Abstract: This paper presents the measurement and simulation results by Finite Element Method (FEM) for earth resistance (RDC) for interconnected vertical ground rod configurations. The soil resistivity was measured using the Wenner four-pin Method, and RDC was measured using the Fall of Potential (FOP) method, as outlined in the standard. Genetic Algorithm (GA) is employed to interpret the soil resistivity to that of a 2-layer soil model. The same soil resistivity data that were obtained by Wenner four-pin method were used in FEM for simulation. This paper compares the results of RDC obtained by FEM simulation with the real measurement at field site. A good agreement was seen for RDC obtained by measurements and FEM. This shows that FEM is a reliable software to be used for design of earthing systems. It is also found that the parallel rod system has a better performance compared to a similar setup using a grid layout.
Abstract: The present paper attempts to report on some findings that emerged out of a larger scale doctorate research into English language needs of a renowned Algerian company of Hydrocarbon industry. From a multifaceted English for specific purposes (ESP) research perspective, the paper considers the English needs of the finance/legal department staff in the midst of the conflicting needs perspectives involving both objective needs indicators (i.e., the pressure of globalised business) and the general negative attitudes among the administrative -mainly jurists- staff towards English (favouring a non-adaptation strategy). The researcher’s unearthing of the latter’s needs is an endeavour to concretise the concepts of unmet, or unconscious needs, among others. This is why, these initially uncovered hidden needs will be detailed questioning educational background, namely previous language of instruction; training experiences and expectations; as well as the actual communicative practices derived from the retrospective interviews and preliminary quantitative data of the questionnaire. Based on these rough clues suggesting real needs, the researcher will tentatively propose some implications for both pre-service and in-service training organisers as well as for educational policy makers in favour of an English course in legal English for the jurists mainly from pre-graduate phases to in-service training.
Abstract: This paper investigates the effects of breaks in bonds,
breaks in the earthing system and breaks in earth wire on the rise of
the earth potential (EPR) in a substation and at the transmission tower
bases using various models of an L6 tower. Different approaches
were adopted to examine the integrity of the earthing system and the
terminal towers. These effects were investigated to see the associated
difference in the EPR magnitudes with respect to a healthy system at
various locations. Comparisons of the computed EPR magnitudes
were then made between the healthy and unhealthy system to detect
any difference. The studies were conducted at power frequency for a
uniform soil with different soil resistivities. It was found that full
breaks in the double bond of the terminal towers increase the EPR
significantly at the fault location, while they reduce EPR at the
terminal tower bases. A fault on the isolated section of the grid can
result in EPR values up to 8 times of those on a healthy system at
higher soil resistivities, provided that the extended earthing system
stays connected to the grid.
Abstract: The parameters of a two-layer soil can be determined by
processing resistivity data obtained from resistivity measurements
carried out on the soil of interest. The processing usually entails
applying the resistivity data as inputs to an optimisation function.
This paper proposes an algorithm which utilises the square error as an
optimisation function. Resistivity data from previous works were
applied to test the accuracy of the new algorithm developed and the
result obtained conforms significantly to results from previous works.
Abstract: The prologue of new High Voltage (HV) transmission mains into the community necessitates earthing design to ensure safety compliance of the system. Concrete poles are widely used within HV transmission mains; many retired transmission mains with timber poles are being replaced with concrete ones, green transmission mains are deploying concrete poles. The earthing arrangement of the concrete poles could have an impact on the earth grid impedance also on the input impedance of the system from the fault point of view. This paper endeavors to provide information on the soil resistivity of the area and the deployments of concrete poles. It introduce the cut off soil resistivity value ρSC, this value aid in determine the impact of deploying the concrete poles on the earthing system. Multiple cases were discussed in this paper.
Abstract: Performing High Voltage (HV) tasks with a multi craft
work force create a special set of safety circumstances. This paper
aims to present vital information relating to when it is acceptable to
use a single or a two-layer soil structure. Also it discusses the
implication of the high voltage infrastructure on the earth grid and the
safety of this implication under a single or a two-layer soil structure.
A multiple case study is investigated to show the importance of using
the right soil resistivity structure during the earthing system design.
Abstract: The High Voltage (HV) transmission mains into the community necessitate earthing design to ensure safety compliance of the system. Concrete poles are widely used within HV transmission mains; which could have an impact on the earth grid impedance and input impedance of the system from the fault point of view. This paper provides information on concrete pole earthing to enhance the split factor of the system; further, it discusses the deployment of concrete structures in high soil resistivity area to reduce the earth grid system of the plant. This paper introduces the cut off soil resistivity SC ρ when replacing timber poles with concrete ones.
Abstract: Laboratory classes in Electrical Engineering are often hampered by safety issues, as students have to work on high voltage lines. One solution is to make use of virtual laboratory simulations, to help students understand the concepts taught in their coursework. In this context, we have conceived and implemented virtual lab experiments in connection with the study of earthing arrangements. In this work, software was developed, which aid student in understanding the working of a residual current device (RCD) in a TT earthing system. Various parameters, such as the earthing resistances, leakage currents and harmonics were included for a TT system with RCD connection.
Abstract: The demand on High voltage (HV) infrastructures is growing due to the corresponding growth in industries and population. New or upgraded HV infrastructure has safety implications since Transmission mains usually occupy the same easement in the vicinity of neighbouring residents. Transmission mains consist of underground (UG) and overhead (OH) sections and the transition between the UG and OH section is known as the UGOH pole. The existence of two transmission mains in the same easement can dictate to resort to more complicated earthing design in order to mitigate the effect of AC interference, and in some cases it can also necessitates completing a Split Study of the system. This paper provides an overview of the AC interference, Split Study and the earthing of an underground feeder including the UGOH pole .In addition, this paper discusses the use of different link boxes on the UG feeder and presents a case study that represent a clear example of the Ac interference and Split factor. Finally, a few recommendations are provided to achieve a safety zone in the area beyond the boundary of the HV system.
Abstract: The demand on High voltage (HV) infrastructures is growing due to the corresponding growth in industries and population. Many areas are being developed and therefore require additional electrical power to comply with the demand. Substation upgrade is one of the rapid solutions to ensure the continuous supply of power to customers. This upgrade requires civil modifications to structures and fences. The civil work requires excavation and steel works that may create unsafe touch conditions. This paper presents a brief theoretical overview of the touch voltage inside and around substations and uses CDEGS software to simulate a case study.
Abstract: The prologue of new High Voltage (HV) transmission
mains into the community necessitates earthing design to ensure
safety compliance of the system. Conductive structures such as steel
or concrete poles are widely used in HV transmission mains. The
earth potential rise (EPR) generated by a fault on these structures
could result to an unsafe condition. This paper discusses information
on the input impedance of the over head earth wire (OHEW) system
for finite and infinite transmission mains. The definition of finite and
infinite system is discussed, maximum EPR due to pole fault. The
simplified equations for EPR assessments are introduced and
discussed for the finite and infinite conditions. A case study is also
shown.
Abstract: As new challenges emerge in power electrical
workplace safety, it is the responsibility of the systems designer to
seek out new approaches and solutions that address them. Design
decisions made today will impact cost, safety and serviceability of
the installed systems for 40 or 50 years during the useful life for the
owner. Studies have shown that this cost is an order of magnitude of
7 to 10 times the installed cost of the power distribution equipment.
This paper reviews some aspects of earthing system design in power
substation surrounded by residential houses. The electrical potential
rise and split factors are discussed and a few recommendations are
provided to achieve a safety voltage in the area beyond the boundary
of the substation.