Abstract: The prologue of new High Voltage (HV) transmission mains into the community necessitates earthing design to ensure safety compliance of the system. Concrete poles are widely used within HV transmission mains; many retired transmission mains with timber poles are being replaced with concrete ones, green transmission mains are deploying concrete poles. The earthing arrangement of the concrete poles could have an impact on the earth grid impedance also on the input impedance of the system from the fault point of view. This paper endeavors to provide information on the soil resistivity of the area and the deployments of concrete poles. It introduce the cut off soil resistivity value ρSC, this value aid in determine the impact of deploying the concrete poles on the earthing system. Multiple cases were discussed in this paper.
Abstract: The High Voltage (HV) transmission mains into the community necessitate earthing design to ensure safety compliance of the system. Concrete poles are widely used within HV transmission mains; which could have an impact on the earth grid impedance and input impedance of the system from the fault point of view. This paper provides information on concrete pole earthing to enhance the split factor of the system; further, it discusses the deployment of concrete structures in high soil resistivity area to reduce the earth grid system of the plant. This paper introduces the cut off soil resistivity SC ρ when replacing timber poles with concrete ones.
Abstract: The demand on High voltage (HV) infrastructures is growing due to the corresponding growth in industries and population. New or upgraded HV infrastructure has safety implications since Transmission mains usually occupy the same easement in the vicinity of neighbouring residents. Transmission mains consist of underground (UG) and overhead (OH) sections and the transition between the UG and OH section is known as the UGOH pole. The existence of two transmission mains in the same easement can dictate to resort to more complicated earthing design in order to mitigate the effect of AC interference, and in some cases it can also necessitates completing a Split Study of the system. This paper provides an overview of the AC interference, Split Study and the earthing of an underground feeder including the UGOH pole .In addition, this paper discusses the use of different link boxes on the UG feeder and presents a case study that represent a clear example of the Ac interference and Split factor. Finally, a few recommendations are provided to achieve a safety zone in the area beyond the boundary of the HV system.
Abstract: Green house effect has becomes a serious concern in
many countries due to the increase consumption of the fossil fuel.
There have been many studies to find an alternative power source.
Wind energy found to be one of the most useful solutions to help in
overcoming the air pollution and global. There is no agreed solution
to conversion of wind energy to electrical energy. In this paper, the
advantages of using a Switched Reluctance Generator (SRG) for
wind energy applications. The theoretical study of the self excitation
of a SRG and the determination of the variable parameters in a SRG
design are discussed. The design parameters for the maximum power
output of the SRG are computed using Matlab simulation. The
designs of the circuit to control the variable parameters in a SRG to
provide the maximum power output are also discussed.
Abstract: The demand on High voltage (HV) infrastructures is growing due to the corresponding growth in industries and population. Many areas are being developed and therefore require additional electrical power to comply with the demand. Substation upgrade is one of the rapid solutions to ensure the continuous supply of power to customers. This upgrade requires civil modifications to structures and fences. The civil work requires excavation and steel works that may create unsafe touch conditions. This paper presents a brief theoretical overview of the touch voltage inside and around substations and uses CDEGS software to simulate a case study.
Abstract: The prologue of new High Voltage (HV) transmission
mains into the community necessitates earthing design to ensure
safety compliance of the system. Conductive structures such as steel
or concrete poles are widely used in HV transmission mains. The
earth potential rise (EPR) generated by a fault on these structures
could result to an unsafe condition. This paper discusses information
on the input impedance of the over head earth wire (OHEW) system
for finite and infinite transmission mains. The definition of finite and
infinite system is discussed, maximum EPR due to pole fault. The
simplified equations for EPR assessments are introduced and
discussed for the finite and infinite conditions. A case study is also
shown.