react to nuclear reactor average temperature and axial power the desired targets during a daily load follow.
Abstract: This paper presents an optimization technique to economic load dispatch (ELD) problems with considering the daily load patterns and generator constraints using a particle swarm optimization (PSO). The objective is to minimize the fuel cost. The optimization problem is subject to system constraints consisting of power balance and generation output of each units. The application of a constriction factor into PSO is a useful strategy to ensure convergence of the particle swarm algorithm. The proposed method is able to determine, the output power generation for all of the power generation units, so that the total constraint cost function is minimized. The performance of the developed methodology is demonstrated by case studies in test system of fifteen-generation units. The results show that the proposed algorithm scan give the minimum total cost of generation while satisfying all the constraints and benefiting greatly from saving in power loss reduction
Abstract: The objective of this research is to study the technical
and economic performance of wind/diesel/battery (W/D/B) system
supplying a remote small gathering of six families using HOMER
software package. The electrical energy is to cater for the basic needs
for which the daily load pattern is estimated. Net Present Cost (NPC)
and Cost of Energy (COE) are used as economic criteria, while the measure of performance is % of power shortage. Technical and
economic parameters are defined to estimate the feasibility of the
system under study. Optimum system configurations are estimated for two sites. Using HOMER software, the simulation results showed that W/D/B systems are economical for the assumed community sites
as the price of generated electricity is about 0.308 $/kWh, without
taking external benefits into considerations. W/D/B systems are more
economical than W/B or diesel alone systems, as the COE is 0.86 $/kWh for W/B and 0.357 $/kWh for diesel alone.