Abstract: Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.
Abstract: Construction delay is unavoidable in developing
countries including Malaysia. It is defined as time overrun or
extension of time for completion of a project. The purpose of the
study is to determine the causes of delay in Malaysian construction
industries based on previous worldwide research. The field survey
conducted includes the experienced developers, consultants and
contractors in Malaysia. 34 causes of the construction delay have
been determined and 24 have been selected using the Rasch model
analysis. The analysis result will be used as the baseline for the next
research to find the causes of delay in the Malaysian construction
industry taking place in Malaysian higher learning institutions.