Abstract: The steel-concrete hybrid structure has been extensively employed in high-rise buildings and super high-rise buildings. The light gauge steel-concrete hybrid structure, including light gauge steel structure and concrete hybrid structure, is a type of steel-concrete hybrid structure, which possesses some advantages of light gauge steel structure and concrete hybrid structure. The seismic behavior and loss assessment of three high-rise buildings with three different concrete hybrid structures were investigated through finite element software. The three concrete hybrid structures are reinforced concrete column-steel beam (RC-S) hybrid structure, concrete-filled steel tube column-steel beam (CFST-S) hybrid structure, and tubed concrete column-steel beam (TC-S) hybrid structure. The nonlinear time-history analysis of three high-rise buildings under 80 earthquakes was carried out. After simulation, it indicated that the seismic performances of three high-rise buildings were superior. Under extremely rare earthquakes, the maximum inter-story drifts of three high-rise buildings are significantly lower than 1/50. The inter-story drift and floor acceleration of high-rise building with CFST-S hybrid structure were bigger than those of high-rise buildings with RC-S hybrid structure, and smaller than those of high-rise building with TC-S hybrid structure. Then, based on the time-history analysis results, the post-earthquake repair cost ratio and repair time of three high-rise buildings were predicted through an economic performance analysis method proposed in FEMA-P58 report. Under frequent earthquakes, basic earthquakes and rare earthquakes, the repair cost ratio and repair time of three high-rise buildings were less than 5% and 15 days, respectively. Under extremely rare earthquakes, the repair cost ratio and repair time of high-rise buildings with TC-S hybrid structure were the most among three high rise buildings. Due to the advantages of CFST-S hybrid structure, it could be extensively employed in high-rise buildings subjected to earthquake excitations.
Abstract: Columns have traditionally been constructed of
reinforced concrete or structural steel. Much attention was allocated
to estimate the axial capacity of the traditional column sections to the
detriment of other forms of construction. Other forms of column
construction such as Concrete Filled Double Skin Tubes received
little research attention, and almost no attention when subjected to
eccentric loading. This paper investigates the axial capacity of
columns when subjected to eccentric loading. The experimental axial
capacities are compared to other established theoretical formulae on
concentric loading to determine a possible relationship. The study
found a good correlation between the reduction in axial capacity for
different column lengths and hollow section ratios.
Abstract: Concrete-filled-steel-tube (CFST) columns are becoming increasingly popular owing to the superior behavior contributed by the composite action. However, this composite action cannot be fully developed because of different dilation properties between steel tube and concrete. During initial compression, there will be de-bonding between the constitutive materials. As a result, the strength, initial stiffness and ductility of CFST columns reduce significantly. To resolve this problem, external confinement in the form of spirals is proposed to improve the interface bonding. In this paper, a total of 14CFST columns with high-strength as well as ultra-high-strength concrete in-filled were fabricated and tested under uni-axial compression. From the experimental results, it can be concluded that the proposed spirals can improve the strength, initial stiffness, ductility and the interface bonding condition of CFST columns by restraining the lateral expansion of steel tube and core concrete. Moreover, the failure modes of confined core concrete change due to the strong confinement provided by spirals.
Abstract: Intermittent aeration process can be easily applied on
the existing activated sludge system and is highly reliable against the loading changes. It can be operated in a relatively simple way as well.
Since the moving-bed biofilm reactor method processes pollutants by attaching and securing the microorganisms on the media, the process
efficiency can be higher compared to the suspended growth biological
treatment process, and can reduce the return of sludge. In this study,
the existing intermittent aeration process with alternating flow being
applied on the oxidation ditch is applied on the continuous flow stirred tank reactor with advantages from both processes, and we would like
to develop the process to significantly reduce the return of sludge in the clarifier and to secure the reliable quality of treated water by
adding the moving media. Corresponding process has the appropriate
form as an infrastructure based on u- environment in future u- City and
is expected to accelerate the implementation of u-Eco city in conjunction with city based services. The system being conducted in a
laboratory scale has been operated in HRT 8hours except for the final
clarifier and showed the removal efficiency of 97.7 %, 73.1 % and 9.4
% in organic matters, TN and TP, respectively with operating range of
4hour cycle on system SRT 10days. After adding the media, the removal efficiency of phosphorus showed a similar level compared to
that before the addition, but the removal efficiency of nitrogen was
improved by 7~10 %. In addition, the solids which were maintained in
MLSS 1200~1400 at 25 % of media packing were attached all onto the
media, which produced no sludge entering the clarifier. Therefore, the
return of sludge is not needed any longer.