A Comparative Analysis of Activity-Based Costing and Traditional Costing

Activity-Based Costing (ABC) which has become an important aspect of manufacturing/service organizations can be defined as a methodology that measures the cost and performance of activities, resources and cost objects. It can be considered as an alternative paradigm to traditional cost-based accounting systems. The objective of this paper is to illustrate an application of ABC method and to compare the results of ABC with traditional costing methods. The results of the application highlight the weak points of traditional costing methods and an S-Curve obtained is used to identify the undercosted and overcosted products of the firm.





References:
[1] M. Özbayrak, M.Akgün, and A.K. Türker, "Activity-based cost
estimation in a push/pull advanced manufacturing system," International
Journal of Production Economics, vol. 87, pp. 49-65, 2004.
[2] R. Cooper, and R.S. Kaplan, "How cost accounting distorts product
costs," Management Accounting, vol. 69, pp. 20-27, 1988.
[3] G. Kim, C.S. Park, and M. J. Kaiser, "Pricing investment and
production activities for an advanced manufacturing system,"
Engineering Economist, vol. 42, no. 4, pp.303-324, 1997.
[4] A. Gunasekaran, and M.Sarhadi, "Implementation of activity-based
costing in manufacturing," International Journal of Production
Economics, vol.56-57, pp. 231-242, 1998.
[5] D. Ben-Arieh, and L. Qian, "Activity-based cost management for design
and development stage," International Journal of Production Economics,
vol.83, pp.169-183, 2003.
[6] R. J. Lewis, "Activity-based models for cost management systems,"
Quorum Books, Westport, CT, 1995.
[7] U. Köker, "Activity-based costing: Implementation in a sanitaryware
company," M.Sc. Thesis, Department of Industrial Engineering,
University of Dokuz Eyl├╝l, 2003.
[8] G. Cokins, "Activity-based cost management making it works,"
McGraw-Hill. Inc., 1997.