Study of the Effect of Project Management on Manufacturing and Production Projects

In this article the accumulated results out of the effects and length of the manufacture and production projects in the university and research standard have been settled with the usefulness definition of the process of project management for the accessibility to the proportional pattern in the “time and action" stages. Studies show that many problems confronted by the researchers in these projects are connected to the non-profiting of: 1) autonomous timing for gathering the educational theme, 2) autonomous timing for planning and pattern, presenting before the construction, and 3) autonomous timing for manufacture and sample presentation from the output. The result of this study indicates the division of every manufacture and production projects into three smaller autonomous projects from its kind, budget and autonomous expenditure, shape and order of the stages for the management of these kinds of projects. In this case study real result are compared with theoretical results.




References:
[1] T. Janice, and M. Thomas, 2008. "Preparing project managers to deal
with complexity - Advanced project management education." Int. J.
Project Manage. vol. 26, no. 3, pp. 304-315.
[2] M. Q. Tahir, A. S. Warraich and S. T. Hijazi, 2009. "Significance of
project management performance assessment (PMPA) model." Int. J.
Project Manage. vol. 27, no. 4, pp. 378-388.
[3] A. Soderholm, 2008. "Project management of unexpected events." Int. J.
Project Manage. vol. 26, no. 1, pp. 80-86.
[4] E. Ocal, E. L. Oral, and E. Erdis, 2006. "Crisis management in Turkish
construction industry." Build. and Environ. vol. 41, no.11, pp. 1498-
1503.
[5] M. Loosemore, 1998. "The three ironies of crisis management in
construction projects." Int. J. Project Manage. vol. 16, no. 3, pp. 139-
144.
[6] P. Chen, and D. Partington, 2006. "Three conceptual levels of
construction project management work." Int. J. Project Manage. vol. 24,
no. 5, pp. 412-421.
[7] S. Cicmil, T. Williams, J. Thomas, and D. Hodgson, 2006. "Rethinking
Project Management: Researching the actuality of projects." Int. J.
Project Manage. vol. 24, no.8, pp. 675-686.
[8] J. Yang, 2007. "Developing a knowledge map for construction
scheduling using a novel approach." Autom. Constr. vol. 16, no. 6, pp.
806-815.
[9] P. M. Goodrum, M. A. McLaren, and A. Durfee, 2006. "The application
of active radio frequency identification technology for tool tracking on
construction job sites." Autom. Constr. vol. 15, no. 3, pp. 292 - 302.
[10] V. Ahuja, J. Yang, and R. Shankar, 2009. "Study of ICT adoption for
building project management in the Indian construction industry."
Autom. Constr. vol. 18, no. 4, pp. 415-423.
[11] V. T. Luu, S. Y. Kim, V. N. Tuan, and S. O. Ogunlana, 2009.
"Quantifying schedule risk in construction projects using Bayesian
belief networks." Int. J. Project Manage. vol. 27, no. 1, pp. 39-50.
[12] Y. H. Kwak, and F. T. Anbari, 2009. "Analyzing project management
research: Perspectives from top management journals." Int. J. Project
Manage. vol. 27, no. 5, pp. 435-446.
[13] S. Woksepp, and T. Olofsson, 2008. "Credibility and applicability of
virtual reality models in design and construction." Adv. Eng. Inf. vol.
22, no. 4, pp. 520-528.
[14] X. Zhang, X. Mao, and S. M. AbouRizk, 2009. "Developing a
knowledge management system for improved value engineering
practices in the construction industry" Autom. Constr. vol. 18, no. 6, pp.
777-789.
[15] P. H. Brown, D. Tullos, B. Tilt, D. Magee, and A. T. Wolf, 2009.
"Modeling the costs and benefits of dam construction from a
multidisciplinary perspective." Int. J. Project Manage. vol. 90, s. 3, pp.
S303-S311.
[16] D. V. Covin, and C. Trimble, 2004. "Strategic innovation and science of
learning." IEEE Eng. Manage. Rev. vol. 45, no.2, 67-75.
[17] T. H. Davenport, D. W. De Long, and M. C. Beers, 1998. "Successful
knowledge management project." MIT Sloan management review, vol.
39, no. 2, pp. 43-57.
[18] T. Takai, J. Conaty, The educational system in Japan, Tokyo, Japan,
June 1998.
[19] S. B. Ahmadi, Educational program for M. Sc. & Ph. D. students. T. M.
U publication, Tehran, Iran, 1991-2005.
[20] S. B. Ahmadi, Management of inverted knowledge : new method in
organization. The 2th Conference on Information and Communication
Technology Management (ICTM), Tehran, Iran, 2006.
[21] L. Valikangas and M. Gilbert, "Boundary-setting strategies for escaping
innovation trap." MIT Sloan Management Review, vol. 46, no. 3, pp.
58-63.
[22] M. S. Ahmadiyeh, Breeding talents. Inteshar Publication, Tehran, Iran,
1993.
[23] Z.A. Taghipour, Introductions on the educational planning, Publications
Agah, Tehran, Iran, 1989.
[24] A. K. Saif, Study methods. Rushd Publication, Tehran, Iran, 1985.
[25] National Institute for Educational Research (NIER), A workshop report
on science and technology education a direction for the change of
curriculum. Tokyo, Japan, April 1992.
[26] M. Stefik, and B. Stefik, Stories and strategies of radical innovation,
MIT Press, USA, 2004.
[27] G. Durees, Behavioral training in brilliant breeding, Translated by Astan
Quds Razvi Publication, Mshhad, Iran, 1990.
[28] Center for Educational Management Publication, Educational methods
in creating human resource (eds), Tehran, Iran, 1996.
[29] Kyoto University Bulletin., Kyoto, Japan, 1897-1987.