Environmental Impact Assessment of Gotv and Hydro-Electric Dam on the Karoon River Using ICOLD Technique

Today Environmental Impact Assessment (EIA) is known as one of the most important tools for decision makers in the construction of civil and industrial projects towards sustainable development. In the past, projects were evaluated based on cost and benefit analysis regardless of the physical and biological environmental effects and its socio-economical impacts. According to the Department of Environment (DOE) of Iran's regulations, the construction of hydroelectric dams is an activity that requires an EIA report. In this paper the environmental impact assessment of the Gotvand hydro-electrical dam has been evaluated in the three environment elements, biological, Physical-chemical and cultural units. This dam is one of the largest dams in Iran with a volume of 4500 MCM and is going to be the last dam on the Karoon River in the south of Iran. In this paper the ICOLD (International Commission on Large Dams) technique was employed for the environmental impact assessment of the dam. The research includes all socio economical and environmental effects of the dam during the construction and operation of the hydro electric dam and Environmental management, monitoring and mitigation of negative impacts were analyzed. In this project the results led to using some techniques to protect the destructive impacts on biological aspects beside the effective long time period impacts on the biological aspects. The impacts on physical aspects are temporary and negative commonly that could be restored and rehabilitated in natural process in the long time in operation period.

Effect of Shallow Groundwater Table on the Moisture Depletion Pattern in Crop Root Zone

Different techniques for estimating seasonal water use from soil profile water depletion frequently do not account for flux below the root zone. Shallow water table contribution to supply crop water use may be important in arid and semi-arid regions. Development of predictive root uptake models, under influence of shallow water table makes it possible for planners to incorporate interaction between water table and root zone into design of irrigation projects. A model for obtaining soil moisture depletion from root zone and water movement below it is discussed with the objective to determine impact of shallow water table on seasonal moisture depletion patterns under water table depth variation, up to the bottom of root zone. The role of different boundary conditions has also been considered. Three crops: Wheat (Triticum aestivum), Corn (Zea mays) and Potato (Solanum tuberosum), common in arid & semi-arid regions, are chosen for the study. Using experimentally obtained soil moisture depletion values for potential soil moisture conditions, moisture depletion patterns using a non linear root uptake model have been obtained for different water table depths. Comparative analysis of the moisture depletion patterns under these conditions show a wide difference in percent depletion from different layers of root zone particularly top and bottom layers with middle layers showing insignificant variation in moisture depletion values. Moisture depletion in top layer, when the water table rises to root zone increases by 19.7%, 22.9% & 28.2%, whereas decrease in bottom layer is 68.8%, 61.6% & 64.9% in case of wheat, corn & potato respectively. The paper also discusses the causes and consequences of increase in moisture depletion from top layers and exceptionally high reduction in bottom layer, and the possible remedies for the same. The numerical model developed for the study can be used to help formulating irrigation strategies for areas where shallow groundwater of questionable quality is an option for crop production.

A New IT-Convergence Service Design Framework

In many countries, digital city or ubiquitous city (u-City) projects have been initiated to provide digitalized economic environments to cities. Recently in Korea, Kangwon Province has started the u-Kangwon project to boost local economy with digitalized tourism services. We analyze the limitations of the ubiquitous IT approach through the u-Kangwon case. We have found that travelers are more interested in quality over speed in access of information. For improved service quality, we are looking to develop an IT-convergence service design framework (ISDF). The ISDF is based on the service engineering technique and composed of three parts: Service Design, Service Simulation, and the Service Platform.

Corporate Information System Educational Center

The given work is devoted to the description of Information Technologies NAS of Azerbaijan created and successfully maintained in Institute. On the basis of the decision of board of the Supreme Certifying commission at the President of the Azerbaijan Republic and Presidium of National Academy of Sciences of the Azerbaijan Republic, the organization of training courses on Computer Sciences for all post-graduate students and dissertators of the republic, taking of examinations of candidate minima, it was on-line entrusted to Institute of Information Technologies of the National Academy of Sciences of Azerbaijan. Therefore, teaching the computer sciences to post-graduate students and dissertators a scientific - methodological manual on effective application of new information technologies for research works by post-graduate students and dissertators and taking of candidate minima is carried out in the Educational Center. Information and communication technologies offer new opportunities and prospects of their application for teaching and training. The new level of literacy demands creation of essentially new technology of obtaining of scientific knowledge. Methods of training and development, social and professional requirements, globalization of the communicative economic and political projects connected with construction of a new society, depends on a level of application of information and communication technologies in the educational process. Computer technologies develop ideas of programmed training, open completely new, not investigated technological ways of training connected to unique opportunities of modern computers and telecommunications. Computer technologies of training are processes of preparation and transfer of the information to the trainee by means of computer. Scientific and technical progress as well as global spread of the technologies created in the most developed countries of the world is the main proof of the leading role of education in XXI century. Information society needs individuals having modern knowledge. In practice, all technologies, using special technical information means (computer, audio, video) are called information technologies of education.

Overcoming Barriers to Open Innovation at Apple, Nintendo and Nokia

This is a conceptual paper on the application of open innovation in three case examples of Apple, Nintendo, and Nokia. Utilizing key concepts from research into managerial and organizational cognition, we describe how each company overcame barriers to utilizing open innovation strategy in R&D and commercialization projects. We identify three levels of barriers: cognitive, behavioral, and institutional, and describe the companies balanced between internal and external resources to launch products that were instrumental in companies reinventing themselves in mature markets.

PPP in Light Rail Transit Systems in Spain

Light rail systems have proliferated in Spain in the last decade, following a tendency that is common not only in other European countries but also in other parts of the world. This paper reviews the benefits of light rail systems, both related to environmental issues and mobility issues. It analyses the evolution of light rail projects in Spain and shows that light rail systems in this country have evolved towards an extensive use of public-private partnerships. The analysis of the Spanish projects, however, does not contribute any conclusive evidence about whether public-private partnerships have been more efficient than publicly owned enterprises in building and operating light rail systems.

How Team Efficacy Beliefs Impact Project Performance: An Empirical Investigation of Team Potency in Capital Projects in the Process Industries

Team efficacy beliefs show promise in enhancing team performance. Using a model-based quantitative research design, we investigated the antecedents and performance consequences of generalized team efficacy (potency) in a sample of 56 capital projects executed by 15 Fortune 500 companies in the process industries. Empirical analysis of our field survey identified that generalized team efficacy beliefs were positively associated with an objective measure of project cost performance. Regression analysis revealed that team competence, empowering leadership, and performance feedback all predicted generalized team efficacy beliefs. Tests of mediation revealed that generalized team efficacy fully mediated between these three inputs and project cost performance.

Faculty-Industry R&D Joint Ventures: Barriers VS Incentives for Developing Nations

The aspiration of this research article is to target and focus the gains of university-Industry (U-I) collaborations and exploring those hurdles which are the obstacles for attaining these gains. University-Industry collaborations have attained great importance since 1980 in USA due to its application in all fields of life. U-I collaboration is a bilateral process where academia is a proactive member to make such alliances. Universities want to ameliorate their academic-base with the technicalities of technobabbles. U-I collaboration is becoming an essential lane for achieving innovative goals in this century. Many developed nations have set successful examples to prove this phenomenon as a catalyst to reduce costs, efforts and personnel for R&D projects. This study is exploits amplitudes of UI collaboration incentives in the light of success stories of developed countries. Many universities in USA, UK, Canada and various European Countries have been engaged with enterprises for numerous collaborative agreements. A long list of strategic and short term R&D projects has been executed in developed countries to accomplish their intended purposes. Due to the lack of intentions, genuine research and research-oriented environment, the mentioned field could not grow very well in developing countries. During last decade, a new wave of research has induced the institutes of developing countries to promote R&D culture especially in Pakistan. Higher Education Commission (HEC) has initiated many projects and funding supports for universities which have collaborative intentions with industry. Findings show that rapid innovation, overwhelm the technological complexities and articulated intellectual-base are major incentives which steer both partners to establish faculty-industry alliances. Everchanging technologies, concerned about intellectual property, different research environment and culture, research relevancy (Basic or applied), exposure differences and diversity of knowledge (bookish or practical) are main barriers to establish and retain joint ventures. Findings also concluded that, it is dire need to support and enhance cooperation among academia and industry to promote highly coordinated research behaviors. Author has proposed a roadmap for developing countries to promote R&D clusters among faculty and industry to deal the technological challenges and innovation complexities. Based on our research findings, Model for R&D Collaboration for developing countries also have been proposed to promote articulated R&D environment. If developing countries follow this phenomenon, rapid innovations can be achieved with limited R&D budget heads.

Evaluation of Urban Development Proposals An ANP Approach

In this paper a new approach to prioritize urban planning projects in an efficient and reliable way is presented. It is based on environmental pressure indices and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity of rank ordering urban development proposals according to their environmental pressure. The technique combines the use of Environmental Pressure Indicators, the aggregation of indicators in an Environmental Pressure Index by means of the Analytic Network Process method and interpreting the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts- judgments on each of the indicators into one Environmental Pressure Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts- estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The method has been applied to the proposal for urban development of La Carlota airport in Caracas (Venezuela). The Venezuelan Government would like to see a recreational project develop on the abandoned area and mean a significant improvement for the capital. There are currently three options on their table which are currently under evaluation. They include a Health Club, a Residential area and a Theme Park. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional techniques such as environmental impact studies, lifecycle analysis, etc. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods.

A Case Study of Applying Virtual Prototyping in Construction

The use of 3D computer-aided design (CAD) models to support construction project planning has been increasing in the previous year. 3D CAD models reveal more planning ideas by visually showing the construction site environment in different stages of the construction process. Using 3D CAD models together with scheduling software to prepare construction plan can identify errors in process sequence and spatial arrangement, which is vital to the success of a construction project. A number of 4D (3D plus time) CAD tools has been developed and utilized in different construction projects due to the awareness of their importance. Virtual prototyping extends the idea of 4D CAD by integrating more features for simulating real construction process. Virtual prototyping originates from the manufacturing industry where production of products such as cars and airplanes are virtually simulated in computer before they are built in the factory. Virtual prototyping integrates 3D CAD, simulation engine, analysis tools (like structural analysis and collision detection), and knowledgebase to streamline the whole product design and production process. In this paper, we present the application of a virtual prototyping software which has been used in a few construction projects in Hong Kong to support construction project planning. Specifically, the paper presents an implementation of virtual prototyping in a residential building project in Hong Kong. The applicability, difficulties and benefits of construction virtual prototyping are examined based on this project.

The Challenge of Large-Scale IT Projects

The trend in the world of Information Technology (IT) is getting increasingly large and difficult projects rather than smaller and easier. However, the data on large-scale IT project success rates provide cause for concern. This paper seeks to answer why large-scale IT projects are different from and more difficult than other typical engineering projects. Drawing on the industrial experience, a compilation of the conditions that influence failure is presented. With a view to improve success rates solutions are suggested.

Estimating the Runoff Using the Simple Tank Model and Comparing it with the SCS-CN Model - A Case Study of the Dez River Basin

Run-offs are considered as important hydrological factors in feasibility studies of river engineering and irrigation-related projects under arid and semi-arid condition. Flood control is one of the crucial factor, the management of which while mitigates its destructive consequences, abstracts considerable volume of renewable water resources. The methodology applied here was based on Mizumura, which applied a mathematical model for simple tank to simulate the rainfall-run-off process in a particular water basin using the data from the observational hydrograph. The model was applied in the Dez River water basin adjacent to Greater Dezful region, Iran in order to simulate and estimate the floods. Results indicated that the calculated hydrographs using the simple tank method, SCS-CN model and the observation hydrographs had a close proximity. It was also found that on average the flood time and discharge peaks in the simple tank were closer to the observational data than the CN method. On the other hand, the calculated flood volume in the CN model was significantly closer to the observational data than the simple tank model.

Financial Analysis Analogies for Software Risk

A dynamic software risk assessment model is presented. Analogies between dynamic financial analysis and software risk assessment models are established and based on these analogies it suggested that dynamic risk model for software projects is the way to move forward for the risk assessment of software project. It is shown how software risk assessment change during different phases of a software project and hence requires a dynamic risk assessment model to capture these variations. Further evolution of dynamic financial analysis models is discussed and mapped to the evolution of software risk assessment models.

Neuro-Hybrid Models for Automotive System Identification

In automotive systems almost all steps concerning the calibration of several control systems, e.g., low idle governor or boost pressure governor, are made with the vehicle because the timeto- production and cost requirements on the projects do not allow for the vehicle analysis necessary to build reliable models. Here is presented a procedure using parametric and NN (neural network) models that enables the generation of vehicle system models based on normal ECU engine control unit) vehicle measurements. These models are locally valid and permit pre and follow-up calibrations so that, only the final calibrations have to be done with the vehicle.

Lessons from Applying XP Methodology to Business Requirements Engineering in Developing Countries Context

Most standard software development methodologies are often not applied to software projects in many developing countries of the world. The approach generally practice is close to what eXtreme Programming (XP) is likely promoting, just keep coding and testing as the requirement evolves. XP is an agile software process development methodology that has inherent capability for improving efficiency of Business Software Development (BSD). XP can facilitate Business-to-Development (B2D) relationship due to its customer-oriented advocate. From practitioner point of view, we applied XP to BSD and result shows that customer involvement has positive impact on productivity, but can as well frustrate the success of the project. In an effort to promote software engineering practice in developing countries of Africa, we present the experiment performed, lessons learned, problems encountered and solution adopted in applying XP methodology to BSD.

Using Field Indices of Rill and Gully in order to Erosion Estimating and Sediment Analysis (Case Study: Menderjan Watershed in Isfahan Province, Iran)

Today, incorrect use of lands and land use changes, excessive grazing, no suitable using of agricultural farms, plowing on steep slopes, road construct, building construct, mine excavation etc have been caused increasing of soil erosion and sediment yield. For erosion and sediment estimation one can use statistical and empirical methods. This needs to identify land unit map and the map of effective factors. However, these empirical methods are usually time consuming and do not give accurate estimation of erosion. In this study, we applied GIS techniques to estimate erosion and sediment of Menderjan watershed at upstream Zayandehrud river in center of Iran. Erosion faces at each land unit were defined on the basis of land use, geology and land unit map using GIS. The UTM coordinates of each erosion type that showed more erosion amounts such as rills and gullies were inserted in GIS using GPS data. The frequency of erosion indicators at each land unit, land use and their sediment yield of these indices were calculated. Also using tendency analysis of sediment yield changes in watershed outlet (Menderjan hydrometric gauge station), was calculated related parameters and estimation errors. The results of this study according to implemented watershed management projects can be used for more rapid and more accurate estimation of erosion than traditional methods. These results can also be used for regional erosion assessment and can be used for remote sensing image processing.

A Study on Early Prediction of Fault Proneness in Software Modules using Genetic Algorithm

Fault-proneness of a software module is the probability that the module contains faults. To predict faultproneness of modules different techniques have been proposed which includes statistical methods, machine learning techniques, neural network techniques and clustering techniques. The aim of proposed study is to explore whether metrics available in the early lifecycle (i.e. requirement metrics), metrics available in the late lifecycle (i.e. code metrics) and metrics available in the early lifecycle (i.e. requirement metrics) combined with metrics available in the late lifecycle (i.e. code metrics) can be used to identify fault prone modules using Genetic Algorithm technique. This approach has been tested with real time defect C Programming language datasets of NASA software projects. The results show that the fusion of requirement and code metric is the best prediction model for detecting the faults as compared with commonly used code based model.

Improving the Road Construction Supply Chain by Developing a National Level Performance Measurement System: the Case of Estonia

Transport and logistics are the lifeblood of societies. There is a strong correlation between overall growth in economic activity and growth of transport. The movement of people and goods has the potential for creating wealth and prosperity, therefore the state of transportation infrastructure and especially the condition of road networks is often a governmental priority. The design, building and maintenance of national roads constitute a substantial share of government budgets. Taking into account the magnitude and importance of these investments, the expedience, efficiency and sustainability of these projects are of great public interest. This paper provides an overview of supply chain management principles applied to road construction. In addition, road construction performance measurement systems and ICT solutions are discussed. Road construction in Estonia is analyzed. The authors propose the development of a national performance measurement system for road construction.

Selection of Photovoltaic Solar Power Plant Investment Projects - An ANP Approach

In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences among elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. After analyzing the results the main conclusion is that the network model can manage all the information of the real-world problem and thus it is a decision analysis model recommended by the authors. The strengths and weaknesses ANP as a multicriteria decision analysis tool are also described in the paper.

Examination of Pre-Tender Budgeting Techniques for Mechanical and Electrical Services in Malaysia

The procurement and cost management approach adopted for mechanical and electrical (M&E) services in Malaysian construction industry have been criticized for its inefficiency. The study examined early cost estimating practices adopted for mechanical and electrical services (M&E) in Malaysia so as to understand the level of compliance of the current techniques with best practices. The methodology adopted for the study is a review of bidding documents used on both completed and on – going building projects awarded between 2008 – 2010 under 9th Malaysian Plan. The analysis revealed that, M&E services cost cannot be reliably estimated at pre-contract stage; the bidding techniques adopted for M&E services failed to provide uniform basis for contractors to submit tender; detailed measurement of items were not made which could complicate post contract cost control and financial management. The paper concluded that, there is need to follow a structured approach in determining the pre-contract cost estimate for M&E services which will serve as a virile tool for post contract cost control.