Abstract: Value engineering is an efficacious contraption for
administrators to make up their minds. Value perusals proffer the
gaffers a suitable instrument to decrease the expenditures of the life
span, quality amelioration, structural improvement, curtailment of the
construction schedule, longevity prolongation or a merging of the
aforementioned cases. Subjecting organizers to pressures on one
hand and their accountability towards their pertinent fields together
with inherent risks and ambiguities of other options on the other hand
set some comptrollers in a dilemma utilization of risk management
and the value engineering in projects manipulation with regard to
complexities of implementing projects can be wielded as a
contraption to identify and efface each item which wreaks
unnecessary expenses and time squandering sans inflicting any
damages upon the essential project applications. Of course It should
be noted that implementation of risk management and value
engineering with regard to the betterment of efficiency and functions
may lead to the project implementation timing elongation. Here time
revamping does not refer to time diminishing in the whole cases. his
article deals with risk and value engineering conceptualizations at
first. The germane reverberations effectuated due to its execution in
Iran Khodro Corporation are regarded together with the joint features
and amalgamation of the aforesaid entia; hence the proposed
blueprint is submitted to be taken advantage of in engineering and
industrial projects including Iran Khodro Corporation.
Abstract: The construction of original functional sample of the portable device for fast analysis of energetic materials has been described in the paper. The portable device consisting of two parts – an original miniaturized microcolumn liquid chromatograph and a unique chemiluminescence detector – has been proposed and realized. In a very short time, this portable device is capable of identifying selectively most of military nitramine- and nitroesterbased explosives as well as inorganic nitrates occurring in trace concentrations in water or in soil. The total time required for the identification of extracts is shorter than 8 minutes.
Abstract: Service life of existing reinforced concrete (RC)
structures in coastal towns of Sabah has been affected very much.
Concrete crack, spalling of concrete cover and reinforcement rusting
of RC buildings are seen even within 5 years of construction in
Sabah. Hence, in this study a new mix design of concrete grout was
developed using locally available materials and investigated under
two curing conditions and workability, compressive strength,
Accelerated Mortar Bar Test (AMBT), water absorption, volume of
permeable voids (VPV), Sorptivity and 90-days salt ponding test
were conducted. The compressive strength of concrete grout at the
age 90 days was found to be 44.49 N/mm2 under water curing. It was
observed that the percentage of mortar bar length change was below
1% for developed concrete grout. The water absorption of the
concrete grout was in between the range of 0.88 % to 3.60 % under
two different curing up to the age 90 days. It was also observed that
the VPV of concrete was in the range of 0 % to 9.75 and 2.44% to
13.05% under water curing and site curing respectively. It was found
that the Sorptivity of the concrete grout under water curing at the age
of 28 days is 0.211mm/√min and at the age 90 day are 0.067
mm/√min. The chloride content decreased greatly, 90% after a depth
of 15 mm. It was noticed that the site cured samples showed higher
chloride contents near surface compared to water cured samples.
This investigation suggested that the developed mix design of
concrete grout using locally available construction materials can be
used for crack repairing of existing RC structures in Sabah.
Abstract: Lateral-torsional buckling (LTB) is one of the
phenomenae controlling the ultimate bending strength of steel Ibeams
carrying distributed loads on top flange. Built-up I-sections
are used as main beams and distributors. This study investigates the
ultimate bending strength of such beams with sections of different
classes including slender elements. The nominal strengths of the
selected beams are calculated for different unsupported lengths
according to the Provisions of the American Institute of Steel
Constructions (AISC-LRFD). These calculations are compared with
results of a nonlinear inelastic study using accurate FE model for this
type of loading. The goal is to investigate the performance of the
provisions for the selected sections. Continuous distributed load at
the top flange of the beams was applied at the FE model.
Imperfections of different values are implemented to the FE model to
examine their effect on the LTB of beams at failure, and hence, their
effect on the ultimate strength of beams. The study also introduces a
procedure for evaluating the performance of the provisions compared
with the accurate FEA results of the selected sections. A simplified
design procedure is given and recommendations for future code
updates are made.
Abstract: Let n be an integer. We show the existence of at least
three non-isomorphic non-commutative Latin squares of order n
which are embeddable in groups when n ≥ 5 is odd. By using a
similar construction for the case when n ≥ 4 is even, we show that
certain non-commutative Latin squares of order n are not embeddable
in groups.
Abstract: The study entitled “The Construction of Interactive
Computer Multimedia Instruction on Basic Japanese Vocabulary"
was aimed: 1) To construct the interactive computer multimedia
instruction on Basic Japanese Vocabulary, 2) To find out
multimedia-s quality, 3) To examine the student-s satisfaction and 4)
To study the learning achievement in Basic Japanese vocabulary. The
sampling group used in this study was composed of 40 1st year
student in Educational Communications and Technology Department,
Faculty of Industrial Education and Technology, King Mongkut-s
University of Technology Thonburi, in the academic year 2553 B.E.
(2010). According to research results, we found that 1). The quality
assessment by 3 mass media experts was at 4.72 on average or at high
level. 2) In terms of contents, the evaluation by 3 experts was at 4.81
on average or at high level. 3) In terms of achievement, there was a
statistical significance between before and after the treatment at the
.05 level. 4) The satisfaction of students towards the interactive
computer multimedia Instruction on “Basic Japanese Vocabulary"
was 4.35 on average, or at high level.
Abstract: In this paper, the construction of fast algorithms for the computation of Periodic Walsh Piecewise-Linear PWL transform and the Periodic Haar Piecewise-Linear PHL transform will be presented. Algorithms for the computation of the inverse transforms are also proposed. The matrix equation of the PWL and PHL transforms are introduced. Comparison of the computational requirements for the periodic piecewise-linear transforms and other orthogonal transforms shows that the periodic piecewise-linear transforms require less number of operations than some orthogonal transforms such as the Fourier, Walsh and the Discrete Cosine transforms.
Abstract: Buildings are one of the valuable assets to provide
people with shelters for work, leisure and rest. After years of
attacks by weather, buildings will deteriorate which need proper
maintenance in order to fulfill the requirements and satisfaction of
the users. Poorly managed buildings not just give a negative image
to the city itself, but also pose potential risk hazards to the health
and safety of the general public. As a result, the management of
maintenance projects has played an important role in cities like
Hong Kong where the problem of urban decay has drawn much
attention. However, most research has focused on managing new
construction, and little research effort has been put on maintenance
projects. Given the short duration and more diversified nature of
work, repair and maintenance works are found to be more difficult
to monitor and regulate when compared with new works. Project
participants may face with problems in running maintenance
projects which should be investigated so that proper strategies can
be established. This paper aims to provide a thorough analysis on
the problems of running maintenance projects. A review of
literature on the characteristics of building maintenance projects
was firstly conducted, which forms a solid basis for the empirical
study. Results on the problems and difficulties of running
maintenance projects from the viewpoints of industry practitioners
will also be delivered with a view to formulating effective
strategies for managing maintenance projects successfully.
Abstract: Although e-mail is the most efficient and popular communication method, unwanted and mass unsolicited e-mails, also called spam mail, endanger the existence of the mail system. This paper proposes a new algorithm called Dynamic Weighted Majority Concept Drift Detection (DWM-CDD) for content-based filtering. The design purposes of DWM-CDD are first to accurate the performance of the previously proposed algorithms, and second to speed up the time to construct the model. The results show that DWM-CDD can detect both sudden and gradual changes quickly and accurately. Moreover, the time needed for model construction is less than previously proposed algorithms.
Abstract: Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few number of researches. The selection strategy is not perfect and considered as the reason behind irresponsible contractors. As a response, this research was conducted to review the contractor selection strategies as an integral part of a long advanced research to develop a good selection model. Many techniques can be used to form a selection strategy; multi criteria for optimizing decision, prequalification to discover contractor-s responsibility, bidding process for competition, third party guarantee to enhance the selection, and fuzzy techniques for ambiguities and incomplete information.
Abstract: This article presents a computationally tractable probabilistic model for the relation between the complex wavelet coefficients of two images of the same scene. The two images are acquisitioned at distinct moments of times, or from distinct viewpoints, or by distinct sensors. By means of the introduced probabilistic model, we argue that the similarity between the two images is controlled not by the values of the wavelet coefficients, which can be altered by many factors, but by the nature of the wavelet coefficients, that we model with the help of hidden state variables. We integrate this probabilistic framework in the construction of a new image registration algorithm. This algorithm has sub-pixel accuracy and is robust to noise and to other variations like local illumination changes. We present the performance of our algorithm on various image types.
Abstract: An appropriate project delivery system (PDS) is crucial
to the success of a construction projects. Case-based Reasoning (CBR)
is a useful support for PDS selection. However, the traditional CBR
approach represents cases as attribute-value vectors without taking
relations among attributes into consideration, and could not calculate
the similarity when the structures of cases are not strictly same.
Therefore, this paper solves this problem by adopting the Relational
Case-based Reasoning (RCBR) approach for PDS selection,
considering both the structural similarity and feature similarity. To
develop the feature terms of the construction projects, the criteria and
factors governing PDS selection process are first identified. Then
feature terms for the construction projects are developed. Finally, the
mechanism of similarity calculation and a case study indicate how
RCBR works for PDS selection. The adoption of RCBR in PDS
selection expands the scope of application of traditional CBR method
and improves the accuracy of the PDS selection system.
Abstract: Carbon steel is used in boilers, pressure vessels, heat
exchangers, piping, structural elements and other moderatetemperature
service systems in which good strength and ductility are
desired. ASME Boiler and Pressure Vessel Code, Section II Part A
(2004) provides specifications of ferrous materials for construction of
pressure equipment, covering wide range of mechanical properties
including high strength materials for power plants application.
However, increased level of springback is one of the major problems
in fabricating components of high strength steel using bending.
Presented work discuss the springback simulations for five different
steels (i.e. SA-36, SA-299, SA-515 grade 70, SA-612 and SA-724
grade B) using finite element analysis of air V-bending. Analytical
springback simulations of hypothetical layered materials are
presented. Result shows that; (i) combination of the material property
parameters controls the springback, (ii) layer of the high ductility
steel on the high strength steel greatly suppresses the springback.
Abstract: Due to its geographical location, Iran is considered one of the earthquake-prone areas where the best way to decrease earthquake effects is supposed to be strengthening the buildings. Even though, one idea suggests that the use of adobe in constructing buildings be prohibited for its weak function especially in earthquake-prone areas, however, regarding ecological considerations, sustainability and other local skills, another idea pays special attention to adobe as one of the construction technologies which is popular among people. From the architectural and technological point of view, as strong sustainable building construction materials, compressed adobe construction materials make most of the construction in urban or rural areas ranging from small to big industrial buildings used to replace common earth blocks in traditional systems and strengthen traditional adobe buildings especially against earthquake. Mentioning efficient construction using compressed adobe system as a reliable replacement for traditional soil construction materials , this article focuses on the experiences of India in the fields of sustainable development of compressed adobe systems in the form of system in which the compressed soil is combined with cement, load bearing building with brick/solid concrete block system, brick system using rat trap bond, metal system with adobe infill and finally emphasizes on the use of these systems in the earthquake-struck city of Bam in Iran.
Abstract: In this paper we are to find the optimum multiwavelet for compression of electrocardiogram (ECG) signals and then, selecting it for using with SPIHT codec. At present, it is not well known which multiwavelet is the best choice for optimum compression of ECG. In this work, we examine different multiwavelets on 24 sets of ECG data with entirely different characteristics, selected from MIT-BIH database. For assessing the functionality of the different multiwavelets in compressing ECG signals, in addition to known factors such as Compression Ratio (CR), Percent Root Difference (PRD), Distortion (D), Root Mean Square Error (RMSE) in compression literature, we also employed the Cross Correlation (CC) criterion for studying the morphological relations between the reconstructed and the original ECG signal and Signal to reconstruction Noise Ratio (SNR). The simulation results show that the Cardinal Balanced Multiwavelet (cardbal2) by the means of identity (Id) prefiltering method to be the best effective transformation. After finding the most efficient multiwavelet, we apply SPIHT coding algorithm on the transformed signal by this multiwavelet.
Abstract: Earthmoving operations are a major part of many
construction projects. Because of the complexity and fast-changing
environment of such operations, the planning and estimating are
crucial on both planning and operational levels. This paper presents
the framework ofa microscopic discrete-event simulation system for
modeling earthmoving operations and conducting productivity
estimations on an operational level.A prototype has been developed
to demonstrate the applicability of the proposed framework, and this
simulation system is presented via a case study based on an actual
earthmoving project. The case study shows that the proposed
simulation model is capable of evaluating alternative operating
strategies and resource utilization at a very detailed level.
Abstract: Improving performance measures in the construction
processes has been a major concern for managers and decision
makers in the industry. They seek for ways to recognize the key
factors which have the largest effect on the process. Identifying such
factors can guide them to focus on the right parts of the process in
order to gain the best possible result. In the present study design of
experiment (DOE) has been applied to a computer simulation model
of brick laying process to determine significant factors while
productivity has been chosen as the response of the experiment. To
this end, four controllable factors and their interaction have been
experimented and the best factor level has been calculated for each
one. The results indicate that three factors, namely, labor of brick,
labor of mortar and inter arrival time of mortar along with interaction
of labor of brick and labor of mortar are significant.
Abstract: Human amniotic membrane (HAM) is a useful
biological material for the reconstruction of damaged ocular surface.
The processing and preservation of HAM is critical to prevent the
patients undergoing amniotic membrane transplant (AMT) from cross
infections. For HAM preparation human placenta is obtained after an
elective cesarean delivery. Before collection, the donor is screened
for seronegativity of HCV, Hbs Ag, HIV and Syphilis. After
collection, placenta is washed in balanced salt solution (BSS) in
sterile environment. Amniotic membrane is then separated from the
placenta as well as chorion while keeping the preparation in BSS.
Scrapping of HAM is then carried out manually until all the debris is
removed and clear transparent membrane is acquired. Nitrocellulose
membrane filters are then placed on the stromal side of HAM, cut
around the edges with little membrane folded towards other side
making it easy to separate during surgery. HAM is finally stored in
solution of glycerine and Dulbecco-s Modified Eagle Medium
(DMEM) in 1:1 ratio containing antibiotics. The capped borosil vials
containing HAM are kept at -80°C until use. This vial is thawed to
room temperature and opened under sterile operation theatre
conditions at the time of surgery.
Abstract: Optical Coherence Tomography (OCT) combined
with the Confocal Microscopy, as a noninvasive method, permits the
determinations of materials defects in the ceramic layers depth. For
this study 256 anterior and posterior metal and integral ceramic fixed
partial dentures were used, made with Empress (Ivoclar), Wollceram
and CAD/CAM (Wieland) technology. For each investigate area 350
slices were obtain and a 3D reconstruction was perform from each
stuck. The Optical Coherent Tomography, as a noninvasive method,
can be used as a control technique in integral ceramic technology,
before placing those fixed partial dentures in the oral cavity. The
purpose of this study is to evaluate the capability of En face Optical
Coherence Tomography (OCT) combined with a fluorescent method
in detection and analysis of possible material defects in metalceramic
and integral ceramic fixed partial dentures. As a conclusion,
it is important to have a non invasive method to investigate fixed
partial prostheses before their insertion in the oral cavity in order to
satisfy the high stress requirements and the esthetic function.
Abstract: In Lebanon, public construction projects are awarded
to the contractor submitting the lowest bid price based on a
competitive bidding process. The contractor has to make a strategic
decision in choosing the appropriate bid price that will offer a
satisfactory profit with a greater probability to win. A simulation
model for bid price decision making based on the lowest bid price
evaluation is developed. The model, built using Crystal Ball decisionengineering
software, considers two main factors affecting the
bidding process: the number of qualified bidders and the size of the
project. The validity of the model is tested on twelve separate
projects. The study also shows how to use the model to conduct risk
analysis and help any specific contractor to decide on his bid price
with associated certainty level in a scientific method.