Abstract: Losses reduction initiatives in distribution systems
have been activated due to the increasing cost of supplying
electricity, the shortage in fuel with ever-increasing cost to produce
more power, and the global warming concerns. These initiatives have
been introduced to the utilities in shape of incentives and penalties.
Recently, the electricity distribution companies in Oman have been
incentivized to reduce the distribution technical and non-technical
losses with an equal annual reduction rate for 6 years. In this paper,
different techniques for losses reduction in Mazoon Electricity
Company (MZEC) are addressed. In this company, high numbers of
substation and feeders were found to be non-compliant with the
Distribution System Security Standard (DSSS). Therefore, 33
projects have been suggested to bring non-complying 29 substations
and 28 feeders to meet the planed criteria and to comply with the
DSSS. The largest part of MZEC-s network (South Batinah region)
was modeled by ETAP software package. The model has been
extended to implement the proposed projects and to examine their
effects on losses reduction. Simulation results have shown that the
implementation of these projects leads to a significant improvement
in voltage profile, and reduction in the active and the reactive power
losses. Finally, the economical analysis has revealed that the
implementation of the proposed projects in MZEC leads to an annual
saving of about US$ 5 million.
Abstract: Global Software Development (GSD) projects are
passing through different boundaries of a company, country and even
in other continents where time zone differs between both sites.
Beside many benefits of such development, research declared plenty
of negative impacts on these GSD projects. It is important to
understand problems which may lie during the execution of GSD
project with different time zones. This research project discussed and
provided different issues related to time delays in GSD projects. In
this paper, authors investigated some of the time delay factors which
usually lie in GSD projects with different time zones. This
investigation is done through systematic review of literature.
Furthermore, the practices to overcome these delay factors which
have already been reported in literature and GSD organizations are
also explored through literature survey and case studies.
Abstract: Currently, the Malaysian construction industry is
focusing on transforming construction processes from conventional
building methods to the Industrialized Building System (IBS). Still,
research on the decision making of IBS technology adoption with the
influence of contextual factors is scarce. The purpose of this paper is
to explore how contextual factors influence the IBS decision making
in building projects which is perceived by those involved in
construction industry namely construction stakeholders and IBS
supply chain members. Theoretical background, theoretical
frameworks and literatures which identify possible contextual factors
that influence decision making towards IBS technology adoption are
presented. This paper also discusses the importance of contextual
factors in IBS decision making, highlighting some possible crossover
benefits and making some suggestions as to how these can be
utilized. Conclusions are drawn and recommendations are made with
respect to the perception of socio-economic, IBS policy and IBS
technology associated with building projects.
Abstract: Compliance requires an effective communication
within an enterprise as well as towards a company-s external
environment. This requirement commences with the
implementation of compliance within large scale compliance
projects and still persists in the compliance reporting within
standard operations. On the one hand the understanding of
compliance necessities within the organization is promoted.
On the other hand reduction of asymmetric information with
compliance stakeholders is achieved. To reach this goal, a
central reporting must provide a consolidated view of different
compliance efforts- statuses. A concept which could be
adapted for this purpose is the balanced scorecard by Kaplan /
Norton. This concept has not been analyzed in detail
concerning its adequacy for a holistic compliance reporting
starting in compliance projects until later usage in regularly
compliance operations.
At first, this paper evaluates if a holistic compliance
reporting can be designed by using the balanced scorecard
concept. The current status of compliance reporting clearly
shows that scorecards are generally accepted as a compliance
reporting tool and are already used for corporate governance
reporting. Additional specialized compliance IT - solutions
exist in the market. After the scorecard-s adequacy is
thoroughly examined and proofed, an example strategy map as
the basis to derive a compliance balanced scorecard is defined.
This definition answers the question on proceeding in
designing a compliance reporting tool.
Abstract: The ubiquitous payment problems within construction
industry of China are notoriously hard to be resolved, thus lead to a
series of impacts to the industry chain. Among of them, the most direct
result is affecting the normal operation of contractors negatively. A
wealth of research has already discussed reasons of the payment
problems by introducing a number of possible improvement strategies.
But the causalities of these problems are still far from harsh reality. In
this paper, the authors propose a model for cash flow system of
construction projects by introducing System Dynamics techniques to
explore causal facets of the payment problem. The effects of payment
arrears on both cash flow and profitability of project are simulated into
four scenarios by using data from real projects. Simulating results
show visible clues to help contractors quantitatively determining the
consequences for the construction project that arise from payment
delay.
Abstract: The link between urban planning and design principles and the built environment of an urban renewal area is of interest to the field of urban studies. During the past decade, there has also been increasing interest in urban planning and design; this interest is motivated by the possibility that design policies associated with the built environment can be used to control, manage, and shape individual activity and behavior. However, direct assessments and design techniques of the links between how urban planning design policies influence individuals are still rare in the field. Recent research efforts in urban design have focused on the idea that land use and design policies can be used to increase the quality of design projects for an urban renewal area-s built environment. The development of appropriate design techniques for the built environment is an essential element of this research. Quality function deployment (QFD) is a powerful tool for improving alternative urban design and quality for urban renewal areas, and for procuring a citizen-driven quality system. In this research, we propose an integrated framework based on QFD and an Analytic Network Process (ANP) approach to determine the Alternative Technical Requirements (ATRs) to be considered in designing an urban renewal planning and design alternative. We also identify the research designs and methodologies that can be used to evaluate the performance of urban built environment projects. An application in an urban renewal built environment planning and design project evaluation is presented to illustrate the proposed framework.
Abstract: Construction projects can be implemented under various contractual and organizational systems. They can be divided into two groups: systems without the managing company where the Client manages the process, and systems with the managing company, where management is entrusted to an external company. In the public sector of the Polish market there are two ways of delivery of construction projects with the participation of the manager: one is to assign operations to another party, the so called Project Supervisor, whilst the other results from the application of FIDIC conditions of contract, which entail appointment of the Engineer. The decision is to be made by the Client and depends on various factors. On the public procurement market in Poland the selection of construction project manager boils down to awarding the contract for such a service. The selection can be done by one of eight public procurement procedures identified by the procurement law. The paper provides the analysis of 96 contracts for services awarded in 2011, which employed construction management. The study aimed to investigate the methods and criteria for selecting managers, applied in practice by the Polish public Clients.
Abstract: This paper propose the robust character segmentation method for license plate with topological transform such as twist,rotation. The first step of the proposed method is to find a candidate region for character and license plate. The character or license plate
must be appeared as closed loop in the edge image. In the case of
detecting candidate for character region, the evaluation of detected
region is using topological relationship between each character. When
this method decides license plate candidate region, character features
in the region with binarization are used. After binarization for the detected candidate region, each character region is decided again. In
this step, each character region is fitted more than previous step. In the
next step, the method checks other character regions with different
scale near the detected character regions, because most license plates
have license numbers with some meaningful characters around them.
The method uses perspective projection for geometrical normalization.
If there is topological distortion in the character region, the method
projects the region on a template which is defined as standard license
plate using perspective projection. In this step, the method is able to
separate each number region and small meaningful characters. The
evaluation results are tested with a number of test images.
Abstract: The purpose of this research is to increase our
knowledge as regards how Small-and-Medium-Sized Enterprises
(SMEs) tackle ERP implementation projects to achieve successful
adoption and use of these systems within the organization. SMEs
have scare resources to handle these kinds of projects which have
proved to be risky and costly. There are several studies focusing on
ERP implementation in larger companies, however, few studies
report on challenges experienced by SMEs. Our research seeks to
bridge this gap. Through a multiple case study of four companies, we
identified challenges and critical elements within the different phases
(pre-implementation, implementation and post-implementation) of
the ERP life cycle. To interpret our findings, we utilize a well-know
ERP life cycle model and critical success factors developed for larger
companies which are reported in former research literature. We
discuss if these models are relevant for SMEs and suggest additional
critical elements identified in this study to make a framework more
adapted to the SME context.
Abstract: This article describes the aspects of the formation of
the national idea and national identity through the prism of gender
control and its contradistinction to the obsolete, Soviet component.
The role of females in ethnic and national projects is considered from
the point of view of Dr. Nira Yuval-Davis: as biological reproducers
of the ethnic communities- members; as reproducers of the boarders
of ethnic/national groups; as central participants in the ideological
reproduction of community and transducers of its culture; as symbols
in ideology, reproduction and transformation of ethnic/national
categories; and as participants of national, economical, political and
military combats. The society of the transitional type uses the
symbolic resources of the formation of gender component in the
national project. The gender patterns act like cultural codes,
executing the important ideological function in formation of the
national female- image, i.e. the discussion on hijab - it-s not just the
discussion on control over the female body, it-s the discussion on the
metaphor of social order.
Abstract: Transferring information developed by other peoples is an ordinary event that happens during daily conversations, for example when employees sea each other in the organization, or when they are having lunch together, or attending a meeting, they use to talk about their experience, and discuss about their current projects, and talk about their successes over some specific problems. Despite the potential value of leveraging organizational memory and expertise by using OMS and ER, still small organizations haven-t been able to capitalize on its promised value. Each organization has its internal knowledge management system, in some of organizations the system face the lack of expert people to save their experience in the repository and in another hand on some other organizations there are lots of expert people but the organization doesn-t have the maximum use of their knowledge.
Abstract: Developing a supply chain management (SCM) system is costly, but important. However, because of its complicated nature, not many of such projects are considered successful. Few research publications directly relate to key success factors (KSFs) for implementing a SCM system. Motivated by the above, this research proposes a hierarchy of KSFs for SCM system implementation in the semiconductor industry by using a two-step approach. First, the literature review indicates the initial hierarchy. The second step includes a focus group approach to finalize the proposed KSF hierarchy by extracting valuable experiences from executives and managers that actively participated in a project, which successfully establish a seamless SCM integration between the world's largest semiconductor foundry manufacturing company and the world's largest assembly and testing company. Future project executives may refer the resulting KSF hierarchy as a checklist for SCM system implementation in semiconductor or related industries.
Abstract: Firms have invested heavily in knowledge
management (KM) with the aim to build a knowledge capability and
use it to achieve a competitive advantage. Research has shown,
however, that not all knowledge management projects succeed. Some
studies report that about 84% of knowledge management projects
fail. This paper has integrated studies on the impediments to
knowledge management into a theoretical framework. Based on this
framework, five cases documenting failed KM initiatives were
analysed. The analysis gave us a clear picture about why certain KM
projects fail. The high failure rate of KM can be explained by the
gaps that exist between users and management in terms of KM
perceptions and objectives
Abstract: Many studies have been conducted for derivation of
attenuation relationships worldwide, however few relationships have
been developed to use for the seismic region of Iranian plateau and
only few of these studies have been conducted for derivation of
attenuation relationships for parameters such as uniform duration.
Uniform duration is the total time during which the acceleration is
larger than a given threshold value (default is 5% of PGA). In this
study, the database was same as that used previously by Ghodrati
Amiri et al. (2007) with same correction methods for earthquake
records in Iran. However in this study, records from earthquakes with
MS< 4.0 were excluded from this database, each record has
individually filtered afterward, and therefore the dataset has been
expanded. These new set of attenuation relationships for Iran are
derived based on tectonic conditions with soil classification into rock
and soil. Earthquake parameters were chosen to be
hypocentral distance and magnitude in order to make it easier to use
the relationships for seismic hazard analysis. Tehran is the capital
city of Iran wit ha large number of important structures. In this study,
a probabilistic approach has been utilized for seismic hazard
assessment of this city. The resulting uniform duration against return
period diagrams are suggested to be used in any projects in the area.
Abstract: The implementations of green roof have been widely
used in the developed countries such as Germany, United Kingdom,
United States and Canada. Green roof have many benefits such as
aesthetic and economic value, ecological gain which are optimization
of storm water management, urban heat island mitigation and energy
conservation. In term of pollution, green roof can control the air and
noise pollution in urban cities. The application of green roof in
Malaysian building has been studied with the previous work of green
roof either in Malaysia or other Asian region as like Indonesia,
Singapore, Thailand, Taiwan and several other countries that have
similar climate and environment as in Malaysia. These technologies
of adapting green roof have been compared to the Green Building
Index (GBI) of Malaysian buildings. The study has concentrated on
the technical aspect of green roof system having focused on i) waste
& recyclable materials ii) types of plants and method of planting and
iii) green roof as tool to reduce storm water runoff. The finding of
these areas will be compared to the suitability in achieving good
practice of the GBI in Malaysia. Results show that most of the
method are based on the countries own climate and environment.
This suggests that the method of using green roof must adhere to the
tropical climate of Malaysia. Suggestion of this research will be
viewed in term of the sustainability of the green roof. Further
research can be developed to implement the best method and
application in Malaysian climate especially in urban cities and
township.
Abstract: Software crisis refers to the situation in which the developers are not able to complete the projects within time and budget constraints and moreover these overscheduled and over budget projects are of low quality as well. Several methodologies have been adopted form time to time to overcome this situation and now in the focus is component based software engineering. In this approach, emphasis is on reuse of already existing software artifacts. But the results can not be achieved just by preaching the principles; they need to be practiced as well. This paper highlights some of the very basic elements of this approach, which has to be in place to get the desired goals of high quality, low cost with shorter time-to-market software products.
Abstract: This study suggests how an order-receiving company
can avoid disclosing schedule information on unit tasks to the
order-placing company when carrying out a collaborative project on
the value chain in an order-oriented industry. Specifically, it suggests
methods for keeping schedule information confidential, and
categorizes potential situations by inter-task dependency. Lastly, an
approach to select the most optimal non-disclosure method is
discussed. With the methods for not disclosing work-related
information suggested in the study, order-receiving companies can
logically deal with political issues relating to the question of whether
or not to disclose information upon the execution of a collaborative
project in cooperation with an order-placing firm. Moreover,
order-placing companies can monitor undistorted information, while
respecting the legitimate rights of an order-receiving company.
Therefore, it is fair to say that the suggestions made in this study will
contribute to the smooth operation of collaborative intercompany
projects.
Abstract: Many organisations are nowadays interested to adopt
lean manufacturing strategy that would enable them to compete in
this competitive globalisation market. In this respect, it is necessary
to assess the implementation of lean manufacturing in different
organisations so that the important best practices can be identified.
This paper describes the development of key areas which will be
used to assess the adoption and implementation of lean
manufacturing practices. There are some key areas developed to
evaluate and reduce the most optimal projects so as to enhance their
production efficiency and increase the purpose of the economic
benefits of the manufacturing unit.
Lean manufacturing is becoming lean enterprise by treating its
customers and suppliers as partners. This gives the extra edge in
today-s cost and time competitive markets. The organisation is
becoming strong in all the conventional competition points. They are
Price, Quality and Delivery. Lean enterprise owners can deliver high
quality products quickly, with low price.
Abstract: A dynamic risk management framework for software
projects is presented. Currently available software risk management
frameworks and risk assessment models are static in nature and lacks
feedback capability. Such risk management frameworks are not
capable of providing the risk assessment of futuristic changes in risk
events. A dynamic risk management framework for software project
is needed that provides futuristic assessment of risk events.
Abstract: In the past years, the world has witnessed significant work in the field of Manufacturing. Special efforts have been made in the implementation of new technologies, management and control systems, among many others which have all evolved the field. Closely following all this, due to the scope of new projects and the need of turning the existing flexible ideas into more autonomous and intelligent ones, i.e.: moving toward a more intelligent manufacturing, the present paper emerges with the main aim of contributing to the analysis and a few customization issues of a new iCIM 3000 system at the IPSAM. In this process, special emphasis in made on the material flow problem. For this, besides offering a description and analysis of the system and its main parts, also some tips on how to define other possible alternative material flow scenarios and a partial analysis of the combinatorial nature of the problem are offered as well. All this is done with the intentions of relating it with the use of simulation tools, for which these have been briefly addressed with a special focus on the Witness simulation package. For a better comprehension, the previous elements are supported by a few figures and expressions which would help obtaining necessary data. Such data and others will be used in the future, when simulating the scenarios in the search of the best material flow configurations.