The Application of Queuing Theory in Multi-Stage Production Lines

The purpose of this work is examining the multiproduct multi-stage in a battery production line. To improve the performances of an assembly production line by determine the efficiency of each workstation. Data collected from every workstation. The data are throughput rate, number of operator, and number of parts that arrive and leaves during part processing. Data for the number of parts that arrives and leaves are collected at least at the amount of ten samples to make the data is possible to be analyzed by Chi-Squared Goodness Test and queuing theory. Measures of this model served as the comparison with the standard data available in the company. Validation of the task time value resulted by comparing it with the task time value based on the company database. Some performance factors for the multi-product multi-stage in a battery production line in this work are shown. The efficiency in each workstation was also shown. Total production time to produce each part can be determined by adding the total task time in each workstation. To reduce the queuing time and increase the efficiency based on the analysis any probably improvement should be done. One probably action is by increasing the number of operators how manually operate this workstation.

Network Based Intrusion Detection and Prevention Systems in IP-Level Security Protocols

IPsec has now become a standard information security technology throughout the Internet society. It provides a well-defined architecture that takes into account confidentiality, authentication, integrity, secure key exchange and protection mechanism against replay attack also. For the connectionless security services on packet basis, IETF IPsec Working Group has standardized two extension headers (AH&ESP), key exchange and authentication protocols. It is also working on lightweight key exchange protocol and MIB's for security management. IPsec technology has been implemented on various platforms in IPv4 and IPv6, gradually replacing old application-specific security mechanisms. IPv4 and IPv6 are not directly compatible, so programs and systems designed to one standard can not communicate with those designed to the other. We propose the design and implementation of controlled Internet security system, which is IPsec-based Internet information security system in IPv4/IPv6 network and also we show the data of performance measurement. With the features like improved scalability and routing, security, ease-of-configuration, and higher performance of IPv6, the controlled Internet security system provides consistent security policy and integrated security management on IPsec-based Internet security system.

Developing Road Performance Measurement System with Evaluation Instrument

Transportation authorities need to provide the services and facilities that are critical to every country-s well-being and development. Management of the road network is becoming increasingly challenging as demands increase and resources are limited. Public sector institutions are integrating performance information into budgeting, managing and reporting via implementing performance measurement systems. In the face of growing challenges, performance measurement of road networks is attracting growing interest in many countries. The large scale of public investments makes the maintenance and development of road networks an area where such systems are an important assessment tool. Transportation agencies have been using performance measurement and modeling as part of pavement and bridge management systems. Recently the focus has been on extending the process to applications in road construction and maintenance systems, operations and safety programs, and administrative structures and procedures. To eliminate failure and dysfunctional consequences the importance of obtaining objective data and implementing evaluation instrument where necessary is presented in this paper

Towards an Integrated Proposal for Performance Measurement Indicators (Financial and Operational) in Advanced Production Practices

Starting with an analysis of the financial and operational indicators that can be found in the specialised literature, this study aims to contribute to improvements in the performance measurement systems used when the unit of analysis is the manufacturing plant. For this a search was done in the highest impact Journals of Production and Operations Management and Management Accounting , with the aim of determining the financial and operational indicators used to evaluate performance when Advanced Production Practices have been implemented, more specifically when the practices implemented are Total Quality Management, JIT/Lean Manufacturing and Total Productive Maintenance. This has enabled us to obtain a classification of the two types of indicators based on how much each is used. For the financial indicators we have also prepared a proposal that can be adapted to manufacturing plants- accounting features. In the near future we will propose a model that links practices implementation with financial and operational indicators and these two last with each other. We aim to will test this model empirically with the data obtained in the High Performance Manufacturing Project.

Improving the Road Construction Supply Chain by Developing a National Level Performance Measurement System: the Case of Estonia

Transport and logistics are the lifeblood of societies. There is a strong correlation between overall growth in economic activity and growth of transport. The movement of people and goods has the potential for creating wealth and prosperity, therefore the state of transportation infrastructure and especially the condition of road networks is often a governmental priority. The design, building and maintenance of national roads constitute a substantial share of government budgets. Taking into account the magnitude and importance of these investments, the expedience, efficiency and sustainability of these projects are of great public interest. This paper provides an overview of supply chain management principles applied to road construction. In addition, road construction performance measurement systems and ICT solutions are discussed. Road construction in Estonia is analyzed. The authors propose the development of a national performance measurement system for road construction.

Developing and Implementing Successful Key Performance Indicators

Measurement and the following evaluation of performance represent important part of management. The paper focuses on indicators as the basic elements of performance measurement system. It emphasizes a necessity of searching requirements for quality indicators so that they can become part of the useful system. It introduces standpoints for a systematic dividing of indicators so that they have as high as possible informative value of background sources for searching, analysis, designing and using of indicators. It draws attention to requirements for indicators' quality and at the same it deals with some dangers decreasing indicator's informative value. It submits a draft of questions that should be answered at the construction of indicator. It is obvious that particular indicators need to be defined exactly to stimulate the desired behavior in order to attain expected results. In the enclosure a concrete example of the defined indicator in the concrete conditions of a small firm is given. The authors of the paper pay attention to the fact that a quality indicator makes it possible to get to the basic causes of the problem and include the established facts into the company information system. At the same time they emphasize that developing of a quality indicator is a prerequisite for the utilization of the system of measurement in management.

Memory Estimation of Internet Server Using Queuing Theory: Comparative Study between M/G/1, G/M/1 and G/G/1 Queuing Model

How to effectively allocate system resource to process the Client request by Gateway servers is a challenging problem. In this paper, we propose an improved scheme for autonomous performance of Gateway servers under highly dynamic traffic loads. We devise a methodology to calculate Queue Length and Waiting Time utilizing Gateway Server information to reduce response time variance in presence of bursty traffic. The most widespread contemplation is performance, because Gateway Servers must offer cost-effective and high-availability services in the elongated period, thus they have to be scaled to meet the expected load. Performance measurements can be the base for performance modeling and prediction. With the help of performance models, the performance metrics (like buffer estimation, waiting time) can be determined at the development process. This paper describes the possible queue models those can be applied in the estimation of queue length to estimate the final value of the memory size. Both simulation and experimental studies using synthesized workloads and analysis of real-world Gateway Servers demonstrate the effectiveness of the proposed system.