Modeling the Uncertainty of the Remanufacturing Process for Consideration of Extended Producer Responsibility (EPR)

There is a growing body of evidence to support the proposition of product take back for remanufacturing particularly within the context of Extended Producer Responsibility (EPR). Remanufacturing however presents challenges unlike that of traditional manufacturing environments due to its high levels of uncertainty which may further distract organizations from considering its potential benefits. This paper presents a novel modeling approach for evaluating the uncertainty of part failures within the remanufacturing process and its impact on economic and environmental performance measures. This paper presents both the theoretical modeling approach and an example of its use in application.




References:
[1] Jain, V.,"Editorial: Special issue on supply chain management and
reverse logistics,"International Journal of Production Research, 50 (5),
pp.1239-1242, 2012.
[2] Gunasekaran, A. andSpalanzani, A. "Sustainability of manufacturing
and services: Investigations for research and applications,"International
Journal of Production Economics, doi:10.1016/j.ijpe.2011.05.011
[3] D. Guide Jr., "Production planning and control for remanufacturing:
industry practice and research needs," Journal of Operations
Management, 18, pp.467-483, 2000.
[4] Johnson , M. and Wang, M., "Economical evaluation of disassembly
operations for recycling, remanufacturing and reuse,"International
Journal of Production Research, 36, pp.3227-3252, 1998.
[5] Karakayalı, I., Emir-Farinas, H. andAkçalı, E., "Pricing and recovery
planning for demanufacturing operations with multiple used products
and multiple reusable components,"Computers & Industrial
Engineering, 59, pp.55-63, 2010.
[6] Corbett, C.J. and Kleindorfer, P.R., "Environmental management and
operationsmanagement,"Production and Operations Management, 10
(2), pp.107-111, 2001.
[7] Martin, P., Guide, V.D.R., Craighead, C.W., "Supply Chain Sourcing in
Remanufacturing Operations: An Empirical Investigation of Remake
Versus Buy," Decision Sciences, 41, (2), May, 2010.
[8] Directive 2002/96/EC of the European Parliament and Council of 27
January 2003 on waste electrical and electronic equipment (WEEE),
Official Journal of the European Union, 13.2.2003.
[9] Azadivar, F. and Ordoobadi, S. "A Simulation Model to Justify
Remanufacturing Policies," Proceedings of the 2010 Winter Simulation
Conference, Dec, 2010, Baltimore, USA.
[10] V. D. R. Guide, and R. Srivastava, "An evaluation of order release
strategies in a remanufacturing environment," Computers & Operations
Research, 24, pp.37-47, Jan, 1997.
[11] Teunter, R.H. and Flapper, S.D. "Optimal core acquisition and
remanufacturing policies under uncertain corequality fractions,"
European Journal of Operational Research, 210, pp.241-248, 2011.
[12] C. B. Li, Y. Tang, and C. C. Li, "A GERT-based Analytical Methodfor
Remanufacturing Process Routing," Proceedings of IEEE 7th
International Conference on Automation Science and Engineering,
Trieste, Italy, pp.462-467, Aug, 2011.
[13] Tang, Y. "Uncertainty Management in Remanufacturing: A Review,"
8th IEEE International Conference on Automation Science and
Engineering, Aug, 2012, Seoul, Korea.
[14] Shu, L. H. and Flowers, W. C. "Application of a Design for
Remanufacture Framework to the Selection of Product Life-Cycle
Fastening and Joining Methods,"Robotics and Computer Integrated
Manufacturing, 15, (3), pp.179-190, 1999.
[15] K. Inderfurth, "Impact of uncertainties on recovery behavior in
aremanufacturing environment: A numerical analysis," International
Journal of Physical Distribution and Logistics Management, 35, (5),pp.
318-336, 2005.
[16] Ferrer,G.,"Yieldinformationandsupplierresponsivenessinremanufacturin
g operations," EuropeanJournalofOperationalResearch, 149, pp.540-
556, 2003.
[17] Ketzenberg,M.E.,VanderLaan,E.A.,and Teunter,R.H., "The value of
information in reverselogistics,"ERIM ReportSeriesReferenceNoERS-
2004-053-LIS, 2004.
[18] Ferrer, G., and Ketzenberg, M. E. "Value of information inr
emanufacturingcomplex products,"IIETransactions, 36, pp.265-277,
2004.
[19] Zikopoulos, C. andTagaras, G. "On the attractiveness of sorting
beforedisassembly inaremanufacturingfacility,"IIE Transactions,40,
pp.313-323, 2004.
[20] Johnson, M.R. and McCarthy, I.P. "Remanufacturing Optimization
within the context ofExtended Producer Responsibility," 2nd
International Conference on Operations Research and Statistics, April,
2012, Bali, Indonesia.