Abstract: As global industry developed rapidly, the energy
demand also rises simultaneously. In the production process, there’s a
lot of energy consumed in the process. Formally, the energy used in
generating the heat in the production process. In the total energy
consumption, 40% of the heat was used in process heat, mechanical
work, chemical energy and electricity. The remaining 50% were
released into the environment. It will cause energy waste and
environment pollution. There are many ways for recovering the waste
heat in factory. Organic Rankine Cycle (ORC) system can produce
electricity and reduce energy costs by recovering the waste of low
temperature heat in the factory. In addition, ORC is the technology
with the highest power generating efficiency in low-temperature heat
recycling. However, most of factories executives are still hesitated
because of the high implementation cost of the ORC system, even a lot
of heat are wasted. Therefore, this study constructs a nonlinear
mathematical model of waste heat recovery equipment configuration
to maximize profits. A particle swarm optimization algorithm is
developed to generate the optimal facility installation plan for the ORC
system.
Abstract: The effects of down slope steepness on soil splash distribution under a water drop impact have been investigated in this study. The equipment used are the burette to simulate a water drop, a splash cup filled with sandy soil which forms the source area and a splash board to collect the ejected particles. The results found in this study have shown that the apparent mass increased with increasing downslope angle following a linear regression equation with high coefficient of determination. In the same way, the radial soil splash distribution over the distance has been analyzed statistically, and an exponential function was the best fit of the relationship for the different slope angles. The curves and the regressions equations validate the well known FSDF and extend the theory of Van Dijk.
Abstract: Concerning the inpatient care the present situation is
characterized by intense charges of medical technology into the
clinical daily routine and an ever stronger integration of special
techniques into the clinical workflow. Medical technology is by now
an integral part of health care according to consisting general
accepted standards. Purchase and operation thereby represent an
important economic position and both are subject of everyday
optimisation attempts. For this purpose by now exists a huge number
of tools which conduce more likely to a complexness of the problem
by a comprehensive implementation. In this paper the advantages of
an integrative information-workflow on the life-cycle-management in
the region of medical technology are shown.
Abstract: Market competition and a desire to gain advantages on globalized market, drives companies towards innovation efforts. Project overload is an unpleasant phenomenon, which is happening for employees inside those organizations trying to make the most efficient use of their resources to be innovative. But what are the impacts of project overload on organization-s innovation capabilities? Advanced engineering teams (AE) inside a major heavy equipment manufacturer are suffering from project overload in their quest for innovation. In this paper, Agent-based modeling (ABM) is used to examine the current reality of the company context, and of the AE team, where the opportunities and challenges for reducing the risk of project overload and moving towards innovation were identified. Project overload is more likely to stifle innovation and creativity inside teams. On the other hand, motivations on proper challenging goals are more likely to help individual to alleviate the negative aspects of low level of project overload.
Abstract: Installation of power compensation equipment in
some cases places additional buses into the system. Therefore, a total
number of power flow equations and voltage unknowns increase due
to additional locations of installed devices. In this circumstance, power flow calculation is more complicated. It may result in a
computational convergence problem. This paper presents a power flow calculation by using Newton-Raphson iterative method together
with the proposed load transfer technique. This concept is to eliminate additional buses by transferring installed loads at the new buses to existing two adjacent buses. Thus, the total number of power
flow equations is not changed. The overall computational speed is
expectedly shorter than that of solving the problem without applying the load transfer technique. A 15-bus test system is employed for test
to evaluate the effectiveness of the proposed load transfer technique. As a result, the total number of iteration required and execution time
is significantly reduced.
Abstract: Sensorized instruments that accurately measure the interaction forces (between biological tissue and instrument endeffector) during surgical procedures offer surgeons a greater sense of immersion during minimally invasive robotic surgery. Although there is ongoing research into force measurement involving surgical graspers little corresponding effort has been carried out on the measurement of forces between scissor blades and tissue. This paper presents the design and development of a force measurement test apparatus, which will serve as a sensor characterization and evaluation platform. The primary aim of the experiments is to ascertain whether the system can differentiate between tissue samples with differing mechanical properties in a reliable, repeatable manner. Force-angular displacement curves highlight trends in the cutting process as well the forces generated along the blade during a cutting procedure. Future applications of the test equipment will involve the assessment of new direct force sensing technologies for telerobotic surgery.
Abstract: As new challenges emerge in power electrical
workplace safety, it is the responsibility of the systems designer to
seek out new approaches and solutions that address them. Design
decisions made today will impact cost, safety and serviceability of
the installed systems for 40 or 50 years during the useful life for the
owner. Studies have shown that this cost is an order of magnitude of
7 to 10 times the installed cost of the power distribution equipment.
This paper reviews some aspects of earthing system design in power
substation surrounded by residential houses. The electrical potential
rise and split factors are discussed and a few recommendations are
provided to achieve a safety voltage in the area beyond the boundary
of the substation.
Abstract: The Integrated Performance Modelling Environment
(IPME) is a powerful simulation engine for task simulation and
performance analysis. However, it has no high level cognition such
as memory and reasoning for complex simulation. This article
introduces a knowledge representation and reasoning scheme that can
accommodate uncertainty in simulations of military personnel with
IPME. This approach demonstrates how advanced reasoning models
that support similarity-based associative process, rule-based abstract
process, multiple reasoning methods and real-time interaction can be
integrated with conventional task network modelling to provide
greater functionality and flexibility when modelling operator
performance.