Abstract: Building systems are highly vulnerable to different
kinds of faults and failures. In fact, various faults, failures and human
behaviors could affect the building performance. This paper tackles
the detection of unreliable sensors in buildings. Different literature
surveys on diagnosis techniques for sensor grids in buildings have
been published but all of them treat only bias and outliers. Occurences
of data gaps have also not been given an adequate span of attention
in the academia. The proposed methodology comprises the automatic thresholding
for data gap detection for a set of heterogeneous sensors in
instrumented buildings. Sensor measurements are considered to be
regular time series. However, in reality, sensor values are not
uniformly sampled. So, the issue to solve is from which delay each
sensor become faulty? The use of time series is required for detection of abnormalities on
the delays. The efficiency of the method is evaluated on measurements
obtained from a real power plant: an office at Grenoble Institute of
technology equipped by 30 sensors.
Abstract: Arrival flights tend to spend long waiting times at holding stacks if the arrival airport is congested. However, the waiting time spent in the air in the vicinity of the arrival airport may be reduced if the delays are distributed to the cruising phase of the arrival flights by means of speed control. Here, a case study was conducted for the flights arriving at Changi Airport. The flights that were assigned holdings were simulated to fly at a reduced speed during the cruising phase. As the study involves a single airport and is limited to imposing speed constraints to arrivals within 200 NM from its location, the simulation setup in this study could be considered as an application of the Extended Arrival Management (E-AMAN) technique, which is proven to result in considerable fuel savings and more efficient management of delays. The objective of this experiment was to quantify the benefits of imposing cruise speed constraints to arrivals at Changi Airport and to assess the effects on controllers’ workload. The simulation results indicated considerable fuel savings, reduced aircraft emissions and reduced controller workload.
Abstract: The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays. It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management. A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.
Abstract: The global coverage of broadband multimedia and
internet-based services in terrestrial-satellite networks demand
particular interests for satellite providers in order to enhance services
with low latencies and high signal quality to diverse users. In
particular, the delay of on-board processing is an inherent source
of latency in a satellite communication that sometimes is discarded
for the end-to-end delay of the satellite link. The frame work for this
paper includes modelling of an on-orbit satellite payload using an
agent model that can reproduce the properties of processing delays.
In essence, a comparison of different spatial interpolation methods is
carried out to evaluate physical data obtained by an GEO satellite
in order to define a discretization function for determining that
delay. Furthermore, the performance of the proposed agent and the
development of a delay discretization function are together validated
by simulating an hybrid satellite and terrestrial network. Simulation
results show high accuracy according to the characteristics of initial
data points of processing delay for Ku bands.
Abstract: A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.
Abstract: Negative Bias Temperature Instability (NBTI) is one of the critical degradation mechanisms in semiconductor device reliability that causes shift in the threshold voltage (Vth). However, thorough understanding of this reliability failure mechanism is still unachievable due to a recovery characteristic known as NBTI recovery. This paper will demonstrate the severity of NBTI recovery as well as one of the effective methods used to mitigate, which is the minimization of measurement system delays. Comparison was done in between two measurement systems that have significant differences in measurement delays to show how NBTI recovery causes result deviations and how fast measurement systems can mitigate NBTI recovery. Another method to minimize NBTI recovery without the influence of measurement system known as Fast Wafer Level Reliability (FWLR) NBTI was also done to be used as reference.
Abstract: Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.
Abstract: Supply Chain Risk Management refers to a set of strategies used by companies to avoid supply chain disruption caused by damage at production facilities, natural disasters, capacity issues, inventory problems, incorrect forecasts, and delays. Many companies use the techniques of the Toyota Production System, which in a way goes against a better management of supply chain risks. This paper studies key events in some multinationals to analyze the trade-off between the best supply chain risk management techniques and management policies designed to create lean enterprises. The result of a good balance of these actions is the reduction of losses, increased customer trust in the company and better preparedness to face the general risks of a supply chain.
Abstract: In this work, the IMC-PID controller cascaded filter based on Internal Model Control (IMC) scheme is systematically proposed for the simplified decoupling control system. The simplified decoupling is firstly introduced for multivariable processes by using coefficient matching to obtain a stable, proper, and causal simplified decoupler. Accordingly, transfer functions of decoupled apparent processes can be expressed as a set of n equivalent independent processes and then derived as a ratio of the original open-loop transfer function to the diagonal element of the dynamic relative gain array. The IMC-PID controller in series with filter is then directly employed to enhance the overall performance of the decoupling control system while avoiding difficulties arising from properties inherent to simplified decoupling. Some simulation studies are considered to demonstrate the simplicity and effectiveness of the proposed method. Simulations were conducted by tuning various controllers of the multivariate processes with multiple time delays. The results indicate that the proposed method consistently performs well with fast and well-balanced closed-loop time responses.
Abstract: The paper presents a PD controller for the Networked Control Systems (NCS) with delay. The major challenges in this networked control system (NCS) are the delay of the data transmission throughout the communication network. The comparative performance analysis is carried out for different delays network medium. In this paper, simulation is carried out on Ac servo motor control system using CAN Bus as communication network medium. The True Time toolbox of MATLAB is used for simulation to analyze the effect of different delays.
Abstract: Microscopic simulation tool kits allow for
consideration of the two processes of railway operations and the
previous timetable production. Block occupation conflicts on both
process levels are often solved by using defined train priorities. These
conflict resolutions (dispatching decisions) generate reactionary
delays to the involved trains. The sum of reactionary delays is
commonly used to evaluate the quality of railway operations, which
describes the timetable robustness. It is either compared to an
acceptable train performance or the delays are appraised
economically by linear monetary functions. It is impossible to
adequately evaluate dispatching decisions without a well-founded
objective function. This paper presents a new approach for the
evaluation of dispatching decisions. The approach uses mode choice
models and considers the behaviour of the end-customers. These
models evaluate the reactionary delays in more detail and consider
other competing modes of transport. The new approach pursues the
coupling of a microscopic model of railway operations with the
macroscopic choice mode model. At first, it will be implemented for
railway operations process but it can also be used for timetable
production. The evaluation considers the possibility for the customer
to interchange to other transport modes. The new approach starts to
look at rail and road, but it can also be extended to air travel. The
result of mode choice models is the modal split. The reactions by the
end-customers have an impact on the revenue of the train operating
companies. Different purposes of travel have different payment
reserves and tolerances towards late running. Aside from changes to
revenues, longer journey times can also generate additional costs.
The costs are either time- or track-specific and arise from required
changes to rolling stock or train crew cycles. Only the variable values
are summarised in the contribution margin, which is the base for the
monetary evaluation of delays. The contribution margin is calculated
for different possible solutions to the same conflict. The conflict
resolution is optimised until the monetary loss becomes minimal. The
iterative process therefore determines an optimum conflict resolution
by monitoring the change to the contribution margin. Furthermore, a
monetary value of each dispatching decision can also be derived.
Abstract: This paper deals with the problem of passivity
analysis for stochastic neural networks with leakage, discrete and
distributed delays. By using delay partitioning technique, free
weighting matrix method and stochastic analysis technique, several
sufficient conditions for the passivity of the addressed neural
networks are established in terms of linear matrix inequalities
(LMIs), in which both the time-delay and its time derivative can be
fully considered. A numerical example is given to show the
usefulness and effectiveness of the obtained results.
Abstract: This paper is concerned with the stability problem
with two additive time-varying delay components. By choosing one
augmented Lyapunov-Krasovskii functional, using some new zero
equalities, and combining linear matrix inequalities (LMI)
techniques, two new sufficient criteria ensuring the global stability
asymptotic stability of DNNs is obtained. These stability criteria are
present in terms of linear matrix inequalities and can be easily
checked. Finally, some examples are showed to demonstrate the
effectiveness and less conservatism of the proposed method.
Abstract: This paper deals with the problem of delay-dependent
stability for neural networks with distributed delays. Some new
sufficient condition are derived by constructing a novel
Lyapunov-Krasovskii functional approach. The criteria are
formulated in terms of a set of linear matrix inequalities, this is
convenient for numerically checking the system stability using the
powerful MATLAB LMI Toolbox. Moreover, in order to show the
stability condition in this paper gives much less conservative results
than those in the literature, numerical examples are considered.
Abstract: This paper studies the problem of asymptotically
stability for neural networks with time-varying delays.By establishing
a suitable Lyapunov-Krasovskii function and several novel sufficient
conditions are obtained to guarantee the asymptotically stability of the considered system. Finally,two numerical examples are given to illustrate the effectiveness of the proposed main results.
Abstract: This paper studies the problem of stability criteria
for neural networks with two additive time-varying delays.A new
Lyapunov-Krasovskii function is constructed and some new delay
dependent stability criterias are derived in the terms of linear
matrix inequalities(LMI), zero equalities and reciprocally convex
approach.The several stability criterion proposed in this paper is
simpler and effective. Finally,numerical examples are provided to
demonstrate the feasibility and effectiveness of our results.
Abstract: This paper deals with the problem of stability of
neural networks with leakage, discrete and distributed delays. A
new Lyapunov functional which contains some new double integral
terms are introduced. By using appropriate model transformation
that shifts the considered systems into the neutral-type time-delay
system, and by making use of some inequality techniques,
delay-dependent criteria are developed to guarantee the stability of
the considered system. Finally, numerical examples are provided to
illustrate the usefulness of the proposed main results.
Abstract: This paper studies the problem of exponential stability analysis for uncertain neural networks with discrete and distributed time-varying delays. Together with a suitable augmented Lyapunov Krasovskii function, zero equalities, reciprocally convex approach and a novel sufficient condition to guarantee the exponential stability of the considered system. The several exponential stability criterion proposed in this paper is simpler and effective. Finally,numerical examples are provided to demonstrate the feasibility and effectiveness of our results.
Abstract: In this paper, utilizing the Lyapunov functional method and combining linear matrix inequality (LMI) techniques and integral inequality approach (IIA) to study the exponential stability problem for neural networks with discrete and distributed time-varying delays.By constructing new Lyapunov-Krasovskii functional and dividing the discrete delay interval into multiple segments,some new delay-dependent exponential stability criteria are established in terms of LMIs and can be easily checked.In order to show the stability condition in this paper gives much less conservative results than those in the literature,numerical examples are considered.
Abstract: In this paper,the exponential passivity criteria for BAM neural networks with time-varying delays is studied.By constructing new Lyapunov-Krasovskii functional and dividing the delay interval into multiple segments,a novel sufficient condition is established to guarantee the exponential stability of the considered system.Finally,a numerical example is provided to illustrate the usefulness of the proposed main results