Abstract: Pressure waves and Water Hammer occur in a
pumping system when valves are closed or opened suddenly or in
the case of sudden failure of pumps. Determination of maximum
water hammer is considered one of the most important technical
and economical items of which engineers and designers of
pumping stations and conveyance pipelines should take care.
Hammer Software is a recent application used to simulate water
hammer. The present study focuses on determining significance of
each input parameter of the application relative to the maximum
amount of water hammer estimated by the software. The study
determines estimated maximum water hammer variations due to
variations of input parameters including water temperature, pipe
type, thickness and diameter, electromotor rpm and power, and
moment of inertia of electromotor and pump. In our study,
Kuhrang Pumping Station was modeled using WaterGEMS
Software. The pumping station is characterized by total discharge
of 200 liters per second, dynamic height of 194 meters and 1.5
kilometers of steel conveyance pipeline and transports water to
Cheshme Morvarid for farmland irrigation. The model was run in
steady hydraulic condition and transferred to Hammer Software.
Then, the model was run in several unsteady hydraulic conditions
and sensitivity of maximum water hammer to each input parameter
was calculated. It is shown that parameters to which maximum
water hammer is most sensitive are moment of inertia of pump and
electromotor, diameter, type and thickness of pipe and water
temperature, respectively.
Abstract: This paper presents an exact solution and a finite element method (FEM) for a Piezoceramic Rod under static load. The cylindrical rod is made from polarized ceramics (piezoceramics) with axial poling. The lateral surface of the rod is traction-free and is unelectroded. The two end faces are under a uniform normal traction. Electrically, the two end faces are electroded with a circuit between the electrodes, which can be switched on or off. Two cases of open and shorted electrodes (short circuit and open circuit) will be considered. Finally, a finite element model will be used to compare the results with an exact solution. The study uses ABAQUS (v.6.7) software to derive the finite element model of the ceramic rod.
Abstract: Development of cities and villages, agricultural farms
and industrial regions in abutment and/or in the course of streams and
rivers or in prone flood lands has been caused more notations in
hydrology problems and city planning topics. In order to protection
of cities against of flood damages, embankment construction is a
desired and scientific method. The cities that located in arid zones
may damage by floods periodically. Zavvareh city in Ardestan
township(Isfahan province) with 7704 people located in Ardestan
plain that has been damaged by floods that have flowed from
dominant mountainous watersheds in past years with regard to return
period. In this study, according to flowed floods toward Zavvareh
city, was attempt to plan suitable hydraulic structures such as canals,
bridges and collectors in order to collection, conduction and
depletion of city surface runoff.