Identification of the Causes of Construction Delay in Malaysia

Construction delay is unavoidable in developing countries including Malaysia. It is defined as time overrun or extension of time for completion of a project. The purpose of the study is to determine the causes of delay in Malaysian construction industries based on previous worldwide research. The field survey conducted includes the experienced developers, consultants and contractors in Malaysia. 34 causes of the construction delay have been determined and 24 have been selected using the Rasch model analysis. The analysis result will be used as the baseline for the next research to find the causes of delay in the Malaysian construction industry taking place in Malaysian higher learning institutions.

Conceptual Overview of Housing Affordability in Selangor, Malaysia

Socioeconomic stability and development of a country, can be describe by housing affordability. It is aimed to ensure the housing provided as one of the key factors that is affordable by every income earner group whether low-income, middle income and high income group. This research carried out is to find out affordability of home ownership level for first medium cost landed-house by the middle-income group in Selangor, Malaysia. It is also hope that it could be seen as able to contribute to the knowledge and understanding on housing affordability level for the middleincome group and variables that influenced the medium income group-s ability to own first medium-cost houses.