Abstract: Energy consumption is one of the indices in
determining the levels of development of a nation. Therefore,
availability of energy supply to all sectors of life in any country is
crucial for its development. These exists shortage of all kinds of
energy, particularly electricity which is badly needed for economic
development. Electricity from the sun which is quite abundant in
most of the developing countries is used in rural areas to meet basic
electricity needs of a rural community. Today-s electricity supply in
Myanmar is generated by fuel generators and hydroelectric power
plants. However, far-flung areas which are away from National Grids
cannot enjoy the electricity generated by these sources. Since
Myanmar is a land of plentiful sunshine, especially in central and
southern regions of the country, the first form of energy- solar energy
could hopefully become the final solution to its energy supply
problem. The direct conversion of solar energy into electricity using
photovoltaic system has been receiving intensive installation not only
in developed countries but also in developing countries. It is mainly
intended to present solar energy potential and application in
Myanmar. It is also wanted to get the benefits of using solar energy
for people in remote areas which are not yet connected to the national
grids because of the high price of fossil fuel.
Abstract: Over recent years, the number of building integrated photovoltaic (BIPV) installations for home systems have been increasing in Malaysia. The paper concerns an analysis - as part of current Research and Development (R&D) efforts - to integrate photovoltaics as an architectural feature of a detached house in the new satellite township of Putrajaya, Malaysia. The analysis was undertaken using calculation and simulation tools to optimize performance of BIPV home system. In this study, a the simulation analysis was undertaken for selected bungalow units based on a long term recorded weather data for city of Kuala Lumpur. The simulation and calculation was done with consideration of a PV panels' tilt and direction, shading effect and economical considerations. A simulation of the performance of a grid connected BIPV house in Kuala Lumpur was undertaken. This case study uses a 60 PV modules with power output of 2.7 kW giving an average of PV electricity output is 255 kWh/month..
Abstract: Sediment loads transfer in hydraulic installations and their consequences for the O&M of modern canal systems is emerging as one of the most important considerations in hydraulic engineering projects apriticularly those which are inteded to feed the irrigation and draiange schemes of large command areas such as the Dez and Mogahn in Iran.. The aim of this paper is to investigate the applicability of the vortex tube as a viable means of extracting sediment loads entering the canal systems in general and the water inatke structures in particulars. The Western conveyance canal of the Dez Diversion weir which feeds the Karkheh Flood Plain in Sothwestern Dezful has been used as the case study using the data from the Dastmashan Hydrometric Station. The SHARC software has been used as an analytical framework to interprete the data. Results show that given the grain size D50 and the canal turbulence the adaption length from the beginning of the canal and after the diversion dam is estimated at 477 m, a point which is suitable for laying the vortex tube.
Abstract: In the micro and nano-technology industry, the
«clean-rooms» dedicated to manufacturing chip, are equipped with
the most sophisticated equipment-tools. There use a large number of
resources in according to strict specifications for an optimum
working and result. The distribution of «utilities» to the production is
assured by teams who use a supervision tool.
The studies show the interest to control the various parameters of
production or/and distribution, in real time, through a reliable and
effective supervision tool. This document looks at a large part of the
functions that the supervisor must assure, with complementary
functionalities to help the diagnosis and simulation that prove very
useful in our case where the supervised installations are complexed
and in constant evolution.
Abstract: Reliability Centered Maintenance(RCM) is one of
most widely used methods in the modern power system to schedule a
maintenance cycle and determine the priority of inspection. In order
to apply the RCM method to the Smart Grid, a precedence study for
the new structure of rearranged system should be performed due to
introduction of additional installation such as renewable and
sustainable energy resources, energy storage devices and advanced
metering infrastructure. This paper proposes a new method to
evaluate the priority of maintenance and inspection of the power
system facilities in the Smart Grid using the Risk Priority Number. In
order to calculate that risk index, it is required that the reliability
block diagram should be analyzed for the Smart Grid system. Finally,
the feasible technical method is discussed to estimate the risk
potential as part of the RCM procedure.
Abstract: In this article the investigation about installation heat
recovery steam generation (HRSG) on the exhaust of turbo generators of phases 2&3 at South Pars Gas Complex is presented.
The temperature of exhaust gas is approximately 665 degree centigrade, Installation of heat recovery boiler was simulated in
ThermoFlow 17.0.2 software, based on test operation data and the
equipments site operation conditions in Pars exclusive economical energy area, the affect of installation HRSG package on the available
gas turbine and its operation parameters, ambient temperature, the
exhaust temperatures steam flow rate were investigated. Base on the results recommended HRSG package should have the capacity for 98
ton per hour high pressure steam generation this refinery, by use of
exhaust of three gas turbines for each package in operation condition of each refinery at 30 degree centigrade. Besides saving energy this
project will be an Environment-Friendly project. The Payback Period
is estimated approximately 1.8 year, with considering Clean Development Mechanism.
Abstract: This paper presents a pulse doubling technique in a 12-pulse ac-dc converter which supplies direct torque controlled motor drives (DTCIMD-s) in order to have better power quality conditions at the point of common coupling. The proposed technique increases the number of rectification pulses without significant changes in the installations and yields in harmonic reduction in both ac and dc sides. The 12-pulse rectified output voltage is accomplished via two paralleled six-pulse ac-dc converters each of them consisting of three-phase diode bridge rectifier. An autotransformer is designed to supply the rectifiers. The design procedure of magnetics is in a way such that makes it suitable for retrofit applications where a six-pulse diode bridge rectifier is being utilized. Independent operation of paralleled diode-bridge rectifiers, i.e. dc-ripple re-injection methodology, requires a Zero Sequence Blocking Transformer (ZSBT). Finally, a tapped interphase reactor is connected at the output of ZSBT to double the pulse numbers of output voltage up to 24 pulses. The aforementioned structure improves power quality criteria at ac mains and makes them consistent with the IEEE-519 standard requirements for varying loads. Furthermore, near unity power factor is obtained for a wide range of DTCIMD operation. A comparison is made between 6- pulse, 12-pulse, and proposed converters from view point of power quality indices. Results show that input current total harmonic distortion (THD) is less than 5% for the proposed topology at various loads.
Abstract: There are many expand of Wi-Fi zones provided
mobile careers and usage of wireless access point at home as increase
of usage of wireless internet caused by the use of smart phone. This
paper shows wireless local area network status, security threats of
WLAN and functionality of major wireless access point in Korea. We
propose security countermeasures concerned with life cycle of access
point from manufacturing to installation, using and finally disposal.
There needed to releasing with configured secure at access point.
Because, it is most cost effective resolution than stage of installation or
other life cycle of access point.
Abstract: Endovascular aneurysm repair is a new and minimally invasive repair for patients with abdominal aortic aneurysm (AAA). This method has potential advantages that are incomparable with other repair methods. However, the enlargement of aneurysm in the absence of endoleak, which is known as endotension, may occur as one of post-operative compliances of this method. Typically, endotension is mainly as a result of pressure transmitted to aneurysm sac by endovascular installed graft. After installation of graft the aneurysm sac reduces significantly but remains non-zero. There are some factors which affect this pressure transmitted. In this study, the geometry features of installed vascular graft have been considered. It is inferred that graft neck angle and iliac bifurcation angle are two factors which can affect the drag force on graft and consequently the pressure transmitted to aneurysm.
Abstract: These Nowadays the explosion of bombs or explosive
materials such as gas and oil near or inside the buildings cause some
losses in installations and building components. This has made the
engineers to make the buildings and their components resistance
against the effects of explosion. These activities lead to provide
regulations and different methods. The above regulations are mostly
focused on the explosion effects resulting from the vehicles around
the buildings. Therefore, the explosion resulting from the vehicles
outside the buildings will be studied in this research.
In the present study, the main goals are to investigate the
explosion load effects on the structures located on the piles with the
specific quantity of plasticity and observing the permissible response
of these structures. The concentrated mass system and the spring with
two degree of freedom will be used to study the structural system.
Abstract: This paper proposes a new methodology for the
optimal allocation and sizing of Embedded Generation (EG)
employing Real Coded Genetic Algorithm (RCGA) to minimize the
total power losses and to improve voltage profiles in the radial
distribution networks. RCGA is a method that uses continuous
floating numbers as representation which is different from
conventional binary numbers. The RCGA is used as solution tool,
which can determine the optimal location and size of EG in radial
system simultaneously. This method is developed in MATLAB. The
effect of EG units- installation and their sizing to the distribution
networks are demonstrated using 24 bus system.
Abstract: The great majority of the electric installations belong
to the first and second category. In order to ensure a high level of
reliability of their electric system feeder, two power supply sources
are envisaged, one principal, the other of reserve, generally a cold
reserve (electric diesel group).
The principal source being under operation, its control can be ideal
and sure, however for the reserve source being in stop, a preventive
maintenance-s which proceeds on time intervals (periodicity) and
for well defined lengths of time are envisaged, so that this source will
always available in case of the principal source failure.
The choice of the periodicity of preventive maintenance of the
source of reserve influences directly the reliability of the electric
feeder system. On the basis of the semi-markovians processes, the
influence of the periodicity of the preventive maintenance of the
source of reserve is studied and is given the optimal periodicity.
Abstract: The seismic rehabilitation designs of two reinforced
concrete school buildings, representative of a wide stock of similar
edifices designed under earlier editions of the Italian Technical
Standards, are presented in this paper. The mutual retrofit solution
elaborated for the two buildings consists in the incorporation of a
dissipative bracing system including pressurized fluid viscous springdampers
as passive protective devices. The mechanical parameters,
layouts and locations selected for the constituting elements of the
system; the architectural renovation projects developed to properly
incorporate the structural interventions and improve the appearance
of the buildings; highlights of the installation works already
completed in one of the two structures; and a synthesis of the
performance assessment analyses carried out in original and
rehabilitated conditions, are illustrated. The results of the analyses
show a remarkable enhancement of the seismic response capacities of
both structures. This allows reaching the high performance objectives
postulated in the retrofit designs with much lower costs and
architectural intrusion as compared to traditional rehabilitation
interventions designed for the same objectives.
Abstract: This paper aims to select the optimal location and
setting parameters of TCSC (Thyristor Controlled Series
Compensator) controller using Particle Swarm Optimization (PSO)
and Genetic Algorithm (GA) to mitigate small signal oscillations in a
multimachine power system. Though Power System Stabilizers
(PSSs) are prime choice in this issue, installation of FACTS device
has been suggested here in order to achieve appreciable damping of
system oscillations. However, performance of any FACTS devices
highly depends upon its parameters and suitable location in the
power network. In this paper PSO as well as GA based techniques are
used separately and compared their performances to investigate this
problem. The results of small signal stability analysis have been
represented employing eigenvalue as well as time domain response in
face of two common power system disturbances e.g., varying load
and transmission line outage. It has been revealed that the PSO based
TCSC controller is more effective than GA based controller even
during critical loading condition.
Abstract: The purpose of this research is to develop and apply the
RSCMAC to enhance the dynamic accuracy of Global Positioning
System (GPS). GPS devices provide services of accurate positioning,
speed detection and highly precise time standard for over 98% area on
the earth. The overall operation of Global Positioning System includes
24 GPS satellites in space; signal transmission that includes 2
frequency carrier waves (Link 1 and Link 2) and 2 sets random
telegraphic codes (C/A code and P code), on-earth monitoring stations
or client GPS receivers. Only 4 satellites utilization, the client position
and its elevation can be detected rapidly. The more receivable
satellites, the more accurate position can be decoded. Currently, the
standard positioning accuracy of the simplified GPS receiver is greatly
increased, but due to affected by the error of satellite clock, the
troposphere delay and the ionosphere delay, current measurement
accuracy is in the level of 5~15m. In increasing the dynamic GPS
positioning accuracy, most researchers mainly use inertial navigation
system (INS) and installation of other sensors or maps for the
assistance. This research utilizes the RSCMAC advantages of fast
learning, learning convergence assurance, solving capability of
time-related dynamic system problems with the static positioning
calibration structure to improve and increase the GPS dynamic
accuracy. The increasing of GPS dynamic positioning accuracy can be
achieved by using RSCMAC system with GPS receivers collecting
dynamic error data for the error prediction and follows by using the
predicted error to correct the GPS dynamic positioning data. The
ultimate purpose of this research is to improve the dynamic positioning
error of cheap GPS receivers and the economic benefits will be
enhanced while the accuracy is increased.
Abstract: The heavy metal contamination of the technogenous
sediments and soils at the investigated dump-field show irregular
planar distribution. Also the heavy metal content in the surface water,
drainage water and in the groundwater was studied both in the dry as
well as during the rainy periods. The cementation process causes
substitution of iron by copper. Natural installation and development
of plant species was observed at the old mine waste dumps, specific
to the local chemical conditions such as low content of essential
nutrients and high content of heavy metals. The individual parts of
the plant tissues (roots, branches/stems, leaves/needles, flowers/
fruits) are contaminated by heavy metals and tissues are damaged
differently, respectively.
Abstract: Scarcity of water resources and huge costs of
establishing new hydraulic installations necessitate optimal
exploitation from existing reservoirs. Sustainable management and
efficient exploitation from existing finite water resources are
important factors in water resource management, particularly in the
periods of water insufficiency and in dry regions, and on account of
competitive allocations in the view of exploitation management. This
study aims to minimize reservoir water release from a determined
rate of demand. A numerical model for water optimal exploitation
has been developed using GAMS introduced by the World Bank and
applied to the case of Meijaran dam, northern Iran. The results
indicate that this model can optimize the function of reservoir
exploitation while required water for lower parts of the region will be
supplied. Further, allocating optimal water from reservoir, the
optimal rate of water allocated to any group of the users were
specified to increase benefits in curve dam exploitation.
Abstract: This paper was to study the clothes dryer using waste
heat from a split type air conditioner with a capacity of 12,648 btu/h.
The drying chamber had a minimum cross section area with the size
of 0.5 x 1.0 m2. The chamber was constructed by sailcloth and was
inside folded with aluminium foil. Then, it was connected to the
condensing unit of an air conditioner. The experiment was carried out
in two aspects which were the clothes drying with and without
auxiliary fan unit. The results showed that the drying rate of clothes
in the chamber installed with and without auxiliary fan unit were
2.26 and 1.1 kg/h, respectively. In case of the chamber installed with
a auxiliary fan unit, the additional power of 0.011 kWh was
consumed and the drying rate was higher than that of clothes drying
without auxiliary fan unit. Without auxiliary fan unit installation, no
energy was required but there was a portion of hot air leaks away
through the punctured holes at the wall of the drying chamber, hence
the drying rate was dropped below. The drying rate of clothes drying
using waste heat was higher than natural indoor drying and
commercial dryer which their drying rate were 0.17 and 1.9 kg/h,
respectively. It was noted that the COP of the air conditioner did not
change during the operating of clothes drying.
Abstract: Most buildings have been using anchor bolts
commonly for installing outdoor advertising structures. Anchor bolts
of common carbon steel are widely used and often installed
indiscriminately by inadequate installation standards. In the area
where strong winds frequently blow, falling accidents of outdoor
advertising structures can occur and cause a serious disaster, which is
very dangerous and to be prevented. In this regard, the development of
high-performance anchor bolts is urgently required. In the present
study, 25Cr-8Ni-1.5Si-1Mn-0.4C alloy was produced by traditional
vacuum induction melting (VIM) for the application of anchor bolt.
The alloy composition is revealed as a duplex microstructure from
thermodynamic phase analysis by FactSage® and confirmed by
metallographic experiment. Addition of Nitrogen to the alloy was
found to reduce the ferritic phase domain and significantly increase the
hardness and the tensile strength. Microstructure observation revealed
mixed structure of austenite and ferrite with fine carbide distributed
along the grain and phase boundaries.
Abstract: The building sector is the largest energy consumer and
CO2 emitter in the European Union (EU) and therefore the active
reduction of energy consumption and elimination of energy wastage
are among the main goals in it. Healthy housing and energy
efficiency are affected by many factors which set challenges to
monitoring, control and research of indoor air quality (IAQ) and
energy consumption, especially in old buildings. These challenges
include measurement and equipment costs, for example.
Additionally, the measurement results are difficult to interpret and
their usage in the ventilation control is also limited when taking into
account the energy efficiency of housing at the same time. The main
goal of this study is to develop a cost-effective building monitoring
and control system especially for old buildings. The starting point or
keyword of the development process is a wireless system; otherwise
the installation costs become too high. As the main result, this paper
describes an idea of a wireless building monitoring and control
system. The first prototype of the system has been installed in 10
residential buildings and in 10 school buildings located in the City of
Kuopio, Finland.