Abstract: Total Quality Management (TQM) is a managerial
approach that improves the competitiveness of the industry,
meanwhile Information technology (IT) was introduced with TQM
for handling the technical issues which is supported by quality
experts for fulfilling the customers’ requirement. Present paper aims
to utilise AHP (Analytic Hierarchy Process) methodology to
priorities and rank the hierarchy levels of TQM enablers and IT
resource together for its successful implementation in the Information
and Communication Technology (ICT) industry. A total of 17 TQM
enablers (nine) and IT resources (eight) were identified and
partitioned into 3 categories and were prioritised by AHP approach.
The finding indicates that the 17 sub-criteria can be grouped into
three main categories namely organizing, tools and techniques, and
culture and people. Further, out of 17 sub-criteria, three sub-criteria:
top management commitment and support, total employee
involvement, and continuous improvement got highest priority
whereas three sub-criteria such as structural equation modelling,
culture change, and customer satisfaction got lowest priority. The
result suggests a hierarchy model for ICT industry to prioritise the
enablers and resources as well as to improve the TQM and IT
performance in the ICT industry. This paper has some managerial
implication which suggests the managers of ICT industry to
implement TQM and IT together in their organizations to get
maximum benefits and how to utilize available resources. At the end,
conclusions, limitation, future scope of the study are presented.
Abstract: The Scheduling and mapping of tasks on a set of
processors is considered as a critical problem in parallel and
distributed computing system. This paper deals with the problem of
dynamic scheduling on a special type of multiprocessor architecture
known as Linear Crossed Cube (LCQ) network. This proposed
multiprocessor is a hybrid network which combines the features of
both linear types of architectures as well as cube based architectures.
Two standard dynamic scheduling schemes namely Minimum
Distance Scheduling (MDS) and Two Round Scheduling (TRS)
schemes are implemented on the LCQ network. Parallel tasks are
mapped and the imbalance of load is evaluated on different set of
processors in LCQ network. The simulations results are evaluated
and effort is made by means of through analysis of the results to
obtain the best solution for the given network in term of load
imbalance left and execution time. The other performance matrices
like speedup and efficiency are also evaluated with the given
dynamic algorithms.