Abstract: In this paper an attempt has been made to correlate the usefulness of electrodes made through powder metallurgy (PM) in comparison with conventional copper electrode during electric discharge machining. Experimental results are presented on electric discharge machining of AISI D2 steel in kerosene with copper tungsten (30% Cu and 70% W) tool electrode made through powder metallurgy (PM) technique and Cu electrode. An L18 (21 37) orthogonal array of Taguchi methodology was used to identify the effect of process input factors (viz. current, duty cycle and flushing pressure) on the output factors {viz. material removal rate (MRR) and surface roughness (SR)}. It was found that CuW electrode (made through PM) gives high surface finish where as the Cu electrode is better for higher material removal rate.
Abstract: Capacity and efficiency of any refrigerating system
diminish rapidly as the difference between the evaporating and
condensing temperature is increased by a reduction in the evaporator
temperature. The single stage vapour compression refrigeration
system using various refrigerants are limited to an evaporator
temperature of -40 0C. Below temperature of -40 0C the either
cascade refrigeration system or multi stage vapour compression
system is employed. Present work describes thermal design of
condenser (HTS), cascade condenser and evaporator (LTS) of
R404A-R508B and R410A-R23 cascade refrigeration system. Heat
transfer area of condenser, cascade condenser and evaporator for
both systems are compared and the effect of condenser and
evaporator temperature on heat-transfer area for both systems is
studied under same operating condition. The results shows that the
required heat-transfer area of condenser and cascade condenser for
R410A-R23 cascade system is lower than the R404A-R508B cascade
system but heat transfer area of evaporator is similar for both the
system. The heat transfer area of condenser and cascade condenser
decreases with increase in condenser temperature (Tc), whereas the
heat transfer area of cascade condenser and evaporator increases with
increase in evaporator temperature (Te).
Abstract: Stuck-pipe in drilling operations is one of the most
pressing and expensive problems in the oil industry. This paper
describes a computational simulation and an experimental study of
the hydrodynamic vibrator, which may be used for liquidation of
stuck-pipe problems during well drilling. The work principle of the
vibrator is based upon the known phenomena of Vortex Street of
Karman and the resulting generation of vibrations. We will discuss
the computational simulation and experimental investigations of
vibrations in this device. The frequency of the vibration parameters
has been measured as a function of the wide range Reynolds Number.
The validity of the computational simulation and of the assumptions
on which it is based has been proved experimentally. The
computational simulation of the vibrator work and its effectiveness
was carried out using FLUENT software. The research showed high
degree of congruence with the results of the laboratory tests and
allowed to determine the effect of the granular material features upon
the pipe vibration in the well. This study demonstrates the potential
of using the hydrodynamic vibrator in a well drilling system.
Abstract: The NGN (Next Generation Network), which can
provide advanced multimedia services over an all-IP based network, has been the subject of much attention for years. While there have
been tremendous efforts to develop its architecture and protocols, especially for IMS, which is a key technology of the NGN, it is far
from being widely deployed. However, efforts to create an advanced
signaling infrastructure realizing many requirements have resulted in a
large number of functional components and interactions between those
components. Thus, the carriers are trying to explore effective ways to
deploy IMS while offering value-added services. As one such
approach, we have proposed a self-organizing IMS. A self-organizing
IMS enables IMS functional components and corresponding physical
nodes to adapt dynamically and automatically based on situation such
as network load and available system resources while continuing IMS
operation. To realize this, service continuity for users is an important
requirement when a reconfiguration occurs during operation. In this
paper, we propose a mechanism that will provide service continuity to
users and focus on the implementation and describe performance
evaluation in terms of number of control signaling and processing time
during reconfiguration