Abstract: In an electric power system, spinning reserve
requirements can be determined by using deterministic and/or
probabilistic measures. Although deterministic methods are usual in
many systems, application of probabilistic methods becomes
increasingly important in the new environment of the electric power
utility industry. This is because of the increased uncertainty
associated with competition. In this paper 1) a new probabilistic
method is presented which considers the reliability of transmission
system in a simplified manner and 2) deterministic and probabilistic
methods are compared. The studied methods are applied to the Roy
Billinton Test System (RBTS).