Abstract: Non-saturated soils that while saturation greatly
decrease their volume, have sudden settlement due to increasing
humidity, fracture and structural crack are called loess soils. Whereas
importance of civil projects including: dams, canals and
constructions bearing this type of soil and thereof problems, it is
required for carrying out more research and study in relation to loess
soils. This research studies shear strength parameters by using
grading test, Atterberg limit, compression, direct shear and
consolidation and then effect of using cement and lime additives on
stability of loess soils is studied. In related tests, lime and cement are
separately added to mixed ratios under different percentages of soil
and for different times the stabilized samples are processed and effect
of aforesaid additives on shear strength parameters of soil is studied.
Results show that upon passing time the effect of additives and
collapsible potential is greatly decreased and upon increasing
percentage of cement and lime the maximum dry density is
decreased; however, optimum humidity is increased. In addition,
liquid limit and plastic index is decreased; however, plastic index
limit is increased. It is to be noted that results of direct shear test
reveal increasing shear strength of soil due to increasing cohesion
parameter and soil friction angle.
Abstract: The challenge for software development house in
Bangladesh is to find a path of using minimum process rather than CMMI or ISO type gigantic practice and process area. The small and medium size organization in Bangladesh wants to ensure minimum
basic Software Process Improvement (SPI) in day to day operational
activities. Perhaps, the basic practices will ensure to realize their company's improvement goals. This paper focuses on the key issues in basic software practices for small and medium size software
organizations, who are unable to effort the CMMI, ISO, ITIL etc. compliance certifications. This research also suggests a basic software process practices model for Bangladesh and it will show the mapping of our suggestions with international best practice. In this IT
competitive world for software process improvement, Small and medium size software companies that require collaboration and
strengthening to transform their current perspective into inseparable global IT scenario. This research performed some investigations and analysis on some projects- life cycle, current good practice, effective approach, reality and pain area of practitioners, etc. We did some
reasoning, root cause analysis, comparative analysis of various
approach, method, practice and justifications of CMMI and real life. We did avoid reinventing the wheel, where our focus is for minimal
practice, which will ensure a dignified satisfaction between
organizations and software customer.
Abstract: Numerous concrete structures projects are currently running in Libya as part of a US$50 billion government funding. The
quality of concrete used in 20 different construction projects were assessed based mainly on the concrete compressive strength achieved. The projects are scattered all over the country and are at
various levels of completeness. For most of these projects, the
concrete compressive strength was obtained from test results of a
150mm standard cube mold. Statistical analysis of collected concrete
compressive strengths reveals that the data in general followed a
normal distribution pattern. The study covers comparison and assessment of concrete quality aspects such as: quality control, strength range, data standard deviation, data scatter, and ratio of minimum strength to design strength. Site quality control for these projects ranged from very good to poor according to ACI214 criteria [1]. The ranges (Rg) of the strength (max. strength – min. strength) divided by average strength are from (34% to 160%). Data scatter is
measured as the range (Rg) divided by standard deviation () and is
found to be (1.82 to 11.04), indicating that the range is ±3σ.
International construction companies working in Libya follow
different assessment criteria for concrete compressive strength in lieu
of national unified procedure. The study reveals that assessments of
concrete quality conducted by these construction companies usually
meet their adopted (internal) standards, but sometimes fail to meet
internationally known standard requirements. The assessment of
concrete presented in this paper is based on ACI, British standards
and proposed Libyan concrete strength assessment criteria.
Abstract: This study defines a methodology to compute unitary costs for freight transportation modes. The main objective was to gather relevant costs data to support the formulation and evaluation of railway, road, pipelines and port projects. This article will concentrate on the following steps: Compilation and analysis of relevant modal cost studies, Methodological adjustments to make cost figures comparable between studies, Definition of typology and scope of transportation modes, Analysis and validation of cost values for relevant freight transportation modes in Chile. In order to define the comparison methodology for the costs between the different transportation modes, it was necessary to consider that the relevant cost depends on who performs the comparison. Thus, for the transportation user (e.g. exporter) the pertinent costs are the mode tariffs, whereas from the operators perspective (e.g. rail manager), the pertinent costs are the operating costs of each mode.
Abstract:
Innovation is becoming more and more important in
modern society. There are a lot of researches on different kinds of
innovation but marketing innovation is one kind of innovation that
has not been studied frequently before. Marketing innovation is
defined as a new way in which companies can market themselves to
potential or existing customers.
The study shows some key elements for marketing innovation that
are worth paying attention to when implementing marketing
innovation projects. Examples of such key elements are: paying
attention to the neglected market, suitable market segmentatio
reliable market information, public relationship, increased customer
value, combination of market factors, explore different marketing
channels and the use of technology in combination with what? Beside
the key elements for marketing innovation, we also present some
risks that may occur, such as cost, market uncertainty, information
leakage, imitation and overdependence on experience.
By proposing a set of indicators to measure marketing innovation,
the article offers solutions for marketing innovation implementation
so that any organization can achieve optimal results.
Abstract: Over the past few years, companies in developing
countries have implemented enterprise resource planning (ERP)
systems. Regardless of the various benefits of the ERP system, its
adoption and implementation have not been without problems. Many
companies have assigned considerable organizational resources to
their ERP projects, but have encountered unexpected challenges.
Neglecting a number of important factors in ERP projects might lead
to failure instead of success. User satisfaction is among those factors
that has a major influence on ERP implementation success. So, this
paper intends to investigate the key factors that create ERP users-
satisfaction and to discover whether ERP users- satisfaction varies
among different users- profiles. The study was conducted using a
survey questionnaire which was distributed to ERP users in Iranian
organizations. A total of 384 responses were collected and analyzed.
The findings indicated that younger ERP users tend to be more
satisfied with ERP systems. Furthermore, ERP users with more
experiences in IT and also more educated users have more
satisfaction with ERP softwares. However, the study found no
satisfaction differences between men and women users.
Abstract: Construction of tunnels is connected with high
uncertainty in the field of costs, construction period, safety and
impact on surroundings. Risk management became therefore a
common part of tunnel projects, especially after a set of fatal
collapses occurred in 1990's. Such collapses are caused usually by
combination of factors that can be divided into three main groups, i.e.
unfavourable geological conditions, failures in the design and
planning or failures in the execution.
This paper suggests a procedure enabling quantification of the
excavation risk related to extraordinary accidents using FTA and
ETA tools. It will elaborate on a common process of risk analysis and
enable the transfer of information and experience between particular
tunnel construction projects. Further, it gives a guide for designers,
management and other participants, how to deal with risk of such
accidents and how to make qualified decisions based on a
probabilistic approach.
Abstract: Rapid enlargement and physical development of cities
have facilitated the emergence of a number of city life crises and
decrease of environment quality. Subsequently, the need for noticing
the concept of quality and its improvement in urban environments,
besides quantitative issues, is obviously recognized. In the domain of
urban ideas the importance of taking these issues into consideration
is obvious not only in accordance to sustainable development
concepts and improvement of public environment quality, but also in
the enhancement of social and behavioral models.
The major concern of present article is to study the nature of urban
environment quality in urban development plans, which is important
not only in the concept and the aim of projects but also in their
execution procedure. As a result, this paper is going to utilize
planning capacities caused by environmental virtues in the planning
procedure of Moft Abad neighborhood. Thus, at the first step,
applying the Analytical Hierarchy Process (AHP), it has assessed
quantitative environmental issues. The present conditions of Moft
Abad state that “the neighborhood is generally suffering from the
lack of qualitative parameters, and the previously formed planning
procedures could not take the sustainable and developmental paths
which are aimed at environment quality virtues." The diminution of
economical and environmental virtues has resulted in the diminution
of residential and social virtues. Therefore, in order to enhance the
environment quality in Moft Abad, the present paper has tried to
supply the subject plans in order to make a safe, healthy, and lively
neighborhood.
Abstract: Geographic Information System (GIS) is a computerbased
tool used extensively to solve various engineering problems
related to spatial data. In spite of growing popularity of GIS, its
complete potential to construction industry has not been realized. In
this paper, the summary of up-to-date work on spatial applications of
GIS technologies in construction industry is presented. GIS
technologies have the potential to solve space related problems of
construction industry involving complex visualization, integration of
information, route planning, E-commerce, cost estimation, etc. GISbased
methodology to handle time and space issues of construction
projects scheduling is developed and discussed in this paper.
Abstract: Planning community has been long discussing emerging paradigms within the planning theory in the face of the changing conditions of the world order. The paradigm shift concept was introduced by Thomas Kuhn, in 1960, who claimed the necessity of shifting within scientific knowledge boundaries; and following him in 1970 Imre Loktas also gave priority to the emergence of multi-paradigm societies [24]. Multi-paradigm is changing our predetermined lifeworld through uncertainties. Those uncertainties are reflected in two sides, the first one is uncertainty as a concept of possibility and creativity in public sphere and the second one is uncertainty as a risk. Therefore, it is necessary to apply a resilience planning approach to be more dynamic in controlling uncertainties which have the potential to transfigure present time and space definitions. In this way, stability of system can be achieved. Uncertainty is not only an outcome of worldwide changes but also a place-specific issue, i.e. it changes from continent to continent, a country to country; a region to region. Therefore, applying strategic spatial planning with respect to resilience principle contributes to: control, grasp and internalize uncertainties through place-specific strategies. In today-s fast changing world, planning system should follow strategic spatial projects to control multi-paradigm societies with adaptability capacities. Here, we have selected two alternatives to demonstrate; these are; 1.Tehran (Iran) from the Middle East 2.Bath (United Kingdom) from Europe. The study elaborates uncertainties and particularities in their strategic spatial planning processes in a comparative manner. Through the comparison, the study aims at assessing place-specific priorities in strategic planning. The approach is to a two-way stream, where the case cities from the extreme end of the spectrum can learn from each other. The structure of this paper is to firstly compare semi-periphery (Tehran) and coreperiphery (Bath) cities, with the focus to reveal how they equip to face with uncertainties according to their geographical locations and local particularities. Secondly, the key message to address is “Each locality requires its own strategic planning approach to be resilient.--
Abstract: Early supplier involvement (ESI) benefits new
product development projects several ways. Nevertheless, many castuser
companies do not know the advantages of ESI and therefore do
not utilize it. This paper presents reasons why to utilize ESI in
casting industry and how that can be done. Further, this paper
presents advantages and challenges related to ESI in casting industry,
and introduces a Casting-Network Collaboration Model. The model
presents practices for companies to build advantageous collaborative
relationships. More detailed, the model describes three levels for
company-network relationships in casting industry with different
degrees of collaboration, and requirements for operating in each
level. In our research, ESI was found to influence, for example, on
project time, component cost, and quality. In addition, challenges
related to ESI, such as, a lack of mutual trust and unawareness about
the advantages were found. Our research approach was a case study
including four cases.
Abstract: Chemical industry project management involves
complex decision making situations that require discerning abilities
and methods to make sound decisions. Project managers are faced
with decision environments and problems in projects that are
complex. In this work, case study is Research and Development
(R&D) project selection. R&D is an ongoing process for forward
thinking technology-based chemical industries. R&D project
selection is an important task for organizations with R&D project
management. It is a multi-criteria problem which includes both
tangible and intangible factors. The ability to make sound decisions
is very important to success of R&D projects. Multiple-criteria
decision making (MCDM) approaches are major parts of decision
theory and analysis. This paper presents all of MCDM approaches
for use in R&D project selection. It is hoped that this work will
provide a ready reference on MCDM and this will encourage the
application of the MCDM by chemical engineering management.
Abstract: With data centers, end-users can realize the pervasiveness of services that will be one day the cornerstone of our lives. However, data centers are often classified as computing systems that consume the most amounts of power. To circumvent such a problem, we propose a self-adaptive weighted sum methodology that jointly optimizes the performance and power consumption of any given data center. Compared to traditional methodologies for multi-objective optimization problems, the proposed self-adaptive weighted sum technique does not rely on a systematical change of weights during the optimization procedure. The proposed technique is compared with the greedy and LR heuristics for large-scale problems, and the optimal solution for small-scale problems implemented in LINDO. the experimental results revealed that the proposed selfadaptive weighted sum technique outperforms both of the heuristics and projects a competitive performance compared to the optimal solution.
Abstract: The ITE Project is a project that has 1800 km length
and across the Turkey's land through east to west. The project of
pipeline enters geographically from Iran to Doğubayazit (Turkey) in
the east, exits to Greece from Ipsala province of Turkey in the west.
This project is the one of the international projects in such scale that
provides the natural gas of Iran and Caspian Sea through the
European continent. In this investigation, some information will be
given about the methods used to verify the direction of the pipeline
and the technical properties of the results obtained. The cost of
project itself entirely depends on the direction of the pipeline which
would be as short as possible and the specifications of the land cover.
Production standards of 1/2000 scaled digital orthophoto and vectoral
maps as a results of the use of map production materials and methods
(such as high resolution satellite images, and digital aerial images
captured from digital aerial cameras), will also be given in this report.
According to Turkish national map production standards, TM
((Transversal Mercator, 3 degree) projection is used for large scale
map and UTM (Universal Transversal Mercator, 6 degree) is used for
small scale map production standards. Some information is also given
about the projection used in the ITE natural gas pipeline project.
Abstract: For any country the project management has been a
vital part for its development. The highly competitive business world
has created tremendous pressure on the project managers to achieve
success. The pressure is derived from survival and profit building in
business organizations which compels the project managers to pursue
unethical practices. As a result unethical activities in business
projects can be found easily where situations or issues arise due to
dubious business practice, high corruption, or absolute violation of
the law. The recent spur on Commonwealth games to be organized in
New Delhi indicates towards the same. It has been seen that the
project managers mainly focus on cost, time, and quality rather than
social impact and long term effects of the project. Surprisingly the
literature as well as the practitioner-s perspective also does not
identify the role of ethics in project success. This paper identifies
ethics as the fourth most important dimension in the project based
organizations. The paper predicts that the approach of considering
ethics will result in sustainability of the project. It will increase
satisfaction and loyalty of the customers as well as create harmony,
trust, brotherhood, values and morality among the team members.
This paper is conceptual in nature as inadequate literature exists
linking the project success with an ethical approach.
Abstract: Estimation time and cost of work completion in a
project and follow up them during execution are contributors to
success or fail of a project, and is very important for project
management team. Delivering on time and within budgeted cost
needs to well managing and controlling the projects. To dealing with
complex task of controlling and modifying the baseline project
schedule during execution, earned value management systems have
been set up and widely used to measure and communicate the real
physical progress of a project. But it often fails to predict the total
duration of the project. In this paper data mining techniques is used
predicting the total project duration in term of Time Estimate At
Completion-EAC (t). For this purpose, we have used a project with
90 activities, it has updated day by day. Then, it is used regular
indexes in literature and applied Earned Duration Method to
calculate time estimate at completion and set these as input data for
prediction and specifying the major parameters among them using
Clem software. By using data mining, the effective parameters on
EAC and the relationship between them could be extracted and it is
very useful to manage a project with minimum delay risks. As we
state, this could be a simple, safe and applicable method in prediction
the completion time of a project during execution.
Abstract: This paper presents initiatives of Knowledge
Management (KM) applied to Forensic Sciences field, especially
developed at the Forensic Science Institute of the Brazilian Federal
Police. Successful projects, related to knowledge sharing, drugs
analysis and environmental crimes, are reported in the KM
perspective. The described results are related to: a) the importance of
having an information repository, like a digital library, in such a
multidisciplinary organization; b) the fight against drug dealing and
environmental crimes, enabling the possibility to map the evolution
of crimes, drug trafficking flows, and the advance of deforestation in
Amazon rain forest. Perspectives of new KM projects under
development and studies are also presented, tracing an evolution line
of the KM view at the Forensic Science Institute.
Abstract: The main problems of data centric and open source
project are large number of developers and changes of core
framework. Model-View-Control (MVC) design pattern significantly
improved the development and adjustments of complex projects.
Entity framework as a Model layer in MVC architecture has
simplified communication with the database. How often are the new
technologies used and whether they have potentials for designing
more efficient Enterprise Resource Planning (ERP) system that will
be more suited to accountants?
Abstract: Future astronomical projects on large space x-ray
imaging telescopes require novel substrates and technologies for the
construction of their reflecting mirrors. The mirrors must be
lightweight and precisely shaped to achieve large collecting area with
high angular resolution. The new materials and technologies must be
cost-effective. Currently, the most promising materials are glass or
silicon foils. We focused on precise shaping these foils by thermal
forming process. We studied free and forced slumping in the
temperature region of hot plastic deformation and compared the
shapes obtained by the different slumping processes. We measured
the shapes and the surface quality of the foils. In the experiments, we
varied both heat-treatment temperature and time following our
experiment design. The obtained data and relations we can use for
modeling and optimizing the thermal forming procedure.
Abstract: The paper provides a literature review of the STEPNC
compliant research around the world. The first part of this paper
focuses on projects based on STEP compliance followed by research
and development in this area based on machining operations. Review
the literature relating to relevant STEP standards and application in
the area of turning centers. This research will review the various
research work, carried out from the evolution of STEP-NC of the
CNC manufacturing activities. The paper concludes with discussion
of the applications in this particular area.