Abstract: Due to the deregulation of the Electric Supply
Industry and the resulting emergence of electricity market, the
volumes of power purchases are on the rise all over the world. In a
bid to meet the customer-s demand in a reliable and yet economic
manner, utilities purchase power from the energy market over and
above its own production. This paper aims at developing an optimal
power purchase model with two objectives viz economy and
environment ,taking various functional operating constraints such as
branch flow limits, load bus voltage magnitudes limits, unit capacity
constraints and security constraints into consideration.The price of
purchased power being an uncertain variable is modeled using fuzzy
logic. DEMO (Differential Evolution For Multi-objective
Optimization) is used to obtain the pareto-optimal solution set of the
multi-objective problem formulated. Fuzzy set theory has been
employed to extract the best compromise non-dominated solution.
The results obtained on IEEE 30 bus system are presented and
compared with that of NSGAII.