A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns
The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.
[1] I. Abdul-Rahman A.H. Memon and A.T. Abd. Karim, “Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia”, Journal of Applied Sciences, Vol. 13 no. 2, pp 286-293, 2013
[2] M. Osmani, J. Glass, and A.D. Price, "Architect and contractor attitudes towards waste minimisation," Waste and Resource Management, Vol. 59, no.2, pp 65 – 72, 2008.
[3] S. Nagapan, I. Abdul-Rahman, A. Asmi and A. Hameed, “Identifying the Causes of Construction Waste –Case of Central”, International Journal of Integrated Engineering, Vol. 4, no. 2, pp 22-28, 2012.
[4] T. O. Adewuyi and M. Otali, “Evaluation of Causes of Construction Material Waste: Case of River State, Nigeria”, Ethiopian Journal of Environmental Studies and Management Vol. 6, pp 746-753, 2013.
[5] S.P. Teo, O. Abdelnaser and H.K. Abdul, “Material Wastage in Malaysian Construction Industry”, International Conference on Economics and Administration, Faculty of Administration, University of Bucharest Romania. P 257-264, 2009.
[6] M. Osmani, "Construction waste." Chap. 15 in Waste: A handbook for management, by Letcher and Vallero, 1-565. San Diego: Academic Press an imprint of Elsevier, 2011
[7] J. O. Ameh and E. D. Itodo, “Professionals’ Views of Material Wastage on Construction Sites”, Organization, Technology and Management in Construction. An International Journal, Vol. 5 no 1, pp747-757, 2013.
[8] A.H. Memon, I. Abdul-Rahman, N.Y. Zainun, and A.T. Abd-Karim, "Web-based Risk Assessment Technique for Time and Cost Overrun (WRATTCO)–A Framework," Procedia - Social and Behavioral Sciences, Vol.129, pp178 – 185, 2013.
[9] F.S. Allahaim, and L. Liu, “Cost Overrun Causes the Framework in Infrastructure Projects: Toward a Typology”, 37th Australian University Building Educators Association, International Conference (AUBEA 2012) Sydney, University of NSW (UNSW). PP1-15, 2012.
[10] R. Apolot, H. Alinaitwe, and D. Tindiwensi, “An Investigation into the Causes of Delay and Cost Overrun in Uganda’s Public Sector Construction Projects” In Second International Conference on Advances in Engineering and Technology. Uganda. PP305-311, 2010.
[11] Y. A. Olawale, and M. Sun, “Cost and Time Control of Construction Projects: Inhibiting Factors and MitigatingMeasures in Practice”, Construction Management and Economics, Vol. 28 no. 5, pp509–526, 2010.
[12] P. Love, D. Edwards and Z. Irani, "Moving Beyond Optimism Bias and Strategic Misrepresentation; An Explanation for Social Infrastructure Project Cost Overruns." IEEE Transaction on Engineering Management, 2011.
[13] A. B. Wahab and A. F. Lawal, “An Evaluation of Waste Control Measures” African Journal of Environmental Science and Technology, Vol. 5 pp3, pp246-254, 2011.
[14] R. A. Begum, C. Siwar, J. J. Pereira, and A. Jaafar, "Implementation of waste management and minimisation in the construction industry of Malaysia," Resources, Conservation and Recycling Vol. 51, pp 190–202, 2007.
[15] S. Nagapan, I. Abdul-Rahman and A. Asmi, “Factors Contributing to Physical and Non-Physical Waste Journal of Advances in Applied Sciences (IJAAS), Vol 1no 1, 1-10, 2012.
[16] U. Ma, “No Waste: Managing Sustainability in Construction,” Surrey: Gower Publishing Limited. 118-120, 2011.
[17] A.H. Memon, I. Abdul-Rahman and I. Memon, "RuleBased DSS in Controlling Construction Waste." Life Science Journal, Vol. 11 no. 6 pp417-424, 2014.
[18] S. O. Babatunde, “Quantitative Assessment ofConstruction Material Wastage in Nigerian Construction Sites”, Journal of Emerging Trends in Economics and Management Sciences, Vol. 3 no 3, 238-241, 2012.
[19] A. Al-Hajj and K. Hamani, "Material Waste in the UAE Construction Industry: Main Causes and Minimisation Practices." Architectural Engineering and Design Management (Heriot-Watt University Gate way), Vol. 7 no. 4 pp 221-235, 2011.
[20] O. J. Oladiran, "Causes and Minimization Techniques of Materials Waste in Nigerian Construction Process," Fifth International Conference on Construction in the 21st Century (CITC-V). Istanbul, Turkey, pp 20-22,2009.
[21] B. Nguyen, H. Gupta and S. Faniran, "Waste Minimization Strategiesin the Construction Industry-A Geelong Case Study," Geelong, pp1-10, n.d.
[22] Z. T. Zewdu and G.T. Aregaw, "Causes of Contractor Cost Overrun in Construction Projects: The Case of Ethiopian Construction Sector," International Journal of Business and Economics Research, Vol. 4, no. 4, pp180-191, 2015.
[23] T. Subramani, P. S. Sruthi and M. Kavitha, “Causes of Cost Overrun In Construction”, IOSR Journal ofEngineering (IOSRJEN) Vol. 4, no. 6, pp 2278-8719, 2014.
[24] K. K. Chitkara, “Construction Project Management – Planning, Scheduling and Controlling. 2nd Edition, TataMcGraw Hills., 2011.
[25] D.D. Ahiaga-Dagbui and S.D. Smith, "Dealing with Construction Cost overruns using Data Mining," Construction Management and Economics, Vol. 32 no. 7-8, pp 682-694, 2014.
[26] S. Shanmugapriya and K. Subramanian, "Investigation of Significant Factors affecting Time and Cost Overrunin Indian Construction Projects," International Journal of Emerging Technology and Advanced Engineering Vol. 3 no. 10, pp 734-740, 2013.
[27] F. Nega, "Causes and Effects of Cost overrun on Public Building Construction Projects in Ethopia, (Msc Dissertation, Ethopia)” Unpublished, 2008.
[28] M.A. Kasimu, “Significant Factors that Cause Cost Overrun in Building Projects in Nigeria”, Interdisciplinary Journal of Contemporary Research in Business Vol. 3, no.11, pp775-780, 2012.
[29] L. Le-Hoai, Y.D. Lee, and J.Y. Lee, “Delay and Cost Overrun in Vietnam, Large Construction Projects: Acomparison with Other Selected Countries”, KSCE Journal of Civil Engineering, Vol. 12, no 6, pp367-377, 2008.
[30] R.F. Aziz, "Factors causing cost variation for constructing wastewater projects in Egypt." Alexandria Engineering Journal Vol. 52, pp 51–66, 2013.
[31] I. H. Seeley, “Building Economics”, London: Macmillan Press Ltd, 1996.
[32] K. T. Odusami, O. J. Oladiran and S. A. Ibrahim, "Evaluation of Materials Wastage and Control in Some Selected Building Sites in Nigeria," Emirates Journal for Engineering Research, Vol. 17 no. 2, pp 53-65,2012.
[33] O. Aiyetan and J. Smallwood, "Materials Management and Waste Minimisation on Construction Sites in Lagos State, Nigeria," Proceedings of the 4th International Conference on Engineering, Project, and Production Management (EPPM, 2013. 1161-1172, 2013.
[34] O.J. Ameh and E.E. Osegbe, “Study of Relationship between Time Overrun and Productivity on Construction Sites”, International Journal of Construction Supply Chain Management, Vol. 1, no.1, 56-67, 2011.
[35] S. Jackson, “Project Cost Overruns and Risk Management, Paper, Whiteknights: School of Construction Management and Engineering, The University of Reading, 2002.
[36] E.C. Ubani, K.A. Okorocha, and S.C. Emeribe, "Analysis of Factors influencing Time and Cost overrun on Construction Projects in South Estern Nigeria," International Journal of Management Sciences and Business Research Vol. 2, no. 2, pp 73-84, 2011.
[37] K. Okolie, “Performance Evaluation of Buildings in Educational Institutions: A Case of Universities in South-East Nigeria, (Unpublished PhD Thesis),” Port Elizabeth: Nelson Mandela Metropolitan University, 2011.
[1] I. Abdul-Rahman A.H. Memon and A.T. Abd. Karim, “Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia”, Journal of Applied Sciences, Vol. 13 no. 2, pp 286-293, 2013
[2] M. Osmani, J. Glass, and A.D. Price, "Architect and contractor attitudes towards waste minimisation," Waste and Resource Management, Vol. 59, no.2, pp 65 – 72, 2008.
[3] S. Nagapan, I. Abdul-Rahman, A. Asmi and A. Hameed, “Identifying the Causes of Construction Waste –Case of Central”, International Journal of Integrated Engineering, Vol. 4, no. 2, pp 22-28, 2012.
[4] T. O. Adewuyi and M. Otali, “Evaluation of Causes of Construction Material Waste: Case of River State, Nigeria”, Ethiopian Journal of Environmental Studies and Management Vol. 6, pp 746-753, 2013.
[5] S.P. Teo, O. Abdelnaser and H.K. Abdul, “Material Wastage in Malaysian Construction Industry”, International Conference on Economics and Administration, Faculty of Administration, University of Bucharest Romania. P 257-264, 2009.
[6] M. Osmani, "Construction waste." Chap. 15 in Waste: A handbook for management, by Letcher and Vallero, 1-565. San Diego: Academic Press an imprint of Elsevier, 2011
[7] J. O. Ameh and E. D. Itodo, “Professionals’ Views of Material Wastage on Construction Sites”, Organization, Technology and Management in Construction. An International Journal, Vol. 5 no 1, pp747-757, 2013.
[8] A.H. Memon, I. Abdul-Rahman, N.Y. Zainun, and A.T. Abd-Karim, "Web-based Risk Assessment Technique for Time and Cost Overrun (WRATTCO)–A Framework," Procedia - Social and Behavioral Sciences, Vol.129, pp178 – 185, 2013.
[9] F.S. Allahaim, and L. Liu, “Cost Overrun Causes the Framework in Infrastructure Projects: Toward a Typology”, 37th Australian University Building Educators Association, International Conference (AUBEA 2012) Sydney, University of NSW (UNSW). PP1-15, 2012.
[10] R. Apolot, H. Alinaitwe, and D. Tindiwensi, “An Investigation into the Causes of Delay and Cost Overrun in Uganda’s Public Sector Construction Projects” In Second International Conference on Advances in Engineering and Technology. Uganda. PP305-311, 2010.
[11] Y. A. Olawale, and M. Sun, “Cost and Time Control of Construction Projects: Inhibiting Factors and MitigatingMeasures in Practice”, Construction Management and Economics, Vol. 28 no. 5, pp509–526, 2010.
[12] P. Love, D. Edwards and Z. Irani, "Moving Beyond Optimism Bias and Strategic Misrepresentation; An Explanation for Social Infrastructure Project Cost Overruns." IEEE Transaction on Engineering Management, 2011.
[13] A. B. Wahab and A. F. Lawal, “An Evaluation of Waste Control Measures” African Journal of Environmental Science and Technology, Vol. 5 pp3, pp246-254, 2011.
[14] R. A. Begum, C. Siwar, J. J. Pereira, and A. Jaafar, "Implementation of waste management and minimisation in the construction industry of Malaysia," Resources, Conservation and Recycling Vol. 51, pp 190–202, 2007.
[15] S. Nagapan, I. Abdul-Rahman and A. Asmi, “Factors Contributing to Physical and Non-Physical Waste Journal of Advances in Applied Sciences (IJAAS), Vol 1no 1, 1-10, 2012.
[16] U. Ma, “No Waste: Managing Sustainability in Construction,” Surrey: Gower Publishing Limited. 118-120, 2011.
[17] A.H. Memon, I. Abdul-Rahman and I. Memon, "RuleBased DSS in Controlling Construction Waste." Life Science Journal, Vol. 11 no. 6 pp417-424, 2014.
[18] S. O. Babatunde, “Quantitative Assessment ofConstruction Material Wastage in Nigerian Construction Sites”, Journal of Emerging Trends in Economics and Management Sciences, Vol. 3 no 3, 238-241, 2012.
[19] A. Al-Hajj and K. Hamani, "Material Waste in the UAE Construction Industry: Main Causes and Minimisation Practices." Architectural Engineering and Design Management (Heriot-Watt University Gate way), Vol. 7 no. 4 pp 221-235, 2011.
[20] O. J. Oladiran, "Causes and Minimization Techniques of Materials Waste in Nigerian Construction Process," Fifth International Conference on Construction in the 21st Century (CITC-V). Istanbul, Turkey, pp 20-22,2009.
[21] B. Nguyen, H. Gupta and S. Faniran, "Waste Minimization Strategiesin the Construction Industry-A Geelong Case Study," Geelong, pp1-10, n.d.
[22] Z. T. Zewdu and G.T. Aregaw, "Causes of Contractor Cost Overrun in Construction Projects: The Case of Ethiopian Construction Sector," International Journal of Business and Economics Research, Vol. 4, no. 4, pp180-191, 2015.
[23] T. Subramani, P. S. Sruthi and M. Kavitha, “Causes of Cost Overrun In Construction”, IOSR Journal ofEngineering (IOSRJEN) Vol. 4, no. 6, pp 2278-8719, 2014.
[24] K. K. Chitkara, “Construction Project Management – Planning, Scheduling and Controlling. 2nd Edition, TataMcGraw Hills., 2011.
[25] D.D. Ahiaga-Dagbui and S.D. Smith, "Dealing with Construction Cost overruns using Data Mining," Construction Management and Economics, Vol. 32 no. 7-8, pp 682-694, 2014.
[26] S. Shanmugapriya and K. Subramanian, "Investigation of Significant Factors affecting Time and Cost Overrunin Indian Construction Projects," International Journal of Emerging Technology and Advanced Engineering Vol. 3 no. 10, pp 734-740, 2013.
[27] F. Nega, "Causes and Effects of Cost overrun on Public Building Construction Projects in Ethopia, (Msc Dissertation, Ethopia)” Unpublished, 2008.
[28] M.A. Kasimu, “Significant Factors that Cause Cost Overrun in Building Projects in Nigeria”, Interdisciplinary Journal of Contemporary Research in Business Vol. 3, no.11, pp775-780, 2012.
[29] L. Le-Hoai, Y.D. Lee, and J.Y. Lee, “Delay and Cost Overrun in Vietnam, Large Construction Projects: Acomparison with Other Selected Countries”, KSCE Journal of Civil Engineering, Vol. 12, no 6, pp367-377, 2008.
[30] R.F. Aziz, "Factors causing cost variation for constructing wastewater projects in Egypt." Alexandria Engineering Journal Vol. 52, pp 51–66, 2013.
[31] I. H. Seeley, “Building Economics”, London: Macmillan Press Ltd, 1996.
[32] K. T. Odusami, O. J. Oladiran and S. A. Ibrahim, "Evaluation of Materials Wastage and Control in Some Selected Building Sites in Nigeria," Emirates Journal for Engineering Research, Vol. 17 no. 2, pp 53-65,2012.
[33] O. Aiyetan and J. Smallwood, "Materials Management and Waste Minimisation on Construction Sites in Lagos State, Nigeria," Proceedings of the 4th International Conference on Engineering, Project, and Production Management (EPPM, 2013. 1161-1172, 2013.
[34] O.J. Ameh and E.E. Osegbe, “Study of Relationship between Time Overrun and Productivity on Construction Sites”, International Journal of Construction Supply Chain Management, Vol. 1, no.1, 56-67, 2011.
[35] S. Jackson, “Project Cost Overruns and Risk Management, Paper, Whiteknights: School of Construction Management and Engineering, The University of Reading, 2002.
[36] E.C. Ubani, K.A. Okorocha, and S.C. Emeribe, "Analysis of Factors influencing Time and Cost overrun on Construction Projects in South Estern Nigeria," International Journal of Management Sciences and Business Research Vol. 2, no. 2, pp 73-84, 2011.
[37] K. Okolie, “Performance Evaluation of Buildings in Educational Institutions: A Case of Universities in South-East Nigeria, (Unpublished PhD Thesis),” Port Elizabeth: Nelson Mandela Metropolitan University, 2011.
@article{"International Journal of Business, Human and Social Sciences:72256", author = "Saidu Ibrahim and Winston M. W. Shakantu", title = "A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns", abstract = "The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.
", keywords = "Conceptual framework, cost overrun, material waste, project stags.", volume = "10", number = "2", pages = "587-7", }