Abstract: In the current study, energy and exergy analysis of a 65 MW steam power plant was carried out. This study investigated the effect of variations of overall conductance of the super heater on the performance of an existing steam power plant located in Derna, Libya. The performance of the power plant was estimated by a mathematical modelling which considers the off-design operating conditions of each component. A fully interactive computer program based on the mass, energy and exergy balance equations has been developed. The maximum exergy destruction has been found in the steam generation unit. A 50% reduction in the design value of overall conductance of the super heater has been achieved, which accordingly decreases the amount of the net electrical power that would be generated by at least 13 MW, as well as the overall plant exergy efficiency by at least 6.4%, and at the same time that would cause an increase of the total exergy destruction by at least 14 MW. The achieved results showed that the super heater design and operating conditions play an important role on the thermodynamics performance and the fuel utilization of the power plant. Moreover, these considerations are very useful in the process of the decision that should be taken at the occasions of deciding whether to replace or renovate the super heater of the power plant.
Abstract: A steam power plant is housed with various types of equipments like boiler, turbine, heat exchanger etc. These equipments are mainly connected with piping systems. Such a piping layout design depends mainly on stress analysis and flexibility. It will vary with respect to pipe geometrical properties, pressure, temperature, and supports. The present paper is to analyze the presence and effect of hangers and expansion joints in the piping layout/routing using CAESAR-II software. Main aim of piping stress analysis is to provide adequate flexibility for absorbing thermal expansion, code compliance for stresses and displacement incurred in piping system. The design is said to be safe if all these are in allowable range as per code. In this study, a sample problem is considered for analysis as per power piping ASME B31.1 code and the results thus obtained are compared.
Abstract: This article presents a current and future energy situation in Libya. The electric power efficiency and operating hours in power plants are evaluated from 2005 to 2010. Carbon dioxide emissions in most of power plants are estimated. In 2005, the efficiency of steam power plants achieved a range of 20% to 28%. While, the gas turbine power plants efficiency ranged between 9% and 25%, this can be considered as low efficiency. However, the efficiency improvement has clearly observed in some power plants from 2008 to 2010, especially in the power plant of North Benghazi and west Tripoli. In fact, these power plants have modified to combine cycle. The efficiency of North Benghazi power plant has increased from 25% to 46.6%, while in Tripoli it is increased from 22% to 34%. On the other hand, the efficiency improvement is not observed in the gas turbine power plants. When compared to the quantity of fuel used, the carbon dioxide emissions resulting from electricity generation plants were very high. Finally, an estimation of the energy demand has been done to the maximum load and the annual load factor (i.e., the ratio between the output power and installed power).
Abstract: This paper is concerned with calculating boiler
efficiency as one of the most important types of performance
measurements in any steam power plant. That has a key role in
determining the overall effectiveness of the whole system within the
power station. For this calculation, a Visual-Basic program was
developed, and a steam power plant known as El-Khmus power
plant, Libya was selected as a case study. The calculation of the
boiler efficiency was applied by using heating balance method. The
findings showed how the maximum heat energy which produced
from the boiler increases the boiler efficiency through increasing the
temperature of the feed water, and decreasing the exhaust
temperature along with humidity levels of the of fuel used within the
boiler.
Abstract: An actual power plant, which is the power plant of Iron and Steel Factory at Misurata city in Libya , has been modeled using Matlab in order to compare its results to the actual results of the actual cycle. This paper concentrates on two factors:
a- The comparison between exergy losses in the actual cycle and the modeled cycle.
b- The effect of extracting pressure on temperature water at boiler inlet.
Closed heat exchangers used in this plant have been substituted by open heat exchangers in the current study of the modeled power plant and the required changes in the pressure have been considered. In the following investigation the two points mentioned above are taken in consideration.
Abstract: This paper discusses coordinated reactive power -
voltage (Q-V) control in a multi machine steam power plant. The
drawbacks of manual Q-V control are briefly listed, and the design
requirements for coordinated Q-V controller are specified.
Theoretical background and mathematical model of the new
controller are presented next followed by validation of developed
Matlab/Simulink model through comparison with recorded
responses in real steam power plant and description of practical
realisation of the controller. Finally, the performance of
commissioned controller is illustrated on several examples of
coordinated Q-V control in real steam power plant and compared
with manual control.