Generalized Method for Estimating Best-Fit Vertical Alignments for Profile Data

When the profile information of an existing road is missing or not up-to-date and the parameters of the vertical alignment are needed for engineering analysis, the engineer has to recreate the geometric design features of the road alignment using collected profile data. The profile data may be collected using traditional surveying methods, global positioning systems, or digital imagery. This paper develops a method that estimates the parameters of the geometric features that best characterize the existing vertical alignments in terms of tangents and the expressions of the curve, that may be symmetrical, asymmetrical, reverse, and complex vertical curves. The method is implemented using an Excel-based optimization method that minimizes the differences between the observed profile and the profiles estimated from the equations of the vertical curve. The method uses a 'wireframe' representation of the profile that makes the proposed method applicable to all types of vertical curves. A secondary contribution of this paper is to introduce the properties of the equal-arc asymmetrical curve that has been recently developed in the highway geometric design field.

Surveying the Environmental Biology Effects of Esfahan Factories on Zayandehrood Pollution

Water is the key of national development. Wherever a spring has been dried out or a river has changed its course, the area-s people have migrated and have been scattered and the area-s civilization has lost its brilliance. Today, air pollution, global warming and ozone layer damage are as the problems of countries, but certainly in the next decade the shortage and pollution of waters will be important issues of the world. The polluted waters are more dangerous in when they are used in agriculture. Because they infect plants and these plants are used in human and livestock consumption in food chain. With the increasing population growth and after that, the increase need to facilities and raw materials, human beings has started to do haste actions and wanted or unwanted destroyed his life basin. They try to overuse and capture his environment extremely, instead of having futurism approach in sustainable use of nature. This process includes Zayanderood recession, and caused its pollution after the transition from industrial and urban areas. Zayandehrood River in Isfahan is a vital artery of a living ecosystem. Now is the location of disposal waste water of many cities, villages and existing industries. The central area of the province is an important industrial place, and its environmental situation has reached a critical stage. Not only a large number of pollution-generating industries are active in the city limits, but outside of the city and adjacent districts Zayandehrood River, heavy industries like steel, Mobarakeh Steel and other tens great units pollute wild life. This article tries to study contaminant sources of Zayanderood and their severity, and determine and discuss the share of each of these resources by major industrial centers located in areas. At the end, we represent suitable strategy.

The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance

The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.

Case Studies of CSAMT Method Applied to Study of Complex Rock Mass Structure and Hidden Tectonic

In projects like waterpower, transportation and mining, etc., proving up the rock-mass structure and hidden tectonic to estimate the geological body-s activity is very important. Integrating the seismic results, drilling and trenching data, CSAMT method was carried out at a planning dame site in southwest China to evaluate the stability of a deformation. 2D and imitated 3D inversion resistivity results of CSAMT method were analyzed. The results indicated that CSAMT was an effective method for defining an outline of deformation body to several hundred meters deep; the Lung Pan Deformation was stable in natural conditions; but uncertain after the future reservoir was impounded. This research presents a good case study of the fine surveying and research on complex geological structure and hidden tectonic in engineering project.