Abstract: A reconfigurable manufacturing system (RMS) is an
advanced system designed at the outset for rapid changes in its hardware
and software components in order to quickly adjust its production
capacity and functionally. Among various operational decisions, this
study considers the scheduling problem that determines the input
sequence and schedule at the same time for a given set of parts. In
particular, we consider the practical constraints that the numbers of
pallets/fixtures are limited and hence a part can be released into the
system only when the fixture required for the part is available. To
solve the integrated input sequencing and scheduling problems, we
suggest a priority rule based approach in which the two sub-problems
are solved using a combination of priority rules. To show the effectiveness
of various rule combinations, a simulation experiment was
done on the data for a real RMS, and the test results are reported.
Abstract: This study considers the problem of determining
operation and maintenance schedules for a containership equipped
with components during its sailing according to a pre-determined
navigation schedule. The operation schedule, which specifies work
time of each component, determines the due-date of each maintenance
activity, and the maintenance schedule specifies the actual start
time of each maintenance activity. The main constraints are component
requirements, workforce availability, working time limitation,
and inter-maintenance time. To represent the problem mathematically,
a mixed integer programming model is developed. Then,
due to the problem complexity, we suggest a heuristic for the objective
of minimizing the sum of earliness and tardiness between the
due-date and the starting time of each maintenance activity. Computational
experiments were done on various test instances and the
results are reported.