Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Effect of Inlet Valve Variable Timing in the Spark Ignition Engine on Achieving Greener Transport

The current emission legislations and the large concern about the environment produced very numerous constraints on both governments and car manufacturers. Also the cost of energy increase means a reduction in fuel consumption must be met, without largely affecting the current engine production and performance. It is the intension to contribute towards the development and pursuing, among others on variable valve timing (VVT), for improving the engine performance. The investigation of the effect of (IVO) and (IVC) to optimize engine torque and volumetric efficiency for different engine speeds was considered. Power, BMEP and BSFC were calculated and presented to show the effect of varying inlet valve timing on them for all cases. A special program used to carry out the calculations. The analysis of the results shows that the reduction of 10% of (IVO) angle gave an improvement of around 1.3% in torque, BSFC, and volumetric efficiency, while a 10% decrease in (IVC) caused a 0.1% reduction in power, torque, and volumetric efficiency.  

Knowledge Management: The Need for a Total Knowledge Transfer Model to Diffuse Innovation of the Public Health Workforce

The purpose of this article is to propose a model designed to achieve Total Knowledge Transfer in the public health sector. The Total Knowledge Transfer Model integrated four essential organizational factors which have been under examined in totality in the literature. The research design was inductive in nature and used a case study for accomplishing the research objectives. The researcher investigated the factors that created a base to design a framework for total knowledge transfer in the public health sector. The results of this study are drawn from a fairly large sample in only two hospitals. A further research can be conducted to cover more responses from a wider health sector. The Total Knowledge Transfer Model is essential to improve the transfer and application of total common health knowledge.