Abstract: Paper presents a low power, high speed, sense-amplifier based flip-flop (SAFF). The flip-flop’s power con-sumption and delay are greatly reduced by employing a new conditionally precharge sense-amplifier stage and a single-ended latch stage. Glitch-free and contention-free latch operation is achieved by using a conditional cut-off strategy. The design uses fewer transistors, has a lower clock load, and has a simple structure, all of which contribute to a near-zero setup time. When compared to previous flip-flop structures proposed for similar input/output conditions, this design’s performance and overall PDP have improved. The post layout simulation of the circuit uses 2.91µW of power and has a delay of 65.82 ps. Overall, the power-delay product has seen some enhancements. Cadence Virtuoso Designing tool with CMOS 90nm technology are used for all designs.
Abstract: In this paper, we introduce a flexible box erecting
machine (BEM) that swiftly and automatically transforms cardboard
into a three dimensional box. Recently, the parcel service and
home-shopping industries have grown rapidly, and there is an
increasing need for various box types to ship various products.
However, workers cannot fold thousands of boxes manually in a day.
As such, automatic BEMs are garnering greater attention. This study
takes equipment operation into consideration as well as mechanical
improvements in order to design a BEM that is able to outperform its
conventional counterparts. We analyzed six dispatching rules – First In
First Out (FIFO), Shortest Processing Time (SPT), Earliest Due Date
(EDD), Setup Avoidance, EDD + SPT, and EDD + Setup Avoidance –
to determine which one was most suitable for BEM operation.
Consequently, SPT and Setup Avoidance were found to be the most
critical rules, followed by EDD + Setup Avoidance, EDD + SPT,
EDD, and FIFO. This hierarchy was valid for both our conventional
BEM and our new flexible BEM from the viewpoint of processing
time. We believe that this research can contribute to flexible BEM
management, which has the potential to increase productivity and
convenience.
Abstract: This research presents a fuzzy multi-objective model
for a machine selection problem in a flexible manufacturing system
of a tire company. Two main objectives are minimization of an
average machine error and minimization of the total setup time.
Conventionally, the working team uses trial and error in selecting a
pressing machine for each task due to the complexity and constraints
of the problem. So, both objectives may not satisfy. Moreover, trial
and error takes a lot of time to get the final decision. Therefore, in
this research preemptive fuzzy goal programming model is developed
for solving this multi-objective problem. The proposed model can
obtain the appropriate results that the Decision Making (DM) is
satisfied for both objectives. Besides, alternative choice can be easily
generated by varying the satisfaction level. Additionally, decision
time can be reduced by using the model, which includes all
constraints of the system to generate the solutions. A numerical
example is also illustrated to show the effectiveness of the proposed
model.
Abstract: This paper focuses on robust design and optimization
of industrial production wastes. Past literatures were reviewed to case
study Clamason Industries Limited (CIL) - a leading ladder-tops
manufacturer. A painstaking study of the firm-s practices at the shop
floor revealed that Over-production, Waiting time, Excess inventory,
and Defects are the major wastes that are impeding their progress and
profitability. Design expert8 software was used to apply Taguchi
robust design and response surface methodology in order to model,
analyse and optimise the wastes cost in CIL. Waiting time and overproduction
rank first and second in contributing to the costs of wastes
in CIL. For minimal wastes cost the control factors of overproduction,
waiting-time, defects and excess-inventory must be set at
0.30, 390.70, 4 and 55.70 respectively for CIL. The optimal value of
cost of wastes for the months studied was 22.3679. Finally, a
recommendation was made that for the company to enhance their
profitability and customer satisfaction, they must adopt the Shingeo
Shingo-s Single Minute Exchange of Dies (SMED), which will
immediately tackle the waste of waiting by drastically reducing their
setup time.