Abstract: Shortening of natural resources will impose greater
limitations of electric energy consumption in various fields including
water treatment technologies. Small water treatment installations
supplied with electric energy from solar sources are perfect example of
zero-emission technology. Possibility of solar energy application, as
one of the alternative energy resources for decontamination processes
is strongly dependent on geographical location. Various examples of
solar driven water purification systems are given and design of
solar-water treatment installation based on ozone for the geographical
conditions in Poland are presented.
Abstract: A solar refrigeration system based on the adsorptiondesorption
phenomena is designed and analyzed. An annular tubular
generator filled with silica gel adsorbent and with a perforated inner
cylinder is integrated within a flat solar collector. The working fluid
in the refrigeration cycle is water. The thermodynamic analysis and
because of the temperature level that could be attained with a flat
solar collector it is required that the system operates under vacuum
conditions. In order to enhance the performance of the system and to
get uniform temperature in the silica gel and higher desorbed mass,
an apparatus for rotation of the generator is incorporated in the
system. Testing is carried out and measurements are taken on the
designed installation. The effect of rotation is checked on the
temperature distribution and on the performance of this machine and
compared to the flat solar collector with fixed generator.
Abstract: Internet is without any doubt the fastest and effective mean of communication making it possible to reach a great number of people in the world. It draws its base from exchange points. Indeed exchange points are used to inter-connect various Internet suppliers and operators in order to allow them to exchange traffic and it is with these interconnections that Internet made its great strides. They thus make it possible to limit the traffic delivered via the operators of transits. This limitation allows a significant improvement of the quality of service, a reduction in the latency time just as a reduction of the cost of connection for the final subscriber. Through this article we will show how the installation of an IXP allows an improvement and a diversification of the services just as a reduction of the Internet connection costs.
Abstract: This paper presents two simplified models to
determine nodal voltages in power distribution networks. These
models allow estimating the impact of the installation of reactive
power compensations equipments like fixed or switched capacitor
banks. The procedure used to develop the models is similar to the
procedure used to develop linear power flow models of transmission
lines, which have been widely used in optimization problems of
operation planning and system expansion. The steady state non-linear
load flow equations are approximated by linear equations relating the
voltage amplitude and currents. The approximations of the linear
equations are based on the high relationship between line resistance
and line reactance (ratio R/X), which is valid for power distribution
networks. The performance and accuracy of the models are evaluated
through comparisons with the exact results obtained from the
solution of the load flow using two test networks: a hypothetical
network with 23 nodes and a real network with 217 nodes.
Abstract: Since the European renewable energy directives set the
target for 22.1% of electricity generation to be supplied by 2010
[1], there has been increased interest in using green technologies
also within the urban enviroment. The most commonly considered
installations are solar thermal and solar photovoltaics. Nevertheless,
as observed by Bahaj et al. [2], small scale turbines can reduce the
built enviroment related CO2 emissions. Thus, in the last few years,
an increasing number of manufacturers have developed small wind
turbines specifically designed for the built enviroment. The present
work focuses on the integration into architectural systems of such
installations and presents a survey of successful case studies.
Abstract: Wind farms (WFs) with high level of penetration are
being established in power systems worldwide more rapidly than
other renewable resources. The Independent System Operator (ISO),
as a policy maker, should propose appropriate places for WF
installation in order to maximize the benefits for the investors. There
is also a possibility of congestion relief using the new installation of
WFs which should be taken into account by the ISO when proposing
the locations for WF installation. In this context, efficient wind farm
(WF) placement method is proposed in order to reduce burdens on
congested lines. Since the wind speed is a random variable and load
forecasts also contain uncertainties, probabilistic approaches are used
for this type of study. AC probabilistic optimal power flow (P-OPF)
is formulated and solved using Monte Carlo Simulations (MCS). In
order to reduce computation time, point estimate methods (PEM) are
introduced as efficient alternative for time-demanding MCS.
Subsequently, WF optimal placement is determined using generation
shift distribution factors (GSDF) considering a new parameter
entitled, wind availability factor (WAF). In order to obtain more
realistic results, N-1 contingency analysis is employed to find the
optimal size of WF, by means of line outage distribution factors
(LODF). The IEEE 30-bus test system is used to show and compare
the accuracy of proposed methodology.
Abstract: This work presents a new algorithm based on a combination of fuzzy (FUZ), Dynamic Programming (DP), and Genetic Algorithm (GA) approach for capacitor allocation in distribution feeders. The problem formulation considers two distinct objectives related to total cost of power loss and total cost of capacitors including the purchase and installation costs. The novel formulation is a multi-objective and non-differentiable optimization problem. The proposed method of this article uses fuzzy reasoning for sitting of capacitors in radial distribution feeders, DP for sizing and finally GA for finding the optimum shape of membership functions which are used in fuzzy reasoning stage. The proposed method has been implemented in a software package and its effectiveness has been verified through a 9-bus radial distribution feeder for the sake of conclusions supports. A comparison has been done among the proposed method of this paper and similar methods in other research works that shows the effectiveness of the proposed method of this paper for solving optimum capacitor planning problem.
Abstract: The combustion of liquid fuel in the porous burner
(PB) was experimented to investigate evaporation mechanism and
combustion behavior. The diesel oil was used as fuel and the pebbles
carefully chosen in the same size like the solid sphere homogeneously
was adopted as the porous media. Two structures of the liquid porous
burner, i.e. the PB without and with installation of porous emitter
(PE), were performed. PE was installed by lower than PB with
distance of 20 cm. The pebbles having porosity (φ) of 0.45 and 0.52
were, respectively, used in PB and PE. The fuel was supplied dropwise
from the top through the PB and the combustion was occurred between
PB and PE. Axial profiles of temperature along the burner length were
measured to clarify the evaporation and combustion phenomena. The
pollutant emission characteristics were monitored at the burner exit.
From the experiment, it was found that the temperature profiles of both
structures decreased with the three ways swirling air flows (QA)
increasing. On the other hand, the temperature profiles increased with
fuel heat input (QF). Obviously, the profile of the porous burner
installed with PE was higher than that of the porous burner without
PE
Abstract: This paper proposes an investment cost recovery
based efficient and fast sequential optimization approach to optimal
allocation of thyristor controlled series compensator (TCSC) in
competitive power market. The optimization technique has been used
with an objective to maximizing the social welfare and minimizing
the device installation cost by suitable location and rating of TCSC in
the system. The effectiveness of proposed approach for location of
TCSC has been compared with some existing methods of TCSC
placement, in terms of its impact on social welfare, TCSC investment
recovery and optimal generation as well as load patterns. The results
have been obtained on modified IEEE 14-bus system.
Abstract: In this paper the development of a heat exchanger as a
pilot plant for educational purpose is discussed and the use of neural
network for controlling the process is being presented. The aim of the
study is to highlight the need of a specific Pseudo Random Binary
Sequence (PRBS) to excite a process under control. As the neural
network is a data driven technique, the method for data generation
plays an important role. In light of this a careful experimentation
procedure for data generation was crucial task. Heat exchange is a
complex process, which has a capacity and a time lag as process
elements. The proposed system is a typical pipe-in- pipe type heat
exchanger. The complexity of the system demands careful selection,
proper installation and commissioning. The temperature, flow, and
pressure sensors play a vital role in the control performance. The
final control element used is a pneumatically operated control valve.
While carrying out the experimentation on heat exchanger a welldrafted
procedure is followed giving utmost attention towards safety
of the system. The results obtained are encouraging and revealing
the fact that if the process details are known completely as far as
process parameters are concerned and utilities are well stabilized then
feedback systems are suitable, whereas neural network control
paradigm is useful for the processes with nonlinearity and less
knowledge about process. The implementation of NN control
reinforces the concepts of process control and NN control paradigm.
The result also underlined the importance of excitation signal
typically for that process. Data acquisition, processing, and
presentation in a typical format are the most important parameters
while validating the results.
Abstract: The Platform Screen Doors improve Indoor Air Quality
(IAQ) in the subway station; however, and the air quality is degraded
in the subway tunnel. CO2 concentration and indoor particulate matter
value are high in the tunnel. The IAQ level in subway tunnel degrades
by increasing the train movements. Air-curtain installation reduces
dusts, particles and moving toxic smokes and permits traffic by
generating virtual wall. The ventilation systems of the subway tunnel
need improvements to have better air-quality. Numerical analyses
might be effective tools analyze the flowfield inside the air-curtain
installed subway tunnel. The ANSYS CFX software is used for steady
computations of the airflow inside the tunnel. The single-track subway
tunnel has the natural shaft, the mechanical shaft, and the PSDs
installed stations. The height and width of the tunnel are 6.0 m and 4.0
m respectively. The tunnel is 400 m long and the air-curtain is installed
at the top of the tunnel. The thickness and the width of the air-curtain
are 0.08 m and 4 m respectively. The velocity of the air-curtain
changes between 20 - 30 m/s. Three cases are analyzed depending on
the installing location of the air-curtain. The discharged-air through
the natural shafts increases as the velocity of the air-curtain increases
when the air-curtain is installed between the mechanical and the
natural shafts. The pollutant-air is exhausted by the mechanical and the
natural shafts and remained air is pushed toward tunnel end. The
discharged-air through the natural shaft is low when the air-curtain
installed before the natural shaft. The mass flow rate decreases in the
tunnel after the mechanical shaft as the air-curtain velocity increases.
The computational results of the air-curtain installed tunnel become
basis for the optimum design study. The air-curtain installing location
is chosen between the mechanical and the natural shafts. The velocity
of the air-curtain is fixed as 25 m/s. The thickness and the blowing
angles of the air-curtain are the design variables for the optimum
design study. The object function of the design optimization is
maximizing the discharged air through the natural shaft.
Abstract: This paper undertakes the problem of optimal
capacitor placement in a distribution system. The problem is how to
optimally determine the locations to install capacitors, the types and
sizes of capacitors to he installed and, during each load level,the
control settings of these capacitors in order that a desired objective
function is minimized while the load constraints,network constraints
and operational constraints (e.g. voltage profile) at different load
levels are satisfied. The problem is formulated as a combinatorial
optimization problem with a nondifferentiable objective function.
Four solution mythologies based on algorithms (GA),tabu search
(TS), and hybrid GA-SA algorithms are presented.The solution
methodologies are preceded by a sensitivity analysis to select the
candidate capacitor installation locations.
Abstract: Interactive public displays give access as an
innovative media to promote enhanced communication between
people and information. However, digital public displays are subject
to a few constraints, such as content presentation. Content
presentation needs to be developed to be more interesting to attract
people’s attention and motivate people to interact with the display. In
this paper, we proposed idea to implement contents with interaction
elements for vision-based digital public display. Vision-based
techniques are applied as a sensor to detect passers-by and theme
contents are suggested to attract their attention for encouraging them
to interact with the announcement content. Virtual object, gesture
detection and projection installation are applied for attracting
attention from passers-by. Preliminary study showed positive
feedback of interactive content designing towards the public display.
This new trend would be a valuable innovation as delivery of
announcement content and information communication through this
media is proven to be more engaging.
Abstract: This paper presents a methodology for operational and
economic characteristics based evaluation and selection of a power
plant using Graph theoretic approach. A universal evaluation index
on the basis of Operational and economics characteristics of a plant is
proposed which evaluates and ranks the various types of power plants.
The index thus obtained from the pool of operational characteristics
of the power plant attributes Digraph. The Digraph is developed
considering Operational and economics attributes of the power plants
and their relative importance for their smooth operation, installation
and commissioning and prioritizing their selection. The sensitivity
analysis of the attributes towards the objective has also been carried
out in order to study the impact of attributes over the desired outcome
i.e. the universal operational-economics index of the power plant.
Abstract: This paper describes a methodology for remote
performance monitoring of retail refrigeration systems. The proposed
framework starts with monitoring of the whole refrigeration circuit
which allows detecting deviations from expected behavior caused by
various faults and degradations. The subsequent diagnostics methods
drill down deeper in the equipment hierarchy to more specifically
determine root causes. An important feature of the proposed concept
is that it does not require any additional sensors, and thus, the
performance monitoring solution can be deployed at a low
installation cost. Moreover only a minimum of contextual
information is required, which also substantially reduces time and
cost of the deployment process.
Abstract: The scope of this paper is to describe a real electrical
installation of renewable energy using photovoltaic cells. The
displayed power grid connected network was established in 2007 at
area of Northern Greece. The photovoltaic park is composed of 6120
photovoltaic cells able to deliver a total power of 1.101.600 Wp. For
the transformation of DC voltage to AC voltage have been used 25
stand alone three phases inverters and for the connection at the
medium voltage network of Greek Power Authority have been
installed two oil immersed transformer of 630 kVA each one. Due to
the wide space area of installation a specific external lightning
protection system has been designed. Additionally, due to the
sensitive electronics of the control and protection systems of park,
surge protection, equipotent bonding and shielding were also of
major importance.
Abstract: Establishing pumping stations is one of the most common ways of providing water from rivers. There are many issues involved in the design and operation of pumping stations most important of which is the problem of sedimentation. One of the significant issues which must be taken into consideration in designing pumping stations is the operation method and technical matters related to it. Safety and convenience of operation is one of the issues that must be always considered by the designer. Some of the major issues in making decisions regarding the type of design for the station are geographical condition, the location of the station and availability of experts in maintenance and operation of the station. Dimensions of the station must allow free movement for checking and operating pumps after installation of pumps and plumbing system.
Abstract: Distributed Power generation has gained a lot of
attention in recent times due to constraints associated with
conventional power generation and new advancements in DG
technologies .The need to operate the power system economically
and with optimum levels of reliability has further led to an increase
in interest in Distributed Generation. However it is important to place
Distributed Generator on an optimum location so that the purpose of
loss minimization and voltage regulation is dully served on the
feeder. This paper investigates the impact of DG units installation on
electric losses, reliability and voltage profile of distribution networks.
In this paper, our aim would be to find optimal distributed
generation allocation for loss reduction subjected to constraint of
voltage regulation in distribution network. The system is further
analyzed for increased levels of Reliability. Distributed Generator
offers the additional advantage of increase in reliability levels as
suggested by the improvements in various reliability indices such as
SAIDI, CAIDI and AENS. Comparative studies are performed and
related results are addressed. An analytical technique is used in order
to find the optimal location of Distributed Generator. The suggested
technique is programmed under MATLAB software. The results
clearly indicate that DG can reduce the electrical line loss while
simultaneously improving the reliability of the system.
Abstract: A power cable is widely used for power supply in
power distributing networks and power transmission lines. Due to
limitations in the production, delivery and setting up power cables,
they are produced and delivered in several separate lengths. Cable
itself, consists of two cable terminations and arbitrary number of
cable joints, depending on the cable route length. Electrical stress
control is needed to prevent a dielectric breakdown at the end of the
insulation shield in both the air and cable insulation. Reliability of
cable joint depends on its materials, design, installation and operating
environment. The paper describes design and performance results for
new modeled cable joints. Design concepts, based on numerical
calculations, must be correct. An Equivalent Electrodes
Method/Boundary Elements Method-hybrid approach that allows
electromagnetic field calculations in multilayer dielectric media,
including inhomogeneous regions, is presented.
Abstract: The design of methods of the 20 K large dimension cold shield used for infrared radiation demarcating in space environment simulation test were introduced in this paper. The cold shield were cooled by five G-M cryocoolers , and the dimension of the cold shield is the largest in our country.Cold shield installation and distribution and compensator for contraction on cooling were introduced detailedly. The temperature distribution and cool-down time of cold shield surface were also calculated and analysed in this paper. The design of cold shield resolves the difficulty of compensator for contraction on cooling successfully. Test results show that the actual technical performance indicators of cold shield met and exceeded the design requirements.