Abstract: This paper describes an efficient and practical method
for economic dispatch problem in one and two area electrical power
systems with considering the constraint of the tie transmission line
capacity constraint. Direct search method (DSM) is used with some
equality and inequality constraints of the production units with any
kind of fuel cost function. By this method, it is possible to use several
inequality constraints without having difficulty for complex cost
functions or in the case of unavailability of the cost function
derivative. To minimize the number of total iterations in searching,
process multi-level convergence is incorporated in the DSM.
Enhanced direct search method (EDSM) for two area power system
will be investigated. The initial calculation step size that causes less
iterations and then less calculation time is presented. Effect of the
transmission tie line capacity, between areas, on economic dispatch
problem and on total generation cost will be studied; line
compensation and active power with reactive power dispatch are
proposed to overcome the high generation costs for this multi-area
system.
Abstract: This research deals with investigations on the “Active
Generator" under rotor speed variations and output frequency
control. It runs at turbine speed and it is connected to a three phase
electrical power grid which has its own frequency different from
turbine frequency. In this regard the set composed of a four phase
synchronous generator and a natural commutated matrix converter
(NCMC) made with thyristors, is called active generator. It replaces a
classical mechanical gearbox which introduces many drawbacks. The
main idea in this article is the presentation of frequency control at
grid side when turbine runs at variable speed. Frequency control has
been done by linear and step variations of the turbine speed. Relation
between turbine speed (frequency) and main grid zero sequence
voltage frequency is presented.