Multidimensional Performance Management

In order to maximize efficiency of an information management platform and to assist in decision making, the collection, storage and analysis of performance-relevant data has become of fundamental importance. This paper addresses the merits and drawbacks provided by the OLAP paradigm for efficiently navigating large volumes of performance measurement data hierarchically. The system managers or database administrators navigate through adequately (re)structured measurement data aiming to detect performance bottlenecks, identify causes for performance problems or assessing the impact of configuration changes on the system and its representative metrics. Of particular importance is finding the root cause of an imminent problem, threatening availability and performance of an information system. Leveraging OLAP techniques, in contrast to traditional static reporting, this is supposed to be accomplished within moderate amount of time and little processing complexity. It is shown how OLAP techniques can help improve understandability and manageability of measurement data and, hence, improve the whole Performance Analysis process.

Towards an Integrated Proposal for Performance Measurement Indicators (Financial and Operational) in Advanced Production Practices

Starting with an analysis of the financial and operational indicators that can be found in the specialised literature, this study aims to contribute to improvements in the performance measurement systems used when the unit of analysis is the manufacturing plant. For this a search was done in the highest impact Journals of Production and Operations Management and Management Accounting , with the aim of determining the financial and operational indicators used to evaluate performance when Advanced Production Practices have been implemented, more specifically when the practices implemented are Total Quality Management, JIT/Lean Manufacturing and Total Productive Maintenance. This has enabled us to obtain a classification of the two types of indicators based on how much each is used. For the financial indicators we have also prepared a proposal that can be adapted to manufacturing plants- accounting features. In the near future we will propose a model that links practices implementation with financial and operational indicators and these two last with each other. We aim to will test this model empirically with the data obtained in the High Performance Manufacturing Project.

Performance Assessment and Optimization of the After-Sale Networks

The after–sales activities are nowadays acknowledged as a relevant source of revenue, profit and competitive advantage in most manufacturing industries. Top and middle management, therefore, should focus on the definition of a structured business performance measurement system for the after-sales business. The paper aims at filling this gap, and presents an integrated methodology for the after-sales network performance measurement, and provides an empirical application to automotive case companies and their official service network. This is the first study that presents an integrated multivariate approach for total assessment and improvement of after-sale services.

Improving the Road Construction Supply Chain by Developing a National Level Performance Measurement System: the Case of Estonia

Transport and logistics are the lifeblood of societies. There is a strong correlation between overall growth in economic activity and growth of transport. The movement of people and goods has the potential for creating wealth and prosperity, therefore the state of transportation infrastructure and especially the condition of road networks is often a governmental priority. The design, building and maintenance of national roads constitute a substantial share of government budgets. Taking into account the magnitude and importance of these investments, the expedience, efficiency and sustainability of these projects are of great public interest. This paper provides an overview of supply chain management principles applied to road construction. In addition, road construction performance measurement systems and ICT solutions are discussed. Road construction in Estonia is analyzed. The authors propose the development of a national performance measurement system for road construction.

Balanced Scorecard (BSC) Usage and Financial Performance of Branches in Jordanian Banking Industry

The purpose of this paper is to contribute to the body of knowledge in the area of management accounting, particularly performance measurement systems within the BSC framework, by investigating empirically the extent of multiple performance measures usage and their effects on the financial performance of Jordanian banks in the branches level. Nevertheless, the result of this study shows that the non-financial measures usages, particularly, customer oriented indicators and product/ service oriented indicators, appears to be important as it enhances firm performance. Remarkably, the findings reveal that there is positive relationship between the usages of multiple performance measures via overall BSC measures and financial performance in the branches level.

Development of a Performance Measurement System for Forwarders

Performance Measurement is still a difficult task for forwarding companies. This is caused on the one hand by missing resources and on the other hand by missing tools. The research project “Management Information System for Logistics Service Providers" aims for closing the gap between needed and disposable solutions. Core of the project is the development

Estimation of Buffer Size of Internet Gateway Server via G/M/1 Queuing Model

How to efficiently assign system resource to route the Client demand by Gateway servers is a tricky predicament. In this paper, we tender an enhanced proposal for autonomous recital of Gateway servers under highly vibrant traffic loads. We devise a methodology to calculate Queue Length and Waiting Time utilizing Gateway Server information to reduce response time variance in presence of bursty traffic. The most widespread contemplation is performance, because Gateway Servers must offer cost-effective and high-availability services in the elongated period, thus they have to be scaled to meet the expected load. Performance measurements can be the base for performance modeling and prediction. With the help of performance models, the performance metrics (like buffer estimation, waiting time) can be determined at the development process. This paper describes the possible queue models those can be applied in the estimation of queue length to estimate the final value of the memory size. Both simulation and experimental studies using synthesized workloads and analysis of real-world Gateway Servers demonstrate the effectiveness of the proposed system.

Consistency Model and Synchronization Primitives in SDSMS

This paper is on the general discussion of memory consistency model like Strict Consistency, Sequential Consistency, Processor Consistency, Weak Consistency etc. Then the techniques for implementing distributed shared memory Systems and Synchronization Primitives in Software Distributed Shared Memory Systems are discussed. The analysis involves the performance measurement of the protocol concerned that is Multiple Writer Protocol. Each protocol has pros and cons. So, the problems that are associated with each protocol is discussed and other related things are explored.

Lean TQM Automotive Factory Model System

Integrated Total Quality Management (TQM) with Lean Manufacturing (LM) is a system comprises of TQM with LM principles and is associated with financial and nonfinancial performance measurement indicators. The ultimate goal of this system is to focus on achieving total customer satisfaction by removing eight wastes available in any process in an organization. A survey questionnaire was developed and distributed to 30 highly active automotive vendors in Malaysia and analyzed by PASW Statistics 18. It was found out that these vendors have been practicing and measuring the effectiveness TQM and LM implementation. More involvement of all Malaysian automotive vendors will represent the exact status of current Malaysian automotive industry in implementing TQM and LM and can determine whether the industry is ready for integrated TQM and LM system. This is the first study that combined 4 awards practices, ISO/TS16949, Toyota Production System and SAEJ4000.

Using Structural Equation Modeling in Causal Relationship Design for Balanced-Scorecards' Strategic Map

Through 1980s, management accounting researchers described the increasing irrelevance of traditional control and performance measurement systems. The Balanced Scorecard (BSC) is a critical business tool for a lot of organizations. It is a performance measurement system which translates mission and strategy into objectives. Strategy map approach is a development variant of BSC in which some necessary causal relations must be established. To recognize these relations, experts usually use experience. It is also possible to utilize regression for the same purpose. Structural Equation Modeling (SEM), which is one of the most powerful methods of multivariate data analysis, obtains more appropriate results than traditional methods such as regression. In the present paper, we propose SEM for the first time to identify the relations between objectives in the strategy map, and a test to measure the importance of relations. In SEM, factor analysis and test of hypotheses are done in the same analysis. SEM is known to be better than other techniques at supporting analysis and reporting. Our approach provides a framework which permits the experts to design the strategy map by applying a comprehensive and scientific method together with their experience. Therefore this scheme is a more reliable method in comparison with the previously established methods.

Dynamic Performance Indicators for Aged-Care Construction Projects

Key performance indicators (KPIs) are used for post result evaluation in the construction industry, and they normally do not have provisions for changes. This paper proposes a set of dynamic key performance indicators (d-KPIs) which predicts the future performance of the activity being measured and presents the opportunity to change practice accordingly. Critical to the predictability of a construction project is the ability to achieve automated data collection. This paper proposes an effective way to collect the process and engineering management data from an integrated construction management system. The d-KPI matrix, consisting of various indicators under seven categories, developed from this study can be applied to close monitoring of the development projects of aged-care facilities. The d-KPI matrix also enables performance measurement and comparison at both project and organization levels.

Identifying the Objectives of Outsourcing Logistics Services as a Basis for Measuring Its Financial and Operational Performance

Logistics outsourcing is a growing trend and measuring its performance, a challenge. It must be consistent with the objectives set for logistics outsourcing, but we have found no objective-based performance measurement system. We have conducted a comprehensive review of the specialist literature to cover this gap, which has led us to identify and define these objectives. The outcome is that we have obtained a list of the most relevant objectives and their descriptions. This will enable us to analyse in a future study whether the indicators used for measuring logistics outsourcing performance are consistent with the objectives pursued with the outsourcing. If this is not the case, a proposal will be made for a set of financial and operational indicators to measure performance in logistics outsourcing that take the goals being pursued into account.

A Hybrid DEA Model for the Measurement of the Enviromental Performance

Data envelopment analysis (DEA) has gained great popularity in environmental performance measurement because it can provide a synthetic standardized environmental performance index when pollutants are suitably incorporated into the traditional DEA framework. Since some of the environmental performance indicators cannot be controlled by companies managers, it is necessary to develop the model in a way that it could be applied when discretionary and/or non-discretionary factors were involved. In this paper, we present a semi-radial DEA approach to measuring environmental performance, which consists of non-discretionary factors. The model, then, has been applied on a real case.

Maintenance Function's Performance Evaluation Using Adapted Balanced Scorecard Model

PT XYZ is a bottled drinking water company. To preserve production resources owned by the company so that the resources could be utilized well, it has implemented maintenance management system, which has important role in company's profitability, and is one of the factors influenced overall company's performance. Yet, up to now the company has never measured maintenance activities' contribution to company's performance. Performance evaluation is done according to adapted Balanced Scorecard model fitted to maintenance function context. This model includes six perspectives: innovation and growth, production, maintenance, environment, costumer, and finance. Actual performance measurement is done through Analytic Hierarchy Process and Objective Matrix. From the research done, we can conclude that the company's maintenance function is categorized in moderate performance. But, there are some indicators which has high priority but low performance, which are: costumers' complain rate, work lateness rate, and Return on Investment.

Strategic Management Accounting: Implementation and Control

This paper discusses the design characteristics management accounting systems should have to be useful for strategic planning and control and provides brief introductions to strategic variance analysis, profit-linked performance measurement models and balanced scorecard. It shows two multi-period, multiproduct models are specified, can be related to Porter's strategy framework and cost and revenue drivers, and can be used to support strategic planning, control and cost management.

MC and IC – What Is the Relationship?

MC (Management Control)& IC (Internal Control) – what is the relationship? (an empirical study into the definitions between MC and IC) based on the wider considerations of Internal Control and Management Control terms, attention is focused not only on the financial aspects but also more on the soft aspects of the business, such as culture, behaviour, standards and values. The limited considerations of Management Control are focused mainly in the hard, financial aspects of business operation. The definitions of Management Control and Internal Control are often used interchangeably and the results of this empirical study reveal that Management Control is part of Internal Control, there is no causal link between the two concepts. Based on the interpretation of the respondents, the term Management Control has moved from a broad term to a more limited term with the soft aspects of the influencing of behaviour, performance measurements, incentives and culture. This paper is an exploratory study based on qualitative research and on a qualitative matrix method analysis of the thematic definition of the terms Management Control and Internal Control.

Study on Plasma Creation and Propagation in a Pulsed Magnetoplasmadynamic Thruster

The performance and the plasma created by a pulsed magnetoplasmadynamic thruster for small satellite application is studied to understand better the ablation and plasma propagation processes occurring during the short-time discharge. The results can be applied to improve the quality of the thruster in terms of efficiency, and to tune the propulsion system to the needs required by the satellite mission. Therefore, plasma measurements with a high-speed camera and induction probes, and performance measurements of mass bit and impulse bit were conducted. Values for current sheet propagation speed, mean exhaust velocity and thrust efficiency were derived from these experimental data. A maximum in current sheet propagation was found by the high-speed camera measurements for a medium energy input and confirmed by the induction probes. A quasilinear tendency between the mass bit and the energy input, the current action integral respectively, was found, as well as a linear tendency between the created impulse and the discharge energy. The highest mean exhaust velocity and thrust efficiency was found for the highest energy input.

Performance Evaluation of an Online Text-Based Strategy Game

Text-based game is supposed to be a low resource consumption application that delivers good performances when compared to graphical-intensive type of games. But, nowadays, some of the online text-based games are not offering performances that are acceptable to the users. Therefore, an online text-based game called Star_Quest has been developed in order to analyze its behavior under different performance measurements. Performance metrics such as throughput, scalability, response time and page loading time are captured to yield the performance of the game. The techniques in performing the load testing are also disclosed to exhibit the viability of our work. The comparative assessment between the results obtained and the accepted level of performances are conducted as to determine the performance level of the game. The study reveals that the developed game managed to meet all the performance objectives set forth.

An Innovative Approach to the Formulation of Connection Admission Control Problem

This paper proposes an innovative approach for the Connection Admission Control (CAC) problem. Starting from an abstract network modelling, the CAC problem is formulated in a technology independent fashion allowing the proposed concepts to be applied to any wireless and wired domain. The proposed CAC is decoupled from the other Resource Management procedures, but cooperates with them in order to guarantee the desired QoS requirements. Moreover, it is based on suitable performance measurements which, by using proper predictors, allow to forecast the domain dynamics in the next future. Finally, the proposed CAC control scheme is based on a feedback loop aiming at maximizing a suitable performance index accounting for the domain throughput, whilst respecting a set of constraints accounting for the QoS requirements.