Abstract: In this paper, the problem of finding the optimal
topological configuration of a deregulated distribution network is
considered. The new features of this paper are proposing a multiobjective
function and its application on deregulated distribution
networks for finding the optimal configuration. The multi-objective
function will be defined for minimizing total Energy Supply Costs
(ESC) and energy losses subject to load flow constraints. The
optimal configuration will be obtained by using Binary Genetic
Algorithm (BGA).The proposed method has been tested to analyze a
sample and a practical distribution networks.
Abstract: In this paper, an improved technique for contingency
ranking using artificial neural network (ANN) is presented. The
proposed approach is based on multi-layer perceptrons trained by
backpropagation to contingency analysis. Severity indices in dynamic
stability assessment are presented. These indices are based on the
concept of coherency and three dot products of the system variables.
It is well known that some indices work better than others for a
particular power system. This paper along with test results using
several different systems, demonstrates that combination of indices
with ANN provides better ranking than a single index. The presented
results are obtained through the use of power system simulation
(PSS/E) and MATLAB 6.5 software.
Abstract: This paper presents a mathematical model and a
methodology to analyze the losses in transmission expansion
planning (TEP) under uncertainty in demand. The methodology is
based on discrete particle swarm optimization (DPSO). DPSO is a
useful and powerful stochastic evolutionary algorithm to solve the
large-scale, discrete and nonlinear optimization problems like TEP.
The effectiveness of the proposed idea is tested on an actual
transmission network of the Azerbaijan regional electric company,
Iran. The simulation results show that considering the losses even for
transmission expansion planning of a network with low load growth
is caused that operational costs decreases considerably and the
network satisfies the requirement of delivering electric power more
reliable to load centers.