The Collapse of a Crane on Site: A Case Study

This paper discusses the causes of the structural failure in a tower crane. The structural collapse occurred at the upper joints of the extension element used to increase the height of the crane. The extension element consists of a steel lattice structure made with angular profiles and plates joined to the tower element by arc welding. Macroscopic inspection of the sections showed that the break was always observed on the angular profiles at the weld bead edge. The case study shows how, using mechanical characterization, chemical analysis of the steel and macroscopic and microscopic metallographic examinations, it was possible to obtain significant evidence that identified the mechanism causing the breakage. The analyses identified the causes of the structural failure as the use of materials that were not suitable for welding and poor performance in the welding joints.

Periodic Topology and Size Optimization Design of Tower Crane Boom

In order to achieve the layout and size optimization of the web members of tower crane boom, a truss topology and cross section size optimization method based on continuum is proposed considering three typical working conditions. Firstly, the optimization model is established by replacing web members with web plates. And the web plates are divided into several sub-domains so that periodic soft kill option (SKO) method can be carried out for topology optimization of the slender boom. After getting the optimized topology of web plates, the optimized layout of web members is formed through extracting the principal stress distribution. Finally, using the web member radius as design variable, the boom compliance as objective and the material volume of the boom as constraint, the cross section size optimization mathematical model is established. The size optimization criterion is deduced from the mathematical model by Lagrange multiplier method and Kuhn-Tucker condition. By comparing the original boom with the optimal boom, it is identified that this optimization method can effectively lighten the boom and improve its performance.

Travel Time Model for Cylinder Type Parking System

In this paper, we mainly analyze an automated parking system where the storage and retrieval requests are performed by a tower crane. In this parking system, the S/R crane which is located at the middle of the bottom of the cylinder parking area can rotate in both clockwise and counterclockwise and three kinds of movements can be done simultaneously. We develop some mathematical travel time models for the single command cycle under the random storage assignment using the characteristics of this system. Finally, we compare these travel models with discrete case and it is shown that these travel models display a good satisfactory performance.

Selection of a Tower Crane Using Augmented Reality in Smart Devices

Appropriate selection of lifting equipments for a high-rise building construction project is one of the important factors to the project’s success. Proper position of a tower crane on a construction site is so important to be determined by an expert or an experienced construction manager who draws working range of a tower crane and moves it over a 2D (dimensional) site layout plan. But it is not usual to use 3D CAD, BIM or virtual reality for temporary facility planning or selection of a tower crane. This study proposes a method to use augmented reality to select proper position of tower cranes. An augmented reality prototype is implemented on a smart device to verify the practicability of the proposed method.

Automatic Design Algorithm for the Tower Crane Foundations

Foundation of tower crane serves to ensure stability against vertical and horizontal forces. If foundation stress is not sufficient, tower crane may be subject to overturning, shearing or foundation settlement. Therefore, engineering review of stable support is a highly critical part of foundation design. However, there are not many professionals who can conduct engineering review of tower crane foundation and, if any, they have information only on a small number of cranes in which they have hands-on experience. It is also customary to rely on empirical knowledge and tower crane renter-s recommendations rather than designing foundation on the basis of engineering knowledge. Therefore, a foundation design automation system considering not only lifting conditions but also overturning risk, shearing and vertical force may facilitate production of foolproof foundation design for experts and enable even non-experts to utilize professional knowledge that only experts can access now. This study proposes Automatic Design Algorithm for the Tower Crane Foundations considering load and horizontal force.