Graphical Environment for Modeling Control Systems in Full Scope Training Simulators
This paper describes the development of a control
system model using a graphical software tool. This control system is
part of an operator training simulator developed for the National
Training Center for Operators of Ixtapantongo (CNCAOI, acronym
according to its name in Spanish language) of the Mexico-s Federal
Commission of Electricity, CFE). The Department of Simulation of
the Electrical Research Institute (IIE) developed this simulator using
as reference the Unit I of the Combined Cycle Power Plant El Sauz,
located at the centre of Mexico. The first step in the project was the
developing of the Gas Turbine System and its control system
simulator. The Turbo Gas simulator was finished and delivered to
CNCAOI in March 2007 for commercial operation. This simulator is
a high-fidelity real time dynamic simulator built and tested for
accurate operation over the entire load range. The simulator was used
primarily for operator training although it has been used for
procedure development and evaluation of plant transients.
[1] CFE, "Prontuario de la Central de Ciclo Combinado El Sauz", Gerencia
Regional de Producci├│n Central, Subdirecci├│n de Generaci├│n, México,
2000.
[2] International Atomic Energy Agency, "Selection, specification, design
and use of various nuclear power plant training simulators", IAEATECDOC-
995, 1998.
[3] Jiménez-Fraustro Luis A., "Desarrollo del Medio Ambiente de
Simulaci├│n para Simuladores Tiempo Real, basado en sistema operativo
Windows XP", Reporte Interno, Gerencia de Simulaci├│n, IIE, 2005.
[4] Yamamori, T., Ichikawa, T., Kawaguchi, S., Honma, H., "Recent
Technologies in Nuclear Power Plant Supervisory and Control
Systems", Hitachi Review, Vol. 49, No. 2, 2000, p61-65.
[5] Edgardo J. Roldan-Villasana and Yadira Mendoza-Alegria, "Simulation
Of a Power Gas Turbine System With A Generic Combustor Model",
2006 SCS, Summer Simulation Conf., Calgary, Canada, 2006.
[6] Victor Jiménez-Sanchez y Guillermo Romero-Jimenez. "Desarrollo del
Sistema de Control, Simulador Turbo-Gas", Proyecto. 13364, Gerencia
de Simulaci├│n, IIE, 2007.
[7] Romero G., "Revisi├│n Conjunta de PPAs", Reporte Interno, Gerencia de
Simulaci├│n, IIE, 2006.
[1] CFE, "Prontuario de la Central de Ciclo Combinado El Sauz", Gerencia
Regional de Producci├│n Central, Subdirecci├│n de Generaci├│n, México,
2000.
[2] International Atomic Energy Agency, "Selection, specification, design
and use of various nuclear power plant training simulators", IAEATECDOC-
995, 1998.
[3] Jiménez-Fraustro Luis A., "Desarrollo del Medio Ambiente de
Simulaci├│n para Simuladores Tiempo Real, basado en sistema operativo
Windows XP", Reporte Interno, Gerencia de Simulaci├│n, IIE, 2005.
[4] Yamamori, T., Ichikawa, T., Kawaguchi, S., Honma, H., "Recent
Technologies in Nuclear Power Plant Supervisory and Control
Systems", Hitachi Review, Vol. 49, No. 2, 2000, p61-65.
[5] Edgardo J. Roldan-Villasana and Yadira Mendoza-Alegria, "Simulation
Of a Power Gas Turbine System With A Generic Combustor Model",
2006 SCS, Summer Simulation Conf., Calgary, Canada, 2006.
[6] Victor Jiménez-Sanchez y Guillermo Romero-Jimenez. "Desarrollo del
Sistema de Control, Simulador Turbo-Gas", Proyecto. 13364, Gerencia
de Simulaci├│n, IIE, 2007.
[7] Romero G., "Revisi├│n Conjunta de PPAs", Reporte Interno, Gerencia de
Simulaci├│n, IIE, 2006.
@article{"International Journal of Electrical, Electronic and Communication Sciences:52977", author = "Guillermo Romero-Jiménez and Víctor Jiménez-Sánchez and Edgardo J. Roldán-Villasana", title = "Graphical Environment for Modeling Control Systems in Full Scope Training Simulators", abstract = "This paper describes the development of a control
system model using a graphical software tool. This control system is
part of an operator training simulator developed for the National
Training Center for Operators of Ixtapantongo (CNCAOI, acronym
according to its name in Spanish language) of the Mexico-s Federal
Commission of Electricity, CFE). The Department of Simulation of
the Electrical Research Institute (IIE) developed this simulator using
as reference the Unit I of the Combined Cycle Power Plant El Sauz,
located at the centre of Mexico. The first step in the project was the
developing of the Gas Turbine System and its control system
simulator. The Turbo Gas simulator was finished and delivered to
CNCAOI in March 2007 for commercial operation. This simulator is
a high-fidelity real time dynamic simulator built and tested for
accurate operation over the entire load range. The simulator was used
primarily for operator training although it has been used for
procedure development and evaluation of plant transients.", keywords = "Operators training, Power plant simulator,