Abstract: Time-Cost Optimization "TCO" is one of the greatest challenges in construction project planning and control, since the optimization of either time or cost, would usually be at the expense of the other. Since there is a hidden trade-off relationship between project and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of the schedule compression. Recently third dimension in trade-off analysis is taken into consideration that is quality of the projects. Few of the existing algorithms are applied in a case of construction project with threedimensional trade-off analysis, Time-Cost-Quality relationships. The objective of this paper is to presents the development of a practical software system; that named Automatic Multi-objective Typical Construction Resource Optimization System "AMTCROS". This system incorporates the basic concepts of Line Of Balance "LOB" and Critical Path Method "CPM" in a multi-objective Genetic Algorithms "GAs" model. The main objective of this system is to provide a practical support for typical construction planners who need to optimize resource utilization in order to minimize project cost and duration while maximizing its quality simultaneously. The application of these research developments in planning the typical construction projects holds a strong promise to: 1) Increase the efficiency of resource use in typical construction projects; 2) Reduce construction duration period; 3) Minimize construction cost (direct cost plus indirect cost); and 4) Improve the quality of newly construction projects. A general description of the proposed software for the Time-Cost-Quality Trade-Off "TCQTO" is presented. The main inputs and outputs of the proposed software are outlined. The main subroutines and the inference engine of this software are detailed. The complexity analysis of the software is discussed. In addition, the verification, and complexity of the proposed software are proved and tested using a real case study.
Abstract: The use of 3D computer-aided design (CAD) models
to support construction project planning has been increasing in the
previous year. 3D CAD models reveal more planning ideas by
visually showing the construction site environment in different stages
of the construction process. Using 3D CAD models together with
scheduling software to prepare construction plan can identify errors
in process sequence and spatial arrangement, which is vital to the
success of a construction project. A number of 4D (3D plus time)
CAD tools has been developed and utilized in different construction
projects due to the awareness of their importance. Virtual prototyping
extends the idea of 4D CAD by integrating more features for
simulating real construction process. Virtual prototyping originates
from the manufacturing industry where production of products such
as cars and airplanes are virtually simulated in computer before they
are built in the factory. Virtual prototyping integrates 3D CAD,
simulation engine, analysis tools (like structural analysis and
collision detection), and knowledgebase to streamline the whole
product design and production process. In this paper, we present the
application of a virtual prototyping software which has been used in
a few construction projects in Hong Kong to support construction
project planning. Specifically, the paper presents an implementation
of virtual prototyping in a residential building project in Hong Kong.
The applicability, difficulties and benefits of construction virtual
prototyping are examined based on this project.