Abstract: In case of abnormal situations, the nuclear power plant (NPP) operators must follow written procedures to check the condition of the plant and to classify the type of emergency. In this paper, we proposed a Real Time Expert System in order to improve operator’s performance in case of transient or accident with reactor shutdown. The expert system’s knowledge is based on the sequence of events (SoE) of known accident and two emergency procedures of the Brazilian Pressurized Water Reactor (PWR) NPP and uses two kinds of knowledge representation: rule and logic trees. The results show that the system was able to classify the response of the automatic protection systems, as well as to evaluate the conditions of the plant, diagnosing the type of occurrence, recovery procedure to be followed, indicating the shutdown root cause, and classifying the emergency level.
Abstract: This article describes the information system for
measuring and evaluating the dose rate in the environment of nuclear
power plants Mochovce and Bohunice in Slovakia.
The article presents the results achieved in the implementation of
the EU project – Research of monitoring and evaluation of nonstandard
conditions in the area of nuclear power plants. The
objectives included improving the system of acquisition, measuring
and evaluating data with mobile and autonomous units applying new
knowledge from research.
The article provides basic and specific features of the system and
compared to the previous version of the system, also new functions.
Abstract: Various advanced technologies will be adopted in Advanced Control Rooms (ACRs) of advanced Nuclear Power Plants (NPPs), which is thought to increase operators’ performance. However, potential human factors issues coupled with digital technologies might be troublesome. Human factors issues in ACRs are identified and strategies (or countermeasures) for evaluating and analyzing each of issues are addressed in this study.