Abstract: We consider a single-echelon, single-item inventory
system where both demand and lead-time are stochastic. Continuous
review policy is used to control the inventory system. The objective
is to calculate the reorder point level under stochastic parameters. A
case study is presented in Neonatal Intensive Care Unit.