Abstract: Waste Load Allocation (WLA) strategies usually
intend to find economic policies for water resource management.
Water quality trading (WQT) is an approach that uses discharge
permit market to reduce total environmental protection costs. This
primarily requires assigning discharge limits known as total
maximum daily loads (TMDLs). These are determined by monitoring
organizations with respect to the receiving water quality and
remediation capabilities. The purpose of this study is to compare two
approaches of TMDL assignment for WQT policy in small catchment
area of Haraz River, in north of Iran. At first, TMDLs are assigned
uniformly for the whole point sources to keep the concentrations of
BOD and dissolved oxygen (DO) at the standard level at checkpoint
(terminus point). This was simply simulated and controlled by
Qual2kw software. In the second scenario, TMDLs are assigned
using multi objective particle swarm optimization (MOPSO) method
in which the environmental violation at river basin and total treatment
costs are minimized simultaneously. In both scenarios, the equity
index and the WLA based on trading discharge permits (TDP) are
calculated. The comparative results showed that using economically
optimized TMDLs (2nd scenario) has slightly more cost savings rather
than uniform TMDL approach (1st scenario). The former annually
costs about 1 M$ while the latter is 1.15 M$. WQT can decrease
these annual costs to 0.9 and 1.1 M$, respectively. In other word,
these approaches may save 35 and 45% economically in comparison
with command and control policy. It means that using multi objective
decision support systems (DSS) may find more economical WLA,
however its outcome is not necessarily significant in comparison with
uniform TMDLs. This may be due to the similar impact factors of
dischargers in small catchments. Conversely, using uniform TMDLs
for WQT brings more equity that makes stakeholders not feel that
much envious of difference between TMDL and WQT allocation. In
addition, for this case, determination of TMDLs uniformly would be
much easier for monitoring. Consequently, uniform TMDL for TDP
market is recommended as a sustainable approach. However,
economical TMDLs can be used for larger watersheds.
Abstract: The Cone Penetration Test (CPT) is a common in-situ
test which generally investigates a much greater volume of soil more
quickly than possible from sampling and laboratory tests. Therefore,
it has the potential to realize both cost savings and assessment of soil
properties rapidly and continuously. The principle objective of this
paper is to demonstrate the feasibility and efficiency of using
artificial neural networks (ANNs) to predict the soil angle of internal
friction (Φ) and the soil modulus of elasticity (E) from CPT results
considering the uncertainties and non-linearities of the soil. In
addition, ANNs are used to study the influence of different
parameters and recommend which parameters should be included as
input parameters to improve the prediction. Neural networks discover
relationships in the input data sets through the iterative presentation
of the data and intrinsic mapping characteristics of neural topologies.
General Regression Neural Network (GRNN) is one of the powerful
neural network architectures which is utilized in this study. A large
amount of field and experimental data including CPT results, plate
load tests, direct shear box, grain size distribution and calculated data
of overburden pressure was obtained from a large project in the
United Arab Emirates. This data was used for the training and the
validation of the neural network. A comparison was made between
the obtained results from the ANN's approach, and some common
traditional correlations that predict Φ and E from CPT results with
respect to the actual results of the collected data. The results show
that the ANN is a very powerful tool. Very good agreement was
obtained between estimated results from ANN and actual measured
results with comparison to other correlations available in the
literature. The study recommends some easily available parameters
that should be included in the estimation of the soil properties to
improve the prediction models. It is shown that the use of friction
ration in the estimation of Φ and the use of fines content in the
estimation of E considerable improve the prediction models.
Abstract: The crude oil in an oil well exists in various phases
such as gas, seawater, and sand, as well as oil. Therefore, a phase
separator is needed at the front of a single-phase pump for
pressurization and transfer. On the other hand, the application of a
multiphase pump can provide such advantages as simplification of the
equipment structure and cost savings, because there is no need for a
phase separation process. Therefore, the crude oil transfer method
using a multiphase pump is being applied to recently developed oil
wells. Due to this increase in demand, technical demands for the
development of multiphase pumps are sharply increasing, but the
progress of research into related technologies is insufficient, due to the
nature of multiphase pumps that require high levels of skills. This
study was conducted to verify the reliability of pump performance
evaluation using numerical analysis, which is the basis of the
development of a multiphase pump. For this study, a model was
designed by selecting the specifications of this study. The performance
of the designed model was evaluated through numerical analysis and
experiment. The results of the performance evaluation were compared
to verify the reliability of the result using numerical analysis.
Abstract: Construction project control attempts to obtain real-time information and effectively enhance dynamic control and management via information sharing and analysis among project participants to eliminate construction conflicts and project delays. However, survey results for Taiwan indicate that construction commercial project management software is not widely accepted for subcontractors and suppliers. To solve the project communications problems among participants, this study presents a novel system called the Construction Dynamic Teams Communication Management (Con-DTCM) system for small-to-medium sized subcontractors and suppliers in Taiwanese Construction industry, and demonstrates that the Con-DTCM system responds to the most recent project information efficiently and enhances management of project teams (general contractor, suppliers and subcontractors) through web-based environment. Web-based technology effectively enhances information sharing during construction project management, and generates cost savings via the Internet. The main unique characteristic of the proposed Con-DTCM system is extremely user friendly and easily design compared with current commercial project management applications. The Con-DTCM system is applied to a case study of construction of a building project in Taiwan to confirm the proposed methodology and demonstrate the effectiveness of information sharing during the construction phase. The advantages of the Con-DTCM system are in improving project control and management efficiency for general contractors, and in providing dynamic project tracking and management, which enables subcontractors and suppliers to acquire the most recent project-related information. Furthermore, this study presents and implements a generic system architecture.
Abstract: Among all mechanical joining processes, welding has
been employed for its advantage in design flexibility, cost saving,
reduced overall weight and enhanced structural performance.
However, for structures made of relatively thin components, welding
can introduce significant buckling distortion which causes loss of
dimensional control, structural integrity and increased fabrication
costs. Different parameters can affect buckling behavior of welded
thin structures such as, heat input, welding sequence, dimension of
structure. In this work, a 3-D thermo elastic-viscoplastic finite
element analysis technique is applied to evaluate the effect of shell
dimensions on buckling behavior and entropy generation of welded
thin shells. Also, in the present work, the approximated longitudinal
transient stresses which produced in each time step, is applied to the
3D-eigenvalue analysis to ratify predicted buckling time and
corresponding eigenmode. Besides, the possibility of buckling
prediction by entropy generation at each time is investigated and it is
found that one can predict time of buckling with drawing entropy
generation versus out of plane deformation. The results of finite
element analysis show that the length, span and thickness of welded
thin shells affect the number of local buckling, mode shape of global
buckling and post-buckling behavior of welded thin shells.
Abstract: A business case is a proposal for an investment
initiative to satisfy business and functional requirements. The
business case provides the foundation for tactical decision making
and technology risk management. It helps to clarify how the
organization will use its resources in the best way by providing
justification for investment of resources. This paper describes how
simulation was used for business case benefits and return on
investment for the procurement of 8 production machines. With
investment costs of about 4.7 million dollars and annual operating
costs of about 1.3 million, we needed to determine if the machines
would provide enough cost savings and cost avoidance. We
constructed a model of the existing factory environment consisting of
8 machines and subsequently, we conducted average day simulations
with light and heavy volumes to facilitate planning decisions
required to be documented and substantiated in the business case.
Abstract: Small satellites have become increasingly popular recently as a means of providing educational institutes with the chance to design, construct, and test their spacecraft from beginning to the possible launch due to the low launching cost. This approach is remarkably cost saving because of the weight and size reduction of such satellites. Weight reduction could be realised by utilising electromagnetic coils solely, instead of different types of actuators. This paper describes the restrictions of using only “Electromagnetic" actuation for 3D stabilisation and how to make the magnetorquer based attitude control feasible using Fuzzy Logic Control (FLC). The design is developed to stabilize the spacecraft against gravity gradient disturbances with a three-axis stabilizing capability.
Abstract: Lean, which was initially developed by Toyota, is
widely implemented in other companies to improve competitiveness.
This research is an attempt to identify the adoption of lean in the
production system of Malaysian car manufacturer, Proton using case
study approach. To gain the in-depth information regarding lean
implementation, an activity on the assembly line called Set Parts
Supply (SPS) was studied. The result indicates that by using lean
principles, tools and techniques in the implementation of SPS enabled
to achieve the goals on safety, quality, cost, delivery and morale. The
implementation increased the size of the workspace, improved the
quality of assembly and the delivery of parts supply, reduced the
manpower, achieved cost savings on electricity and also increased the
motivation of manpower in respect of attendance at work. A
framework of SPS implementation is suggested as a contribution for
lean practices in production system.
Abstract: This is an application research presenting the
improvement of production quality using the six sigma solutions and
the analyses of benefit-cost ratio. The case of interest is the
production of tile-concrete. Such production has faced with the
problem of high nonconforming products from an inappropriate
surface coating and had low process capability based on the strength
property of tile. Surface coating and tile strength are the most critical
to quality of this product. The improvements followed five stages of
six sigma solutions. After the improvement, the production yield was
improved to 80% as target required and the defective products from
coating process was remarkably reduced from 29.40% to 4.09%. The
process capability based on the strength quality was increased from
0.87 to 1.08 as customer oriented. The improvement was able to save
the materials loss for 3.24 millions baht or 0.11 million dollars. The
benefits from the improvement were analyzed from (1) the reduction
of the numbers of non conforming tile using its factory price for
surface coating improvement and (2) the materials saved from the
increment of process capability. The benefit-cost ratio of overall
improvement was high as 7.03. It was non valuable investment in
define, measure, analyses and the initial of improve stages after that
it kept increasing. This was due to there were no benefits in define,
measure, and analyze stages of six sigma since these three stages
mainly determine the cause of problem and its effects rather than
improve the process. The benefit-cost ratio starts existing in the
improve stage and go on. Within each stage, the individual benefitcost
ratio was much higher than the accumulative one as there was an
accumulation of cost since the first stage of six sigma. The
consideration of the benefit-cost ratio during the improvement
project helps make decisions for cost saving of similar activities
during the improvement and for new project. In conclusion, the
determination of benefit-cost ratio behavior through out six sigma
implementation period provides the useful data for managing quality
improvement for the optimal effectiveness. This is the additional
outcome from the regular proceeding of six sigma.
Abstract: This study proposes a materials procurement contracts
model to which the zero-cost collar option is applied for heading price
fluctuation risks in construction.The material contract model based on
the collar option that consists of the call option striking zone of the
construction company(the buyer) following the materials price
increase andthe put option striking zone of the material vendor(the
supplier) following a materials price decrease. This study first
determined the call option strike price Xc of the construction company
by a simple approach: it uses the predicted profit at the project starting
point and then determines the strike price of put option Xp that has an
identical option value, which completes the zero-cost material
contract.The analysis results indicate that the cost saving of the
construction company increased as Xc decreased. This was because the
critical level of the steel materials price increasewas set at a low level.
However, as Xc decreased, Xpof a put option that had an identical
option value gradually increased. Cost saving increased as Xc
decreased. However, as Xp gradually increased, the risk of loss from a
construction company increased as the steel materials price decreased.
Meanwhile, cost saving did not occur for the construction company,
because of volatility. This result originated in the zero-cost features of
the two-way contract of the collar option. In the case of the regular
one-way option, the transaction cost had to be subtracted from the cost
saving. The transaction cost originated from an option value that
fluctuated with the volatility. That is, the cost saving of the one-way
option was affected by the volatility. Meanwhile, even though the
collar option with zero transaction cost cut the connection between
volatility and cost saving, there was a risk of exercising the put option.
Abstract: In the past decade, the development of microstrip
sensor application has evolved tremendously. Although cut and trial
method was adopted to develop microstrip sensing applications in the
past, Computer-Aided-Design (CAD) is a more effective as it ensures
less time is consumed and cost saving is achieved in developing
microstrip sensing applications. Therefore microstrip sensing
applications has gained popularity as an effective tool adopted in
continuous sensing of moisture content particularly in products that is
administered mainly by liquid content. In this research, the Cole-Cole
representation of reactive relaxation is applied to assess the
performance of the microstrip sensor devices. The microstrip sensor
application is an effective tool suitable for sensing the moisture
content of dielectric material. Analogous to dielectric relaxation
consideration of Cole-Cole diagrams as applied to dielectric
materials, a “reactive relaxation concept” concept is introduced to
represent the frequency-dependent and moisture content
characteristics of microstrip sensor devices.
Abstract: This paper presents a new heuristic algorithm useful
for long-term planning of survivable WDM networks. A multi-period
model is formulated that combines network topology design and
capacity expansion. The ability to determine network expansion
schedules of this type becomes increasingly important to the
telecommunications industry and to its customers. The solution
technique consists of a Genetic Algorithm that allows generating
several network alternatives for each time period simultaneously and
shortest-path techniques to deduce from these alternatives a least-cost
network expansion plan over all time periods. The multi-period
planning approach is illustrated on a realistic network example.
Extensive simulations on a wide range of problem instances are
carried out to assess the cost savings that can be expected by
choosing a multi-period planning approach instead of an iterative
network expansion design method.